A and B Loop
refer to caption
A streetcar operating the B Loop route and crossing the Broadway Bridge in 2016
Overview
Other name(s)
  • Portland Streetcar Loop Project[1][2]
  • Central Loop Line (2012–2015)
StatusOperational
OwnerCity of Portland
LocalePortland, Oregon, U.S.
Stations52
Service
TypeStreetcar
SystemPortland Streetcar
Services2
Operator(s)
  • Portland Streetcar, Inc.
  • TriMet
Daily ridership
  • A Loop: 1,541
  • B Loop: 1,369
  • (Weekday, August 2022)[3]
History
OpenedSeptember 22, 2012 (2012-09-22)
Technical
Line length
  • A Loop: 6.1 mi (9.8 km)
  • B Loop: 6.6 mi (10.6 km)
CharacterAt-grade (mixed between street running and exclusive lane) and elevated[4]:17
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationOverhead line, 750 V DC
Route diagram

NW 11th & Marshall
NW 10th & Northrup
NW 9th & Lovejoy
Broadway Bridge
over Willamette River
N Broadway/Weidler & Ross
NW 11th/10th & Johnson
NW 11th/10th & Glisan
NE Weidler & 2nd
NE Broadway & 2nd
NW 11th/10th & Couch
NE Broadway/Weidler & Grand
NE 7th & Halsey
SW 11th/10th & Alder
NE Grand & Multnomah
Northeast 7th Avenue & Holladay
Central Library
NE Grand & Holladay
SW 11th & Taylor
NE Oregon & Grand
Art Museum
SW 11th and Jefferson
NE Grand & Hoyt
SW 11th/10th & Clay
NE MLK & Hoyt
SE Grand & Burnside
SW Park & Market/Mill
SE MLK & Burnside
SE Grand & Stark
SE MLK & Stark
PSU
Urban Center
SW 5th
& Market
SE Grand & Morrison
SE MLK & Morrison
SW 5th & Montgomery
SE Grand & Taylor
SE MLK & Taylor
SW 3rd & Harrison
SE Grand & Hawthorne
SE MLK & Hawthorne
SW Harrison Street
SE Grand & Mill
S River Parkway & Moody
SE MLK & Mill
S Moody & Meade
OMSI
Tilikum Crossing
over Willamette River

The A and B Loop is a streetcar circle route of the Portland Streetcar system in Portland, Oregon, United States. Operated by Portland Streetcar, Inc. and TriMet, it is made up of two separate services: the 6.1-mile (9.8 km) A Loop, which runs clockwise, and the 6.6-mile (10.6 km) B Loop, which runs counterclockwise. The route travels a loop between the east and west sides of the Willamette River by crossing the Broadway Bridge in the north and Tilikum Crossing in the south.

The A and B Loop connects Portland's downtown, Pearl District, Lloyd District, Central Eastside, and South Waterfront. It serves various landmarks and institutions, including the Rose Quarter, the Oregon Convention Center, the Oregon Museum of Science and Industry (OMSI), Oregon Health & Science University (OHSU), and Portland State University (PSU). Riders can transfer to Frequent Express (FX) and MAX Light Rail from several stations along the route.

Portland city officials considered an eastside streetcar line upon authorizing the Central City Streetcar on the west side in 1997. After several years of planning, the Portland Streetcar Loop Project was approved and held its groundbreaking in 2009. The first 3.3 miles (5.3 km) opened between the Broadway Bridge and OMSI on September 22, 2012. It was inaugurated by the Central Loop Line (CL Line) service, which ran additionally on the westside along 10th and 11th avenues. The opening of Tilikum Crossing in 2015 extended the streetcar from OMSI to the South Waterfront; this completed the loop, and the CL Line was rebranded to A and B Loop.

History

Planning

refer to caption
The Broadway Bridge in 2009, prior to the installation of streetcar tracks

In 1990, a citizen advisory committee, citing the 1988 Central City Plan, convinced the Portland City Council to develop a streetcar (then referred to as "trolley") network in downtown Portland.[5][6] In July 1997, the city council formally authorized the Central City Streetcar project. By then, discussions to expand streetcar service east of the Willamette River had also begun, and $200,000 was allocated to strengthen the outer lanes of the Hawthorne Bridge with the intention of having it carry a future line between OMSI and the Oregon Convention Center.[7] The Hawthorne Bridge was closed in March 1998 and reopened in April 1999 with the outer-lane decks rebuilt to accommodate notches for rails.[8][9] In July 2001, the Lloyd District Development Strategy proposed a separate plan that envisioned a Lloyd District transit hub, with modern streetcars complementing existing bus and MAX Light Rail service;[10] it suggested running streetcar lines on Broadway and Weidler streets through to the west side via the Broadway Bridge,[11][12] which had carried streetcars from 1913 to 1940.[13]

