M1 Yenikapı–Atatürk Airport/Yenikapı–Kirazlı–Halkalı | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operating | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Istanbul Metropolitan Municipality | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Istanbul, Turkey | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 23[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Istanbul Metro | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | 2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route number | M1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Metro Istanbul A.Ş. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Esenler | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | 105 ABB[1] 4 carriages per trainset | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 400,000[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | September 3, 1989[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 26.8[2] km (16.7 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of tracks | 2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 750 V DC Overhead line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 70 km/h (43 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Line M1, officially referred to as the M1 Yenikapı–Atatürk Airport/Kirazlı metro line (Turkish: M1 Yenikapı–Atatürk Havalimanı/Kirazlı metro hattı), also known as the Istanbul Light Metro (Turkish: Hafif Metro), is a rapid transit line of the Istanbul Metro. It is colored red on the maps and route signs. Opened in 1989, it was the first rapid transit line in Istanbul and Turkey and its opening started the revival of mass-transit in Turkish cities.
The M1 consists of two train services, M1A and M1B. Both services run on the same line from Yenikapı to Otogar, where the M1B branches off to Kirazlı, while the M1A continues on the original line to Istanbul Atatürk Airport. The M1 has 23 stations in service, of which 11 are underground and 3 elevated,[1] and the total length of the line is 26.8 kilometers (16.7 mi).[2] Even though the M1 is fully grade separated, it is considered a light metro line, due to the relatively low passenger capacity compared to other lines of the system.
In November 2014, the extension from Aksaray to Yenikapı was opened.[3]
History
With Istanbul's population growing and the city rapidly expanding outward, the bus service available in the city became insufficient in the 1970s and 1980s. At that time, the city did not have a mass transit rail system, except for a single 0.57 km (0.35 mi) funicular line known as Tünel – the last operating original tramline was closed in 1969. Istanbul desperately needed a rapid transit rail system to help transport its large population.
The first segment of the M1 line began service on September 3, 1989, between Aksaray and Kocatepe.[1] On December 18, 1989, the line was extended to Esenler,[1] but at that time the Otogar (Intercity Bus Station) was omitted. The Otogar station, and the segment between Otogar and Zeytinburnu stations on the M1A branch line, was opened on January 31, 1994.[1] Following this, the M1A segment between Zeytinburnu and Bakırköy stations was opened on July 3 of the same year.[1] Further extensions of the M1A line, to Ataköy and then Yenibosna stations, were opened in July and August 1995,[1] at which point the length of the line reached approximately 16 km. In 1999, a new M1A line station located between Ataköy and Bakırköy stations, the Bahçelievler station, opened. Finally, the M1A branch line was completed on December 20, 2002, when the extension to the World Trade Center and Atatürk Airport in Yeşilköy opened.
A rebuilt Esenler station opened on February 22, 2012.[1] The extension of the M1B branch line from Esenler to Kirazlı opened on June 14, 2013.[1]
The extension of the M1 line from Aksaray to Yenikapı was inaugurated on November 9, 2014, allowing connections with the M2 line and Marmaray commuter rail service, as well as İDO seabus service.[2][3] Using the M2 and Marmaray, passenger may travel north of the Golden Horn to Taksim, Mecidiyeköy, Levent and Maslak as well as across the Bosphorus to Üsküdar and Kadıköy. İDO seabuses offer service to coastal districts of Istanbul as well as other cities and towns on the Sea of Marmara.
