Elevators in Llefià station.
Barcelona Metro Lines 9 and 10
Aeroport T1
S end
Airport Cargo Terminal
Aeroport T2
Mas Blau
depot
Parc Nou
end
Pratenc
Cèntric
former bed of the Llobregat
El Prat Estació
end
ZAL – Riu Vell
La Ribera
Ecoparc
Les Moreres
Port Comercial — La Factoria
Llobregat River
Zona Franca
Mercabarna
viaduct start 
Parc Logístic
Motors
common section
  Foc
Fira
to INEFC
Foneria
Ildefons Cerdà
(Ciutat de la Justícia)
Europa-Fira
Provençana
Can Tries-Gornal
Torrassa
Collblanc
S end
Camp Nou
Zona Universitària
S end
Campus Nord
Manuel Girona
Prat de la Riba
Sarrià
Mandri
El Putxet
Lesseps
Muntanya
Sanllehy
Guinardó-Hospital de Sant Pau
Plaça de Maragall
la Sagrera
N end
connection to Line 2 & Line 4
Triangle ferroviari depot
Onze de Setembre
Bon Pastor
Besòs River
Besòs junction
Llefià
Can Peixauet
la Salut
end
Gorg
Fondo
Església Major
Singuerlín
Can Zam
N end
Can Zam depot
Key
S Aeroport T1 - Zona Universitària
N La Sagrera - Can Zam
La Sagrera - Gorg
Stations under construction in italics

Line 10 (Polígon Pratenc – Gorg) is the name of one of the two branches of the Barcelona metro line 9, currently (2020) under construction and to be operated by TMB. Like Line 9 and Line 11, it will be an automatic train operation (i.e. driverless vehicle) metro line.

Overview

Llefià station.

The line will link the Zona Franca with Badalona, through Barcelona proper, sharing most of the area covered by L9. L9/10 will be the deepest and longest line in the network. Originally expected to be ready by 2008, ongoing problems with its construction are going to delay its completion until as late as 2025.

The line is currently operated in two sections, North and South, similarly to line 9.

Northern section

The section from Gorg to Bon Pastor opened on 18 April 2010,[1] and the section from La Sagrera to Bon Pastor (except Sagrera | TAV station) opened 26 June 2010. This section is operated as L10 Nord.

Southern section

On 8 September 2018[2] the section between Foc station and the junction with the main route of line 9 at Can Tries Gornal opened to the public, with the exception of the stations Ciutat de la Justícia and Provençana. The opening of these two stations was deferred to 2019, with the rest of the line on the viaduct through the Zona Franca proper opening between 2020 and 2025. Trains on this section operate between Zona Franca and Collblanc stations, as the line from Collblanc to Zona Universitària is single track and does not have sufficient capacity for both L9 and L10 to run. This section is operated as L10 Sud.

Provençana station opened to the public on 2 March 2019 followed by Ciutat de la Justícia on 24 November 2019. The section between Foc and Zona Franca, with the exception of the Motors station, opened on 1 February 2020. On 7 November 2021, the section from Zona Franca to ZAL - Riu Vell opened to the public.[3]

List of stations

(Stations under construction in italics)

Zona Franca area

  • Pratenc

Provisional L10 Sud Start

Central branch, shared with L9

Provisional L10 Sud End

Provisional L10 Nord Start

Besòs area

Provisional L10 Nord End

References

  1. "TMB estrena el tram Gorg-Bon Pastor de la L9/L10". Transports Metropolitans de Barcelona (in Catalan). 16 April 2010. Archived from the original on 7 June 2010. Retrieved 19 April 2010.
  2. "El metro de la Zona Franca, en servicio desde el 8 de septiembre". La Vanguardia (in Spanish). Europa Press. 8 August 2018. Archived from the original on 10 April 2020. Retrieved 11 September 2018.
  3. "L10 Sud now reaches the entire Zona Franca". Transports Metropolitans de Barcelona.

41°26′27″N 2°14′02″E / 41.44083°N 2.23389°E / 41.44083; 2.23389

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.