In February 2003,[14][15] Portland Streetcar officials, amid TriMet (Portland's regional transit agency) plans to construct a new bridge over the Willamette River for the Portland–Milwaukie Light Rail Project,[16] proposed an inner eastside loop route using the Broadway Bridge and TriMet's proposed bridge (instead of the Hawthorne Bridge). The city council adopted the Eastside Streetcar Alignment Study that June.[17] The study outlined a westside–eastside streetcar route that ran from the existing streetcar tracks in the Pearl District, across the Broadway Bridge to the Lloyd District, then south along Grand Avenue and Martin Luther King Jr. Boulevard to Hawthorne Boulevard. A southern crossing back to the west side depended upon whether the proposed bridge would be constructed, leaving that section undetermined at the time.[15][18] In 2008, the Portland–Milwaukie project steering committee selected a locally preferred alternative that included a new river crossing between the South Waterfront and OMSI near Caruthers Street;[19] this led to a decision to build the first phase of the eastside streetcar 3.3 miles (5.3 km) up to OMSI (farther south from Hawthorne Boulevard) until the new bridge could be completed, after which the streetcar would cross the bridge back to the west side to complete the loop.[20][21]

Funding and construction

Metro, the Portland metropolitan area's regional government, approved the eastside streetcar extension with the selection of a locally preferred alternative on July 20, 2006,[22][23] that the city council adopted in September 2007.[24] The total cost of the project, including the cost to purchase additional vehicles, amounted to $148.8 million.[4]:19 Portland allocated $27 million of city funds,[24] and $20 million from the state, $15.5 million from a local improvement district, and a combination of various other local or regional sources completed the locally sourced funding.[25] On April 30, 2009, U.S. Transportation Secretary Ray LaHood announced $75 million in federal funding for the project, the full amount that was requested.[26] It was the first streetcar project to receive funding under the Small Starts program in part due to the Obama administration's departure from the practices of the Bush administration, which had awarded the funding to projects based on speed across long routes.[27] The Small Starts allocation, secured in large part through the efforts of U.S. Representatives Earl Blumenauer and Peter DeFazio of Oregon, was the largest and final component of the financing plan and meant the project could proceed with construction.[26][28]

A blue and red-painted streetcar with "Made in USA" displayed on its side
Unveiling of the United Streetcar 10T3 prototype in July 2009

In January 2007, Oregon Iron Works was awarded a $4 million contract to locally produce a streetcar prototype as provided by the Transportation Equity Act of 2005.[29][30] On July 1, 2009, its subsidiary, United Streetcar, unveiled the first prototype in Portland;[31] it was the first U.S.-built streetcar in nearly 60 years.[32][33] That August, the city signed a $20 million contract to purchase six new vehicles from United Streetcar for the eastside extension.[34] In July 2011, the city council agreed to contractual changes that reduced the number of streetcars on order from six to five due to unanticipated costs related to production.[35] United Streetcar had relied on Czech streetcar manufacturer Škoda, which built the Portland Streetcar's first vehicles, to provide the propulsion system that eventually failed acceptance testing. Project officials subsequently opted to obtain the propulsion system from Austrian manufacturer Elin, which necessitated changes to the streetcar design to accommodate a different form factor. The changes led to higher costs and delayed the project for five months.[36]

Groundbreaking for the Portland Streetcar Loop Project took place on June 25, 2009.[37] Portland awarded the building contract to Stacy and Witbeck,[38] and construction began in August.[39] For the project route along city streets, crews laid tracks in three-to-four-block increments,[40] with each segment completed every four weeks. Excavation for the trackbed was eight feet (2.4 m) wide and 14 to 18 inches (36 to 46 cm) deep.[1] Workers closed the Broadway Bridge for renovation from July to September 2010.[41][42] To maintain the existing weight of the bridge after adding tracks, which was necessary to allow it to continue lifting its spans, workers replaced the deck with lighter fiber-reinforced concrete.[43][44] In the Pearl District, sections of what had been two bidirectional streets—Lovejoy and Northrup—were converted into one-way streets after rail was installed. The Lovejoy ramp on the west end of the Broadway Bridge reopened to traffic in November 2010.[45] In Southeast Portland, workers built a 425-foot (130 m) bridge that carried the streetcar from Southeast Stephens Street to the project's eastern terminus at OMSI.[46] The extension's overhead lines went live in April 2012, and testing continued through to opening day.[47]

Opening and closing the loop

refer to caption
A CL Line vehicle bound for OMSI on Northeast 7th Avenue in 2014