Operations and route
A total of 105 trainsets transport up to 400,000 passenger daily between the operation hours from 6:00 in the early morning to 0:00 in the midnight.[1] The M1 line has a maximum headway of 2 ½ minutes during peak hours.[1] All stations have covered seating. A total of 135 escalators and 65 elevators make access to the stations easy for passengers.[1]
M1A line
The M1A line is 20 kilometers (12 mi) long in total,[4] and serves 18 stations. The trip between the termini stations, Yenikapı and Atatürk Airport, takes approximately 35 minutes.[2] Daily, 169 trains run in each direction between the termini stations, with a peak-hour headway of 6 minutes.[2]
On the M1A line, seven stations are built underground, nine are ground-level stations, and three are elevated. The stations are so structured that six of them have island platforms and eleven stations have side platforms. The connection station at Otogar in Esenler has two island platforms, which enable traffic on three tracks by the two different M1 branch lines.[2]
M1B line
The M1B line is 14.0 kilometers (8.7 mi) long in total,[5] and serves 13 stations. The trip between the termini stations, Yenikapı and Kirazlı, takes approximately 25 minutes.[6] Daily, 168 trains run in each direction between the termini stations, with a peak-hour headway of 4 minutes.[6]
On the M1B line, eight stations are built underground and five are ground-level stations. The stations are so structured that eight of them have island platforms and four stations have side platforms. The connection station at Otogar in Esenler has two island platforms, which enable traffic on three tracks by the two different M1 branch lines.[6]
Stations
M1 trunk section (served by both the M1A and M1B lines)
Station | District | Transfer | Notes |
---|---|---|---|
Yenikapı | Fatih | ・・・(Yenikapı Terminal)
İETT Bus: 30D, 31, 31Y, 36Y, 39, 39D, 39K, 41Y, 47A, 50Y, 70FY, 70KY, 72YT, 76A, 77, 88A, 146T, 336Y |
Yenikapı event space |
Aksaray | Yusufpaşa
İETT Bus: 31Y, 32T, 33E, 33TE, 38, 38Z, 39, 39D, 39K, 50B, 76A, 78, 78H, 79GE, 79T, 88A, 89T, 91E, 97G, 97GE, 142E, 146B, 146T, 336, E-59 |
||
Emniyet-Fatih | İETT Bus: 31Y, 32T, 33E, 33TE, 38, 38Z, 39, 39D, 39K, 50Y, 76A, 78, 78H, 79GE, 79T, 88A, 89T, 91E, 97G, 97GE, 142E, 146B, 146T, 336, E-59 | ||
Topkapı-Ulubatlı | Vatan
İETT Bus: 31Y, 32T, 33E, 33TE, 38, 38Z, 39, 39D, 39K, 50Y, 76A, 78, 78H, 79GE, 79T, 88A, 89T, 91E, 97G, 97GE, 142E, 146B, 146T, 336, E-59 |
Park and Ride facility | |
Bayrampaşa-Maltepe | Eyüpsultan | İETT Bus: | Axis Mall |
Sağmalcılar | Bayrampaşa | İETT Bus: 32, 32A, 32M, 32T | Bayrampaşa State Hospital |
Kocatepe | İETT Bus: HT5, HT6 | Forum İstanbul Mall | |
Otogar | İETT Bus: 39O, 75O, 76O, 83O, 303B | Bayrampaşa Grand İstanbul Bus Station |
M1A branch
Station | District | Transfer | Notes |
---|---|---|---|
Terazidere | Esenler | İETT Bus: | |
Davutpaşa-YTÜ | Güngören | İETT Bus: 33B, 41AT, 85C, 92B, 92C | Yıldız Technical University |
Merter |
İETT Bus: 31, 31E, 50B, 71T, 72T, 73, 73F, 76D, 79Ş, 82, 85T, 89, 89B, 89K, 92, 92T, 94, 94A, 94Y, 97, 97A, 97BT, 97T, H-9 |
Park and Ride facility | |
Zeytinburnu | Bakırköy | ・
İETT Bus: 31, 31E, 50B, 71T, 72T, 73, 73F, 76D, 78ZB, 79G, 79Ş, 82, 89A, 89B, 89K, 89M, 92, 93, 93C, 93M, 93T, 94, 94A, 94Y, 97, 97A, 97B, 97BT, 97KZ, 97T, H-9, MK97, MR10 |
|
Bakırköy-İncirli | (under construction)
İETT Bus: 31, 31E, 50B, 71T, 72T, 73, 73F, 76D, 78ZB, 79G, 79Ş, 82, 89, 89A, 89B, 89K, 89M, 89S, 92, 94, 94A, 94Y, 97, 97A, 97BT, 97E, 97KZ, 97T, H-9, HT13, MK97 |
||
Bahçelievler | Bahçelievler |
İETT Bus: 31, 31E, 36CY, 73, 73B, 73F, 73H, 73Y, 76, 76B, 76C, 76D, 76V, 76Y, 78ZB, 79B, 79G, 79Ş, 82, 89, 89A, 89B, 89K, 89M, 89S, 89YB, 97, 97BT, 97E, 97KZ, 98, 98A, 98AB, 98B, 98H, 98M, 98MB, 98S, 98T, 98TB, 146, E-57, H-9, HT13 |
