Mactan–Cebu International Airport Tugpahanang Pangkalibutanon sa Mactan–Sugbo Paliparang Pandaigdig ng Mactan–Cebu | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Summary | |||||||||||||||
Airport type | Public | ||||||||||||||
Owner | Mactan–Cebu International Airport Authority | ||||||||||||||
Operator | Aboitiz InfraCapital Inc. GMR–Megawide Cebu Airport Corporation | ||||||||||||||
Serves | Cebu | ||||||||||||||
Location | Lapu-Lapu City, Cebu, Philippines | ||||||||||||||
Opened | April 27, 1966 | ||||||||||||||
Hub for | |||||||||||||||
Operating base for | |||||||||||||||
Time zone | PHT (UTC+08:00) | ||||||||||||||
Elevation AMSL | 9 m / 31 ft | ||||||||||||||
Coordinates | 10°18′26″N 123°58′44″E / 10.30722°N 123.97889°E | ||||||||||||||
Website | mactancebuairport | ||||||||||||||
Maps | |||||||||||||||
CEB/RPVM CEB/RPVM CEB/RPVM | |||||||||||||||
Runways | |||||||||||||||
| |||||||||||||||
Statistics (2022) | |||||||||||||||
| |||||||||||||||
Source: MCIAA[2] |
Mactan–Cebu International Airport (Cebuano: Tugpahanang Pangkalibutanon sa Mactan–Sugbo, Filipino: Paliparang Pandaigdig ng Mactan–Cebu; IATA: CEB, ICAO: RPVM) is an international airport serving Cebu and serves as the main gateway to the Central Visayas region in the Philippines. Located on a 797-hectare (1,970-acre) site in Lapu-Lapu City on Mactan, it is the second busiest airport in the Philippines.[3] Opened on April 27, 1966, the airport serves as a hub for Philippine Airlines, and as an operating base for Cebu Pacific and Philippines AirAsia.
The airport is managed by the Mactan–Cebu International Airport Authority and operated by the GMR–Megawide Cebu Airport Corporation.
History
Early years
The runway was built by the United States Air Force in 1956 as an emergency airport for Strategic Air Command bombers and it was known as the Mactan Air Base.[4] It remained a spartan outpost until the Vietnam War in the 1960s when it became a base for a C-130 unit of the U.S. Air Force.[4]
Commercial operations started on April 27, 1966[5] for domestic flights. It replaced the now closed Lahug Airport (now the site of Cebu IT Park) which could no longer be expanded due to safety and physical problems. International charter flights later commenced in 1978.[6]
On July 31, 1990, Republic Act No. 6958 was approved, which creates and establishes the Mactan–Cebu International Airport Authority (MCIAA). The law transferred the existing assets and operations of Mactan–Cebu International Airport and Lahug Airport to the newly-created MCIAA.[7]
Expansion
Plans for a new terminal were laid as early as 2005, but the expansion of the existing terminal was instead pursued. By 2009, the airport handled 4.8 million passengers, way beyond the capacity of 4.5 million. By 2017, the airport handled more than ten million passengers.[6]
The expansion of the airport was included on the list of big-ticket public-private partnership (PPP) projects as part of the PPP infrastructure program that was launched in 2010. Bidding was opened in 2012.[6] On April 23, 2014, the Department of Transportation and Communications awarded the operations and maintenance of MCIA to a consortium of the Philippine Megawide Construction Corporation and Bangalore-based GMR Infrastructure. The consortium won with a bid of ₱17.5 billion. MCIAA handed over the operations and maintenance of the airport to the private consortium on November 1, 2014.[8][9][10]
On June 29, 2015, President Benigno Aquino III led the ground-breaking rites at the site of the old Philippine Air Force base in Lapu-Lapu City which had been demolished to give way for the Terminal 2 construction.[11] Construction of Terminal 2 began on January 22, 2016.[12] On June 7, 2018, Terminal 2 was inaugurated by President Rodrigo Duterte,[13][14] with the terminal being operational on July 1.