The 28-station,[4]:17 3.3-mile (5.3 km) eastside extension opened on September 22, 2012.[39][48] Portland Streetcar formed a new service called the "Central Loop Line" (CL Line) and renamed the original service on the west side the "North South Line" (NS Line).[49] The CL Line operated the eastside extension and ran additionally on the west side via 10th and 11th avenues for a total of 4.5 miles (7.2 km);[4]:19 it overlapped with the NS Line between Southwest Market Street and Northwest Northrup Street.[50] Service along the eastside segment commenced with frequencies of 18 minutes instead of 15 minutes (or 12 minutes as initially planned)[51] due to funding cuts by the city and TriMet,[52] and delivery delays from United Streetcar.[53] The delays additionally forced Portland Streetcar to deploy its entire fleet of 11 cars and operate without a spare. Local publications highlighted the resulting infrequent service and criticized the streetcar's reliability and slow speed.[51][52] Joseph Rose, writing for The Oregonian, called the streetcar the "Stumptown Slug" after he traveled quicker from OMSI to Powell's City of Books on foot.[54] The first new streetcar finally arrived in January 2013 and entered service on June 11.[55] Fares were $1 upon opening due to TriMet's discontinuation of the Free Rail Zone, which had allowed free use of the Portland Streetcar system.[56][57] TriMet had intended to cut service on bus route 6–ML King Jr Blvd, which ran alongside the eastside tracks, but increased service instead after interviewing riders.[51]

A view of the Tilikum Crossing bridge from the pedestrian and bicycle lane with a streetcar passing by
A streetcar on Tilikum Crossing in 2015

The second phase of the Portland Streetcar Loop Project, referred to as "Close the Loop",[58] which was later changed to "Complete the Loop",[59] extended the streetcar tracks from OMSI across the Willamette River to the South Waterfront.[58][60] This phase had awaited the Portland–Milwaukie project's new river crossing,[50] which finally began construction in 2011.[61] The project had a total cost of $6.7 million and included automatic train stop upgrades.[62] Construction of the streetcar components started in August 2013 with the installation of a turning loop on the intersection of Southeast Stephens Street, Grand Avenue, and Martin Luther King Jr. Boulevard.[63] From September to October that year, crews expanded the SE Water/OMSI streetcar platform and installed the streetcar-track connection with the new bridge. Shuttle buses carried riders in sections where the streetcar tracks were temporarily closed.[64] From June 26 to August 17, 2015, CL Line service ceased operating as part of Multnomah County's closure of the Broadway Bridge to make way for repainting.[65]

On August 30, 2015, a new temporary schedule eliminated the name CL Line in favor of two separately named routes: "A Loop" and "B Loop". A Loop and B Loop took over the CL Line route and were further extended on the west side via existing tracks from Southwest 10th and Market streets in downtown Portland to Southwest Moody and Meade streets in the South Waterfront. Streetcars began crossing the new bridge, which by then was named "Tilikum Crossing", but without carrying passengers across it, during a two-week transitional "pre-revenue service" phase.[66] The CL Line was formally re-branded as the "A and B Loop" on September 12, 2015,[67] when Tilikum Crossing opened to the public and began permitting streetcars to carry passengers on the route section across the bridge.[68][69]

Impact and later developments

Portland city and streetcar officials have credited the eastside extension with encouraging development along and near its route; they have claimed that major redevelopment projects in the Lloyd District,[70] including years-long efforts by Metro to build a convention center hotel,[71][72] began or were announced after the extension had started construction.[70] In 2013, Hassalo on Eighth broke ground at the Lloyd 700 "superblock", where the eastside extension was deliberately routed to support redevelopment.[73] OMSI began pursuing redevelopment plans for its location in Southeast Portland in 2008. Days before the eastside extension's opening, OMSI's senior vice president stated that the streetcar's presence "will be an important element in the development of the lower eastside".[70][74] In December 2021, OMSI submitted a formal proposal to the city for the "OMSI District", which plans to develop 10 city blocks into mixed-use buildings and includes up to 1,200 new housing units.[75] A study published for the Transportation Research Record in 2018 noted that observed stations along the CL Line increased employment around their areas by 22 percent, compared to just eight percent by Multnomah County, between 2006 and 2013.[76]

In February 2020, the Portland City Council adopted the Rose Lane Project in an effort to improve bus and streetcar travel times within the city.[77][78] The ongoing project aims to create red-painted dedicated lanes, remove or restrict on-street parking, and implement traffic-signal priority for buses and streetcars.[79] That October, the Portland Bureau of Transportation (PBOT) launched the MLK/Grand Transit Improvements project, a complement to the Rose Lane Project that added red lanes to the streetcar alignment on Grand Avenue and Martin Luther King Jr. Boulevard.[80] Work started on October 7 and was completed after four weeks.[81]

In April 2022, the City of Portland filed a lawsuit in Multnomah County Circuit Court against TriMet and Stacy and Witbeck for negligence and breach of contract. The city alleged that TriMet failed to oversee the contractor, whose workers, in turn, failed to "perform the work in a professional and workmanlike manner", in the construction of an elevated section of the streetcar near OMSI after cracked walls and foundational flaws were discovered. The city is seeking $10 million from the defendants for the cost of repairs.[82][83]

Service

As of January 2022, the A and B Loop operates from 5:30 am to 11:30 pm on weekdays, from 7:30 am to 11:30 pm on Saturdays, and from 7:30 am to 10:30 pm on Sundays. Headways in each direction range from 15 minutes between 10:00 am and 7:00 pm on weekdays and Saturdays to 20 minutes for all other times. Traveling a complete loop in either direction takes just under one hour.[84]