|
Ataköy—Şirinevler | Bakırköy |
İETT Bus: 31, 31E, 36CY, 55Y, 73, 73B, 73F, 73H, 73Y, 76, 76B, 76C, 76D, 76V, 76Y, 78ZB, 79B, 79G, 79Ş, 82, 89, 89A, 89B, 89K, 89M, 89S, 89YB, 97, 97BT, 97E, 97KZ, 98, 98A, 98AB, 98B, 98H, 98M, 98MB, 98S, 98T, 98TB, 146, E-57, H-9, HT10, HT11, HT13, MR20 |
Park and Ride facility |
Yenibosna | (under construction)
İETT Bus: 36AY, 36CY, 55Y, 73, 78B, 79F, 79FY, 79K, 79Y, 82S, HS1, HT10, HT12, HT20, KÇ2, MR20 |
||
DTM—İstanbul Fuar Merkezi | İETT Bus: | World Trade Center and İstanbul Expo Center | |
Atatürk Havalimanı | İETT Bus: | Atatürk Airport |
M1B branch
Station | District | Transfer | Notes |
---|---|---|---|
Esenler | Esenler | İETT Bus: 33, 33M, 55Y, 75O, 76O, 85T, 303B | |
Menderes | İETT Bus: 33, 33M, 55Y, 85T, 98G | ||
Üçyüzlü | Bağcılar | İETT Bus: 33B, 36CY, 55Y, 85T, 92M, 98G, HT1 | |
Bağcılar Meydan | Bağcılar Merkez
İETT Bus: 36CY, 92, 92B, 92K, 92Ş, 97G, 98D, 98Y, HT1 |
300m walk between lines | |
Kirazlı |
İETT Bus: 92K, 98K, HT10, MK42 |
||
↓↓ Under construction (opening unknown) ↓↓ | |||
Barbaros | Bağcılar | İETT Bus: 78ZB, 97, 97E, 98A, 98M, HT13 | |
Malazgirt | İETT Bus: 97KZ, 98E, HT12 | ||
Mimar Sinan |
İETT Bus: 97, 97GE, 97M, 97KZ, 98E, HT1, HT12, MK22 |
||
Fatih | Küçükçekmece | İETT Bus: 89K, 98AB, KÇ2, MR42 | |
Halkalı Üniversite | İETT Bus: 36AS, 760, 76V, 79Y, 89, 89BS, 89F, 89K, 89S, 98, 98AB, 98KM, 98S, HT20, KÇ2, MR42 | ||
↓↓ Under planning ↓↓ | |||
Mehmet Akif Ersoy | Küçükçekmece | İETT Bus: 36AS, 76V, 79G, 79Ş, 89A, 89K, 89YB, 98AB, 141K, 141M, BN1, H-3, HT1, HT20, KÇ2, MK16, MK31, MR42 | |
Yenidoğan | İETT Bus: 36AS, 76V, 79G, 79Ş, 89A, 89K, 89YB, 98AB, 141K, 141M, BN1, H-3, HT1, HT20, KÇ2, MK16, MK31, MR42 | ||
Bezirganbahçe | İETT Bus: 76V, BN1, H-3, MK16, MR42 | ||
Halkalı | ・・
İETT Bus: 79Y, 89A, 143, BN1, H-3, MR40, MR42, MR50, MR51 |
As of November 2020, a 9.7 kilometers (6.0 mi) extension to a new terminus station at Halkalı is under construction. It will add nine stations to the M1B branch, west of Kirazlı offering an interchange with both the Marmaray and M11 lines.[7]
Rolling stock
Since this line is the oldest modern rail line in İstanbul, it has relatively old vehicles, produced by ABB in 1988. The vehicles reach a maximum speed of 80 km/h with an acceleration of 0.7 m/s2.
See also
- Istanbul modern tramways – Separate modern tramways (T1, T4 & T5) of Istanbul
- Istanbul nostalgic tramways – Two separate heritage tramways of Istanbul
- Trams in Istanbul – the first generation tramway network
- Marmaray
- Public transport in Istanbul – includes information on trams
- EsTram (Eskisehir)
- Antalya trams
- Kayseri tram (Kayseray)
References
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 "M1 Yenikapı – Atatürk Havalimanı / Kirazlı Metro Hattı" [M1 Yenikapı – Atatürk Airport / Kirazlı Metro Line] (in Turkish). İstanbul Ulaşim A.Ş. Archived from the original on October 6, 2015. Retrieved September 20, 2015.
- 1 2 3 4 5 6 "M1A Yenikapı-Atatürk Havalimanı Metro Hattı" [M1A Yenikapı-Atatürk Havalimanı Metro Line] (in Turkish). Metro İstanbul A.Ş. Retrieved November 29, 2020.
- 1 2 "PM Davutoğlu inaugurates İstanbul's Aksaray-Yenikapı metro". Today's Zaman. Feza Publications. November 9, 2014. Archived from the original on May 26, 2015. Retrieved November 9, 2014.
- ↑ "Yenikapı-Atatürk Havalimanı Metro Hattı".
- ↑ "Yenikapı-Kirazlı Metro Hattı".
- 1 2 3 "M1B Yenikapı-Kirazlı Metro Hattı" [M1B Yenikapı-Kirazlı Metro Line] (in Turkish). Metro İstanbul A.Ş. Retrieved November 29, 2020.
- ↑ "M1B Kirazli-Halkali Metro Line Extension". Metro İstanbul A.Ş. Retrieved November 29, 2020.
External links
Media related to Istanbul Metro line M1 at Wikimedia Commons