On May 5, 2021, the second taxiway and expanded apron of the airport was inaugurated.[15]
Contemporary history
Following Typhoon Haiyan (Yolanda), one of the biggest typhoons ever recorded and one of the most destructive typhoons in the Philippines, the airport was used as a center for air operations for the relief effort. The airport is centrally located in the Visayas which was the region most affected by the storm, especially the Eastern Visayas islands of Leyte and Samar. The Cebu airport was relatively unaffected by the storm while the airports of the Eastern Visayas were unusable immediately after.[16]
On November 12, 2013, the world's longest and heaviest aircraft, the Antonov An-225 Mriya, landed at MCIA from the Zagreb International Airport in Croatia for the first time in the Philippines to deliver a 180-ton replacement transformer from the Croatian energy company KONČAR to the First Gen Corporation's power plant in Batangas City. Officials of First Gen approached MCIAA General Manager Nigel Paul Villarete to allow the Antonov An-225 to utilize the airport for the transportation of their delivery after officials from Clark International Airport, Ninoy Aquino International Airport in Manila, and Subic Bay International Airport refused to allow the aircraft to utilize their airports.[17] According to First Gen President Francis Giles Puno, MCIA had been inspected by Antonov Airlines, the owner of the Antonov An-225 aircraft, as the most viable option for their aircraft, "after considering the combination of airport, onward land transport and sea freight."[18]
On August 27, 2018, on the occasion of National Heroes Day, President Duterte expressed support for renaming the airport after Mactan chieftain Lapu-Lapu whose forces killed Ferdinand Magellan during the Battle of Mactan in 1521.[19]
On December 16, 2021, the airport was closed indefinitely after sustaining heavy damage from Typhoon Rai (Odette) before resuming operations on December 19 under a new layout that integrates both terminals together since the domestic terminal sustained the most damage, while the international terminal only suffered minor damage.[20]
In September 2022, Aboitiz purchased a 33.33% stake on GMR–Megawide Cebu Airport Corporation. Aboitiz plans to completely take full control of the operations of the airport by 2024.[21]
Future development
On May 22, 2017, Mactan–Cebu International Airport Authority (MCIAA) passed a resolution approving the proposal to start the construction of a second runway, which was proposed by Rep. Raul del Mar of Cebu. Del Mar proposed that the construction of the second runway be funded using P4.9- billion sourced from the P14.4 billion premium given by the GMCAC when it won the bid to develop and manage the MCIA terminal. Once completed, the second runway will be adjacent to the existing first runway and will enable simultaneous runway operations.[22]
The groundbreaking ceremony of the second runway was held on January 14, 2020.[23]
Terminals
Terminal 1
Terminal 1, which was built in 1990, serves as the airport's domestic terminal. Prior to the completion and opening of Terminal 2, it housed both domestic and international operations and has an annual capacity of 4.5 million passengers.[24]
The terminal has a floor area of 38,525 square meters (414,680 sq ft). It has six jet bridges and also has remote parking spaces for aircraft. There are five baggage conveyor belts in the baggage claim area.[24]
From 2018 to 2019, Terminal 1 was renovated. The renovation includes the expansion of the pre-departure area and improved flight information displays. An airport village was constructed as part of the project and is connected to the pre-departure area.[24]
Terminal 2
Terminal 2, which started construction in 2016 and opened for operations on July 1, 2018, is the newest airport terminal and has an annual capacity of eight million passengers, increasing the airport's capacity to 12.5 million passengers per year.[25]
Integrated Design Associates designed the terminal with European timber arches from Austria that look like an inverted boat hull, and a wave-like roof that evokes a tropical and resort-like feel.[26] It represents the sea waves that surrounds the island of Cebu. Terminal 2 won an award for the category "Completed Buildings – Transport" at the World Architecture Festival in 2019.[27][28]
Occupying an area of 65,500 square meters (705,000 sq ft), the terminal has four check-in halls with 48 check-in counters in the departures area, seven jet bridges, 12 escalators, 15 elevators, duty-free shops, and a departure lobby.[24]
Structure
Runways
The airport has a single 3,300-meter (10,800 ft) runway with a width of 45 meters (148 ft) that was built by the United States in 1956 as an emergency airport for U.S. Air Forces' Strategic Air Command bombers and was known as Mactan Air Base.[4] The runway is complemented by a full-length taxiway that it shares with the current Mactan Air Base of the Philippine Air Force.
Second runway
A second runway is being constructed since January 2020.[23] It would be 2,560 meters (8,400 ft) long and 45 meters (148 ft) wide.[1] The runway is estimated to be completed in December and will fully operate in 2023. The runway can serve as an emergency runway in case of major situations concerning the main runway.[29][30]
Other structures
The airport has other government buildings like the two-level CAAP Administration Building and the six-level MCIAA Corporate Building, both located within the airport complex.[15][31] The parking area outside the terminals has a total capacity of 750 cars.[24]
Airlines and destinations
Passenger
- Notes
- ↑ Emirates flights make an intermediate stop in Clark en route to Dubai. However, the airline has no cabotage rights to carry passengers solely between Cebu and Clark.