Ridership

In August 2022, the A Loop carried an average of 1,541 riders on weekdays while the B Loop carried 1,369 riders.[3] Prior to the COVID-19 pandemic, which impacted public transit ridership globally, the route had served significantly more riders; the A and B Loop carried 3,612 and 3,064, respectively, on weekdays in September 2019.[85] During the first two weeks from opening, about 3,200 riders used the eastside extension per day on weekdays, 1,700 fewer riders than what the westside line recorded when it opened.[86] Six months later, PBOT reported the streetcar collected only 55 percent of its expected fares; PBOT had projected fare revenues of $1 million annually, which would have resulted in an 11-percent farebox recovery ratio of its $8.9 million operating expenses.[87]

Forecasts used to help justify federal funding for the Portland Streetcar Loop Project predicted 8,100 average weekday trips during the first operating year, while an alternative forecasting method predicted 3,900 average weekday trips for the same period. The FTA recorded an actual usage of 2,500 average weekday trips for the first year. Analysis attributed the lower-than-anticipated ridership to less frequent service than planned (15-minute actual headways versus the planned 12 minutes) and overstated projections for the number of commuters transferring from outside the Central City.[4]:20–22 The overall system set a ridership record in February 2017; that year saw ridership increase by 10 percent, mostly along the eastside. The streetcar set another record in April 2018, when the A and B Loop recorded 7,424 riders per day on weekdays.[88]

Route

The A and B Loop is a circle route that runs across subdistricts contained within Portland's Central City,[89] namely downtown Portland, Pearl District, Lloyd District, Central Eastside, and South Waterfront.[90] It consists of two services that for a majority of the route operate in a one-way pair: the 6.1-mile (9.8 km) A Loop, which runs clockwise, and the 6.6-mile (10.6 km) B Loop, which runs counterclockwise.[91] From Southwest Market Street, the route travels north through downtown Portland to the Pearl District via 10th and 11th avenues. It turns east on Northwest 10th and Lovejoy towards the Broadway Bridge and crosses the Willamette River.[90] After the bridge, the tracks traverse Broadway and Weidler streets. The B Loop then turns right onto Northeast Grand Avenue, while the A Loop turns right on Northeast 7th Avenue, left on Oregon street, and another left onto Martin Luther King Jr. Boulevard. The lines reconnect at a turning loop on Southeast Stephens Street and enter an overpass at Harrison Street, which carries the route to OMSI.[50][90][92]

From OMSI, the streetcar tracks connect with the MAX tracks just west of the OMSI/Southeast Water MAX station as they approach Tilikum Crossing to cross the river back to the west side.[93][94] They split at the four-track South Waterfront/South Moody MAX station, where the streetcar tracks run in the middle of the station's island platforms but don’t stop at the station.[95] The route connects with the westside streetcar alignment on Southwest Moody Avenue then heads north towards RiverPlace. The tracks turn left on Southwest River Parkway, right on 4th Avenue, left on Montgomery Street, and split again on 5th Avenue. From the intersection of Southwest Montgomery and 5th, the A Loop crosses PSU's Urban Plaza diagonally for Mill Street, while the B Loop turns right onto 5th Avenue. The A Loop returns to Southwest 10th Avenue from Mill Street, while the B Loop turns left onto Market Street and proceeds until it returns to 11th Avenue.[90]

Stations

The A and B Loop serves 52 stations, 24 of which are shared with the NS Line.[84] Each platform is equipped with a ticket vending machine, real-time display system, and line information signs,[96] and is accessible to users with limited mobility.[97] Connections to FX and MAX Light Rail can be made at several stops along the route.[98][99]

