Grodzisk Mazowiecki Radońska | |
---|---|
General information | |
Location | Grodzisk Mazowiecki Poland |
Coordinates | 52°06′02″N 20°37′43″E / 52.10066°N 20.62852°E |
Line(s) | PKP rail line 47 (Warszawa Śródmieście WKD - Grodzisk Mazowiecki Radońska) |
Platforms | 2 |
History | |
Opened | 1927 |
Previous names | Grodzisk Mazowiecki Wozownia EKD |
Grodzisk Mazowiecki Radońska is a station of the Warsaw Commuter Railway located at Radońska in Grodzisk Mazowiecki, Poland.
Background
In 2018, the station served 5-6 thousand passengers per day, which gave it, together with the station Gdańsk Politechnika, 52nd place for most used station in the country.[1]
Grodzisk Mazowiecki Radońska is the terminus of the line. In the past, there were also stops behind the station: Grodzisk Mazowiecki Radońska/Sienkiewicza, Grodzisk Mazowiecki pl. Wolności and Grodzisk Mazowiecki 11 November. The line ended at the station Grodzisk Mazowiecki EKD, located next to the station PKP. This section closed in 1966.
In the vicinity of the station, there is the seat of the WKD company (ul. Batorego] 23), a depot for rolling stock and Chamber of Tradition EKD/WKD.
Line | Route | Time |
---|---|---|
Warsaw Śródmieście WKD – Pruszków WKD – Podkowa Leśna Główna – Grodzisk Maz. Radońska | 30/60 minutes |
Station description
Platforms
Until the start of reconstruction in May 2022, the station consisted of two side platformss with one platform edge each. On February 20, 2023, the reconstructed station was commissioned, consisting of one side platform and one island platform, and the total number of platform edges increased to three.[2][3]
Ticket office
At the first platform there is a station building.
Equipment:
- ticket office
- small waiting room
References
- ↑ Urząd Transportu Kolejowego. "Wymiana pasażerska na stacjach w Polsce w 2018 r." 2020-01-27. Retrieved 2020-01-30.
- ↑ Urbanowicz, Witold (2021-08-20). "Rusza przetarg na budowę drugiego toru WKD do Grodziska Maz". transport-publiczny.pl (in Polish). Retrieved 2023-04-25.
- ↑ Urbanowicz, Witold (2023-02-20). "WKD: Prace przy budowie drugiego toru na półmetku". transport-publiczny.pl (in Polish). Retrieved 2023-04-25.