- ↑ Turkish Airlines flights make an intermediate stop in Manila en route to Istanbul. However, the airline has no cabotage rights to carry passengers solely between Cebu and Manila.
Cargo
Airlines | Destinations |
---|---|
Air Hong Kong | Hong Kong |
Central Airlines | Shenzhen |
SEAir International | Clark |
Statistics
Data from the Mactan–Cebu International Airport Authority (MCIAA).[2][34]
|
Accidents and incidents
- On September 26, 2016, Cebgo Flight 6577, an ATR 72-500 bound for Tacloban, was taking off from runway 22 when the crew observed fluctuations on oil indications for the left-hand engine and decided to reject the takeoff. A fire was discovered on both left hand main wheels while taxiing, leading the crew to stop on the taxiway and begin an evacuation of the aircraft. One passenger received minor injuries during the evacuation.[35]
- On November 1, 2018, Cebgo Flight 6717, an ATR 72-600 bound for Cagayan de Oro experienced engine fire on takeoff. The engine was shut down and a fire drill was performed. The aircraft safely landed back at the airport. No injuries were reported.[36]
- On December 10, 2021, Philippine Airlines Flight 2369, a De Havilland Canada Dash 8-Q400 originating from Caticlan, skidded off the runway shortly after landing in rainy weather. No injuries were reported.[37]
- On October 23, 2022, Korean Air Flight 631, an Airbus A330-300 with registration HL7525 originating from Seoul, overshot the runway after two landing attempts, shortly after landing in stormy weather. No injuries were reported, but the airplane was damaged beyond repair.[38]
- On December 7, 2022, Philippine Airlines Flight 1862, an Airbus A321-200 bound for Manila, caught fire on the tailpipe of one of the engines during engine start and was caused to an excess of fuel in the combustion chamber, the turbine, or the exhaust nozzle that ignites. No injuries were reported among the 64 passengers.[39]
- On October 4, 2023, a Philippine Air Force Cessna 208B Grand Caravan, performing a confidential mission, made an emergency landing shortly after takeoff due to an engine fire. The plane landed safely on runway 22 but the landing gear collapsed, resulting the aircraft to become disabled. Among the five occupants, none were injured.[40]
References
- 1 2 "Cebu airport's second runway halfway done". PortCalls Asia. October 28, 2021.
- 1 2 "GRAPHS – Mactan – Cebu International Airport Authority". Retrieved August 18, 2022.
- ↑ Hoontrakul, P. (2014). The Global Rise of Asian Transformation: Trends and Developments in Economic Growth Dynamics. New York: Palgrave Macmillan.
- 1 2 3 "Mactan–Benito Ebuen Air Base". Globalsecurity.org. Retrieved July 22, 2013.
- ↑ "G.R. No. 162288". April 4, 2007. Retrieved December 7, 2022.
- 1 2 3 Roa, Ana (May 12, 2018). "Mactan's maiden flight". Philippine Daily Inquirer. Retrieved December 7, 2022.
- ↑ "AN ACT CREATING THE MACTAN-CEBU INTERNATIONAL AIRPORT AUTHORITY, TRANSFERRING EXISTING ASSETS OF THE MACTAN INTERNATIONAL AIRPORT AND THE LAHUG AIRPORT TO THE AUTHORITY, VESTING THE AUTHORITY WITH POWER TO ADMINISTER AND OPERATE THE MACTAN INTERNATIONAL AIRPORT AND THE LAHUG AIRPORT, AND FOR OTHER PURPOSES". Republic Act No. 6958 of 1990. Retrieved December 7, 2022.
- ↑ Agcaoili, Lawrence (April 23, 2014). "Megawide-GMR remits P16.1-B payment for Cebu airport project". The Philippine Star.
- ↑ "Megawide-GMR airport design reflects Cebu culture | Manila Bulletin | Latest Breaking News | News Philippines". Manila Bulletin. Archived from the original on May 17, 2014. Retrieved May 17, 2014.
- ↑ "Philippine-India consortium to overhaul Cebu airport by 2018- Nikkei Asian Review". Archived from the original on May 20, 2014. Retrieved May 17, 2014.
- ↑ "Aquino breaks ground on P32B Cebu airport terminal project". CNN Philippines. Retrieved June 29, 2015.
- ↑ "Construction of the Mactan-Cebu airport begins | GOVPH".
- ↑ Lopez, Virgil (June 7, 2018). "Duterte inaugurates new 'resort-like' Mactan Cebu airport terminal". GMA News. Retrieved June 7, 2018.
- ↑ Bunachita, Jose Santino. "Duterte leads inauguration of new Mactan airport passenger terminal". Philippine Daily Inquirer. Retrieved June 7, 2018.