List of A and B Loop stations
Station[84][100] Neighborhood Commenced Connections and notes[90]
A Loop B Loop
SW 10th & Clay SW 11th & Clay Downtown September 22, 2012 Connects to NS Line
Art Museum SW 11th & Jefferson Connects to NS Line
Serves Portland Art Museum
Central Library SW 11th & Taylor Connects to NS Line, MAX (Blue, Red)
Serves Central Library
SW 10th & Alder SW 11th & Alder Connects to NS Line
NW 10th & Couch NW 11th & Couch Pearl District Connects to NS Line
Serves The Armory
NW 10th & Glisan NW 11th & Glisan Connects to NS Line
NW 10th & Johnson NW 11th & Johnson Connects to NS Line
NW 9th & Lovejoy
NW 11th & Marshall
NW 10th & Northrup Connects to NS Line
N Weidler & Ross N Broadway & Ross Lloyd District Serves Rose Quarter
NE Weidler & 2nd NE Broadway & 2nd
NE Weidler & Grand NE Grand & Broadway
NE 7th & Halsey
NE 7th & Holladay NE Grand & Multnomah Connects to MAX (Blue, Green, Red)
NE Oregon & Grand NE Grand & Holladay
Oregon Convention Center NE Grand & Hoyt Connects to MAX (Blue, Green, Red)
Serves Oregon Convention Center
NE MLK & Burnside SE Grand & Burnside Central Eastside
SE MLK & Stark SE Grand & Stark
SE MLK & Morrison SE Grand & Morrison
SE MLK & Taylor SE Grand & Taylor
SE MLK & Hawthorne SE Grand & Hawthorne
SE MLK & Mill SE Grand & Mill
OMSI Connects to FX, MAX (Orange)
Serves OMSI, Tilikum Crossing
S Moody & Meade South Waterfront August 30, 2015 Connects to NS Line, FX, MAX (Orange)
Serves OHSU Robertson Life Sciences Building,[101] Tilikum Crossing
S River Parkway & Moody Downtown Connects to NS Line
SW Harrison Street Connects to NS Line
SW 3rd & Harrison Connects to NS Line
PSU Urban Center SW 5th & Montgomery Connects to NS Line, FX, MAX (Green, Orange, Yellow)
Serves Portland State University
SW 5th & Market Connects to NS Line
Serves Portland State University
SW Park & Mill SW Park & Market Connects to NS Line

References

  1. 1 2 "Construction Overview, The Portland Streetcar Loop Project". Portland Streetcar, Inc. Archived from the original on December 7, 2011. Retrieved February 9, 2022.
  2. "Portland Streetcar Loop Project (Formerly the Eastside Transit Alternatives Analysis) Locally Preferred Alternative" (PDF). Metro. Archived from the original (PDF) on May 27, 2010. Retrieved February 9, 2022.
  3. 1 2 "About Us Ridership + Performance". Portland Streetcar, Inc. Archived from the original on September 7, 2022. Retrieved September 7, 2022.
  4. 1 2 3 4 5 Streetcar Loop Project Before-and-After Study (2016) (PDF) (Report). Federal Transit Administration. 2016. Archived (PDF) from the original on March 24, 2021. Retrieved April 8, 2020.
  5. Mayer, James (March 31, 1988). "Portland City Council boldly goes into 2000". The Oregonian. p. 1.
  6. Ames, Sarah Carlin (October 18, 1990). "City Council goes forward with trolley line". The Oregonian. p. B10.
  7. Stewart, Bill (July 31, 1997). "Streetcars will return to Portland; the city council votes to pay for a westside loop of streetcars described as cheaper than light rail". The Oregonian. p. D1.
  8. Stewart, Bill (January 22, 1998). "Closure launches bridge make over". The Oregonian. p. D2.
  9. Stewart, Bill (April 24, 1999). "Wait no more: Sunday marks Hawthorne Bridge reopening". The Oregonian. p. C1.
  10. "Lloyd District Development Strategy" (PDF). Portland Development Commission. July 27, 2001. pp. 24–26. Archived (PDF) from the original on August 29, 2019. Retrieved August 29, 2019.
  11. Leeson, Fred (July 17, 2001). "Portland grand plans in works in Lloyd District". The Oregonian. p. B3.
  12. Leeson, Fred (July 20, 2001). "New streetcar route follows different mission". The Oregonian. p. 24.
  13. Wood, Sharon M. (April 23, 1984). "Robust Broadway Bridge celebrates 71st year in fine shape". The Oregonian. p. B5 via NewsBank.
  14. Leeson, Fred (February 17, 2003). "Streetcar officials seek eastside desire". The Oregonian. p. E2.
  15. 1 2 Leeson, Fred (June 6, 2003). "Streetcar backers propose loop through inner eastside". The Oregonian. p. D2.
  16. Oppenheimer, Laura (February 17, 2003). "South Corridor MAX plan unveiled". The Oregonian. p. E1.
  17. "Eastside Streetcar Alignment Study" (PDF). Portland Office of Transportation. June 25, 2003. Archived (PDF) from the original on March 11, 2020. Retrieved March 11, 2020.
  18. Stern, Henry; Nkrumah, Wade (June 26, 2003). "City Council watch". The Oregonian. p. C2.
  19. Mortenson, Eric (May 2, 2008). "Panel realigns route of new light-rail span". The Oregonian. p. D1.
  20. Portland Streetcar Loop Development Strategy (PDF) (Report). Portland Office of Transportation. April 14, 2008. p. 1. Archived (PDF) from the original on March 9, 2022. Retrieved April 9, 2020.
  21. Portland Streetcar Loop environmental assessment: Finding of no significant impact (PDF) (Report). Metro. July 9, 2008. p. 2. Archived (PDF) from the original on October 18, 2020. Retrieved April 9, 2020.
  22. Eastside Transit Project Locally Preferred Alternative Report (PDF) (Report). Metro. July 20, 2006. p. 1. Archived from the original (PDF) on May 27, 2010.
  23. McGrain, Maureen (July 28, 2006). "Metro says yes to expansion for streetcar". Portland Business Journal. Archived from the original on October 12, 2008. Retrieved May 20, 2009.
  24. 1 2 Mayer, James (September 7, 2007). "Streetcar extension gets green light". The Oregonian. p. D1.
  25. "The Portland Streetcar Loop Facts at a Glance" (PDF). Portland Streetcar, Inc. May 2010. Archived from the original (PDF) on August 21, 2010. Retrieved August 30, 2010.
  26. 1 2 Pope, Charles; Rivera, Dylan (April 30, 2009). "Feds approve $75 million for streetcar expansion". The Oregonian. Archived from the original on October 5, 2012. Retrieved September 10, 2012.
  27. Miner, Colin (October 26, 2009). "Funding a Desire Named Streetcar". The New York Times. Archived from the original on March 28, 2015. Retrieved February 22, 2022.
  28. "Feds give $75 million for Oregon streetcar". Portland Business Journal. April 30, 2009. Archived from the original on October 25, 2012. Retrieved September 10, 2012.
  29. Hamilton, Don (August 5, 2005). "Iron firm forges streetcar desire". Portland Tribune. Archived from the original on March 31, 2012. Retrieved April 4, 2020.
  30. "Oregon Iron Works gets contract for streetcar". Portland Business Journal. January 26, 2007. Archived from the original on January 11, 2022. Retrieved December 19, 2012.
  31. Brugger, Joe (July 1, 2009). "Transportation secretary watches as 'Made in USA' streetcar makes debut". The Oregonian. Archived from the original on July 5, 2009. Retrieved June 4, 2019.
  32. MacKinnon, Merry (May 13, 2009). "Streetcars soon to be made in Oregon". Portland Tribune. Archived from the original on June 10, 2020. Retrieved June 10, 2020.
  33. Redden, Jim (June 13, 2012). "Streetcar on a roll, but not just yet". Portland Tribune. Archived from the original on August 4, 2019. Retrieved May 14, 2020.
  34. Rivera, Dylan (August 14, 2009). "Portland inks $20 million deal for locally made streetcars". The Oregonian. Archived from the original on August 17, 2009. Retrieved June 4, 2019.
  35. Webber, Angela (July 20, 2011). "Eastside streetcar loop will be delayed, number of cars reduced". Daily Journal of Commerce. Archived from the original on May 12, 2021. Retrieved April 3, 2020.
  36. Schmidt, Brad (July 19, 2011). "Portland's $148.3 million eastside streetcar project delayed five months, includes five streetcars instead of six". The Oregonian. Archived from the original on June 18, 2012. Retrieved September 10, 2012.