- 1 2 "Tugade inaugurates new taxiway, CAAP Bldg at Mactan-Cebu Int'l Airport". Philippine Information Agency. DOTr. May 6, 2021. Retrieved May 11, 2021.
- ↑ Rodriguez, Jon Carlos (November 12, 2013). "Cebu airport to be used as hub for relief efforts". ABS-CBN News. Retrieved November 22, 2022.
- ↑ Alegado, Sieg (November 12, 2013). "World's biggest plane to deliver 140-ton power generator to PHL". GMA News. GMA Network Inc. Retrieved December 21, 2015.
- ↑ Sollane, Jose (November 13, 2013). "World's biggest airplane in Cebu". The Philippine Star. Retrieved December 21, 2015.
- ↑ Adel, Rosette (August 27, 2018). "Duterte favors renaming Mactan airport in Cebu after Lapu-Lapu". The Philippine Star. Retrieved August 28, 2018.
- ↑ "Mactan-Cebu Int'l Airport shut 'until further notice' amid damage from 'Odette'". December 17, 2021.
- ↑ Piad, Tyrone Jasper C. (September 3, 2022). "Aboitiz buys into Mactan airport". Philippine Daily Inquirer. Retrieved September 27, 2022.
- ↑ Fernandez, Rona Joyce T. (May 21, 2017). "2nd runway project a 'go'". SunStar.
- 1 2 "Mactan-Cebu International Airport breaks ground for second runway". ABS-CBN News. January 14, 2020. Retrieved September 27, 2022.
- 1 2 3 4 5 "Mactan-Cebu International Airport". Airport Technology. May 11, 2020. Retrieved September 7, 2022.
- ↑ "Megawide to open Mactan-Cebu airport Terminal 2 in June". BusinessMirror. Retrieved July 4, 2018.
- ↑ "First roof structure in Asia to be completely made from glued laminated timber". Retrieved January 11, 2023.
- ↑ "Completed Buildings Transport winner". World Architecture Festival. Retrieved December 7, 2019.
- ↑ "Mactan Cebu International Airport wins World Architecture award". ABS-CBN News. ABS-CBN. December 5, 2019. Retrieved December 7, 2019.
- ↑ Lorenciana, Carlo (July 29, 2020). "Mactan-Cebu airport eyes 2nd runway as air travel recovery looms". Philippine News Agency.
- ↑ "Mactan airport's parallel runway maybe operational in 2023". INQUIRER.net. November 28, 2022. Retrieved November 30, 2022.
- ↑ Abadilla, Emmie V. (October 27, 2021). "Mactan-Cebu International Airport's new corporate building inaugurated". Manila Bulletin. Retrieved October 30, 2021.
- ↑ "Cebu Pacific Tentatively Plans Cebu – Shanghai Resumption in NS24". AeroRoutes. Retrieved November 7, 2023.
- ↑ "AirAsia 1H24 Removed International Routes Summary – 20DEC23". AeroRoutes. December 21, 2023.
- ↑ "STATISTICS – Mactan – Cebu International Airport Authority". Retrieved August 18, 2022.
- ↑ "Cebu AT72 at Cebu on Sep 26th 2016, rejected takeoff due to engine oil fluctuation, wheel fire on taxi and evacuation". www.aeroinside.com. Retrieved March 14, 2022.
- ↑ "Cebu Pacific AT72 at Mactan on Nov 1st 2018, engine fire". www.aeroinside.com. Retrieved March 14, 2022.
- ↑ Antojado, Le Phyllis F. "Plane incident in Cebu airport delays flights". Philstar.com. Retrieved March 14, 2022.
- ↑ Perez, Annie (October 24, 2022). "Plane overshoots runway at Mactan Cebu International Airport". ABS-CBN News. Retrieved October 24, 2022.
- ↑ "PAL exec confirms Dec. 7 aircraft tailpipe fire at MCIA; no passengers hurt". INQUIRER.net. December 9, 2022. Retrieved March 19, 2023.
- ↑ Salcedo, Dirk Andrei. "PAF Cessna 208B Grand Caravan makes emergency landing in Cebu". Aviation Updates Philippines | Latest Philippine aviation news. Retrieved October 20, 2023.
External links
- Mactan–Cebu International Airport
- Mactan–Cebu International Airport Authority
- Mactan Cebu International Airport – flight status and updates for travellers to and from Cebu
- Current weather for RPVM at NOAA/NWS
- Airport information for CEB / RPVM at Great Circle Mapper. Source: DAFIF (effective October 2006).
- Accident history for CEB / RPVM at Aviation Safety Network