  37. Baer, April (June 25, 2009). "Construction Begins On Eastside Streetcar Loop". Oregon Public Broadcasting. Archived from the original on October 24, 2014. Retrieved April 2, 2020.
  38. Carinci, Justin (February 17, 2009). "Stacy and Witbeck wins streetcar contract". Daily Journal of Commerce. Archived from the original on January 11, 2022. Retrieved April 10, 2020.
  39. 1 2 "Streetcar History". Portland Streetcar, Inc. Archived from the original on December 3, 2013. Retrieved September 7, 2015.
  40. Carter, Dan (February 9, 2010). "Streetcar Loop Project". Daily Journal of Commerce. Archived from the original on March 9, 2021. Retrieved April 2, 2020.
  41. Rose, Joseph; Bella, Rick; Muldoon, Katy (July 18, 2010). "Portland – Broadway Bridge will close". The Oregonian.
  42. Rose, Joseph (September 2, 2010). "Two lanes, sidewalk of Portland's Broadway Bridge set to reopen Saturday". The Oregonian. Archived from the original on October 12, 2010. Retrieved June 10, 2020.
  43. Rose, Joseph (July 5, 2010). "Streetcar work shutting down Broadway Bridge". The Oregonian. p. A10. Archived from the original on November 10, 2013. Retrieved November 9, 2013.
  44. Vorenberg, Sue (February 18, 2011). "Streetcar work wraps up on Broadway Bridge". Daily Journal of Commerce. Archived from the original on July 23, 2011. Retrieved April 3, 2020.
  45. Vorenberg, Sue (November 5, 2010). "Pearl streets reopen with changed traffic patterns". Daily Journal of Commerce. Archived from the original on December 28, 2015. Retrieved April 3, 2020.
  46. Carter, Dan (December 22, 2010). "Portland Streetcar flyover bridge near OMSI". Daily Journal of Commerce. Archived from the original on December 28, 2015. Retrieved April 3, 2020.
  47. Rose, Joseph (April 26, 2012). "Portland Streetcar Loop extension's overhead wires go 'hot' Friday morning". The Oregonian. Archived from the original on March 9, 2021. Retrieved February 9, 2022.
  48. Rose, Joseph (September 22, 2012). "The little trolley that might not". The Oregonian.
  49. "Portland Streetcar Introduces 'Central Loop' Service". Passenger Transport. American Public Transportation Association. October 5, 2012. Archived from the original on February 2, 2014. Retrieved January 26, 2014.
  50. 1 2 3 Streetcar Route Map (2012) (PDF) (Map). Portland Streetcar, Inc. September 2012. Archived from the original (PDF) on October 21, 2012. Retrieved October 1, 2012.
  51. 1 2 3 Mesh, Aaron (August 21, 2012). "Slow Ride". Willamette Week. Archived from the original on July 14, 2018. Retrieved February 15, 2022.
  52. 1 2 Rose, Joseph (September 21, 2012). "Portland Streetcar's eastside loop gets off to hobbled start Saturday". The Oregonian. Archived from the original on October 29, 2012. Retrieved September 7, 2015.
  53. Schmidt, Brad (June 12, 2012). "United Streetcar months behind schedule on streetcars for Portland's eastside line". The Oregonian. Archived from the original on February 26, 2021. Retrieved February 9, 2022.
  54. Rose, Joseph (February 8, 2013). "Joseph Rose vs. the Portland Streetcar: Walking wins in showdown of city's poky commuting modes (video)". The Oregonian. Archived from the original on February 9, 2022. Retrieved February 26, 2022.
  55. Schmidt, Brad (June 12, 2013). "New streetcar rolls out in Portland". The Oregonian. p. B1. Archived from the original on June 16, 2013. Retrieved August 6, 2013.
  56. "Portland Streetcar Introduces 'Central Loop' Service". Passenger Transport. American Public Transportation Association. October 5, 2012. Archived from the original on February 2, 2014. Retrieved September 8, 2015.
  57. Mayer, James (August 4, 2012). "New Portland Streetcar fare starts next month". The Oregonian.
  58. 1 2 "Construction Overview, "Close the Loop" Project". Portland Streetcar, Inc. Archived from the original on December 5, 2013. Retrieved February 27, 2022.
  59. "Construction Overview, "Complete the Loop" Project". Portland Streetcar, Inc. Archived from the original on June 23, 2015. Retrieved February 27, 2022.
  60. "Portland Streetcar System Concept Plan: A Framework for Future Corridor Planning and Alternatives Analysis". Portland Bureau of Transportation. September 9, 2009. p. 50. Archived from the original on June 15, 2020. Retrieved April 10, 2020.
  61. Pyrah, Alli (July 29, 2014). "Watch Tilikum Crossing being built in 1 minute, 37 seconds". Portland Business Journal. Archived from the original on October 19, 2014. Retrieved May 14, 2020.
  62. "Close the Loop Streetcar". Portland Bureau of Transportation. Archived from the original on January 11, 2022. Retrieved April 10, 2020.
  63. "Traffic Advisory: Streetcar track work to close lanes on SE MLK Blvd Aug. 5-9; buses to replace streetcar service during construction" (Press release). Portland Bureau of Transportation. August 9, 2013. Archived from the original on January 11, 2022. Retrieved April 10, 2020.
  64. "Construction Updates, Portland Streetcar "Close the Loop" Project". Portland Streetcar, Inc. Archived from the original on September 19, 2013. Retrieved February 27, 2022.
  65. "Portland Streetcar Service Updates". Portland Streetcar, Inc. Archived from the original on September 24, 2015. Retrieved February 23, 2022.
  66. "Portland Streetcar Loop Service". Portland Streetcar, Inc. Archived from the original on August 6, 2015. Retrieved September 7, 2015.
  67. "About Us, Streetcar History". Portland Streetcar, Inc. Archived from the original on November 27, 2021. Retrieved March 7, 2022.
  68. Vincent, John M. (September 8, 2015). "Routes, fares change with expanded streetcar service". Portland Tribune. p. A3. Archived from the original on November 28, 2015. Retrieved August 23, 2019.
  69. "Portland Streetcar Loop Service". Portland Streetcar, Inc. Archived from the original on September 28, 2015. Retrieved February 23, 2022.
  70. 1 2 3 Redden, Jim (September 19, 2012). "Track Town heads east". Portland Tribune. Archived from the original on February 15, 2022. Retrieved February 14, 2022.
  71. Marum, Anna (August 4, 2017). "8 things to know about Portland's biggest hotel project". The Oregonian. Archived from the original on February 15, 2022. Retrieved February 14, 2022.
  72. "Hyatt Regency Portland at the Oregon Convention Center opens to the public" (Press release). Metro. December 27, 2019. Archived from the original on February 15, 2022. Retrieved February 14, 2022.
  73. Redden, Jim (September 19, 2013). "Streetcar's odd turn boosts Lloyd District". Portland Tribune. Archived from the original on September 22, 2013. Retrieved February 14, 2022.
  74. Peel, Sophie (December 2, 2021). "Oregon Museum of Science and Industry Releases Renderings of Long-Awaited OMSI District". Willamette Week. Archived from the original on March 10, 2022. Retrieved February 28, 2022.
  75. Ramakrishnan, Jayati (December 15, 2021). "OMSI seeks city approval for high-rise development in SE Portland". The Oregonian. Archived from the original on February 28, 2022. Retrieved February 28, 2022.
  76. Hinners, Sarah Jack; Nelson, Arthur C.; Buchert, Martin (2018). "Streetcars and Economic Development: Do Streetcars Stimulate Employment Growth?". Transportation Research Record: Journal of the Transportation Research Board. SAGE Publications (published October 6, 2018). 2672 (8): 339–350. doi:10.1177/0361198118790096. hdl:10150/636735. S2CID 117164232. Archived from the original on February 15, 2022. Retrieved February 14, 2022.
  77. "About the Rose Lane Project". City of Portland. Archived from the original on February 25, 2022. Retrieved February 25, 2022.
  78. "Rose Lane Project, Implementing Transit Priority Projects in Portland". Portland Bureau of Transportation. February 2020. Archived from the original on January 21, 2022. Retrieved February 25, 2022.
  79. Theen, Andrew (February 14, 2020). "Portland adopts Rose Lane vision, will try to unclog bus and streetcar traffic". The Oregonian. Archived from the original on February 25, 2022. Retrieved February 25, 2022.
  80. "News Release: Rose Lane Project roll out continues this month with new projects on Martin Luther King Jr. Boulevard, Grand Avenue and NW Broadway" (Press release). City of Portland. October 1, 2020. Archived from the original on February 25, 2022. Retrieved February 25, 2022.
  81. "MLK/Grand Transit Lane Improvements". City of Portland. Archived from the original on February 25, 2022. Retrieved February 25, 2022.
  82. Ellis, Rebecca (April 4, 2022). "City of Portland sues TriMet for $10 million over claims of faulty construction work". Oregon Public Broadcasting. Archived from the original on April 5, 2022. Retrieved April 6, 2022.
  83. Ramakrishnan, Jayati (April 5, 2022). "Portland sues TriMet for $10 million, alleging poor construction work at streetcar platform". The Oregonian. Archived from the original on April 5, 2022. Retrieved April 6, 2022.
  84. 1 2 3 "Maps + Schedules". Portland Streetcar, Inc. Archived from the original on January 11, 2022. Retrieved January 11, 2022.
  85. "Portland Streetcar Ridership" (PDF). Portland Streetcar, Inc. May 2020. Archived (PDF) from the original on September 23, 2020. Retrieved January 11, 2022.
  86. Giegerich, Andy (October 31, 2012). "Eastside streetcar: Carrying the wait". Portland Business Journal. Archived from the original on January 11, 2022. Retrieved April 5, 2020.
  87. Kost, Ryan (March 14, 2013). "Streetcar takes another hit with lower-than-expected fare revenue: Portland City Hall roundup". The Oregonian. Archived from the original on April 10, 2021. Retrieved February 9, 2022.
  88. "Portland Streetcar sees record ridership in April" (Press release). Portland Streetcar, Inc. May 15, 2018. Archived from the original on March 21, 2019. Retrieved February 9, 2022.
  89. "About Portland's Central City and the CC2035 Plan". City of Portland. Retrieved June 22, 2022.
  90. 1 2 3 4 5 Streetcar Route Map (PDF) (Map). Portland Streetcar, Inc. September 2015. Archived from the original (PDF) on September 14, 2015.
  91. "Towing Procedures for Portland Street Tows". City of Portland. November 27, 2015. Archived from the original on April 15, 2020. Retrieved April 14, 2020.
  92. Google (April 6, 2020). "SE Water/OMSI (Streetcar)" (Map). Google Maps. Google. Retrieved April 6, 2020.
  93. "OMSI/SE Water Ave Station". TriMet. October 2014. Archived from the original on March 2, 2019. Retrieved April 10, 2020.
  94. Google (April 10, 2020). "OMSI/SE Water MAX Station" (Map). Google Maps. Google. Retrieved April 10, 2020.
  95. "South Waterfront/SW Moody Ave Station". TriMet. October 2014. Archived from the original on January 5, 2021. Retrieved April 10, 2020.
  96. "Ride Guide". Portland Streetcar, Inc. Archived from the original on March 21, 2019. Retrieved April 1, 2019.
  97. "Accessibility Info". Portland Streetcar, Inc. Archived from the original on February 1, 2012. Retrieved June 6, 2019.
  98. FX2-Division Route (Map). TriMet. Archived from the original on August 12, 2022. Retrieved August 20, 2022.
  99. Portland City Center and Transit Mall (Map). TriMet. Archived from the original (PDF) on September 18, 2022. Retrieved July 30, 2018.
  100. "Maps + Schedules All Stops". Portland Streetcar, Inc. Archived from the original on June 1, 2021. Retrieved March 15, 2022.
  101. "Robertson Life Sciences Building". Oregon Health & Science University. Archived from the original on January 14, 2022. Retrieved January 14, 2022.
Template:Attached KML/A and B Loop
KML is from Wikidata
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.