The Ring of Fire is a vast, mineral-rich region located in the remote James Bay Lowlands of Northern Ontario, Canada. Spanning approximately 5,000 square kilometres (1,900 sq mi), the area is rich in chromite, nickel, copper, platinum group elements, gold, zinc, and other valuable minerals. Discovered in the early 21st century, the Ring of Fire is considered one of the most significant mineral deposits in Canada, with the potential to greatly impact the nation's economy and global mining industry. The development of this region has been a subject of ongoing debate, as stakeholders weigh the economic benefits against environmental concerns and the rights of Indigenous communities in the area. Despite these challenges, the Ring of Fire had remained a focal point for the Canadian mining sector and government, as well as international investors. By July 2023, the federal and provincial governments were no longer in agreement on priorities for federal funding of the Ring of Fire. Georgia Lake lithium project, KGHM's Victoria mine proposal and the Onaping Depth nickel projectwhich will produce minerals required for the low carbon economyhad become higher priorities, particularly as the Ring of Fire project is situated in a region of "vast, environmentally sensitive...peatlands".[1]

Geography

The region is centred on McFaulds Lake, near the Attawapiskat River in Kenora District, approximately 400 kilometres (250 mi) northeast of Thunder Bay, about 70 kilometres (43 mi) east of Webequie, and due north of Marten Falls and Ogoki Post, which is near/on the (Albany River) west of James Bay.

The Ring of Fire development impacts nine First Nations, and potential developers are required to negotiate an Impact Benefit Agreement with these communities prior to development.[2]

History of development

2003

In 2003, Noront Resources began using two frozen lakes—Koper Lake, located about 128 kilometres (80 mi) north of Marten Falls, and McFaulds Lake—as landing strips without consulting Martens Falls and Webequie First Nations.[3] The Mining Act[notes 1] only allows exploration activities, not the construction of permanent structures. Marten Falls First Nations Chief Eli Moonias explained in 2010 that Noront Resources did not have "permits to construct landing strips on the string bog or roads to the nearby airstrip". "The two First Nations proposed that they should build and maintain the infrastructure to prevent further damage to the wetlands environment."[3] Marten Falls First Nations Chief Eli Moonias described how over a seven-year period, Noront Resources "sunk machines here and they have done outrageous acts here". In the fall of 2009, the companies "used a helicopter to break ice here with a log". On February 3, 2010, Noront Resources Ltd. was trying to build a "[landing] strip here on the string bog".[3] In January 2010, Chief Eli Moonias,[notes 2] Webequie Chief Cornelius Wabasse, and community members set up a blockade on the landing strips at Koper and McFaulds Lakes.[3][4] Martens Falls and Webequie First Nations ended their blockade on March 19, 2010, with the admonition that they would resume the action if their concerns were not addressed by Noront within six months.[5] Although the protest ended, Noront continued to use the frozen lakes as landing strips until break-up in 2010. Chief Eli Moonias expressed environmental concerns over "sewage, grey-water, oil spills and road clearing" over the seven-year period.[3]

2007

The Ring of Fire was named when the first significant mineral finds were made in the region, by Richard Nemis,[notes 3] after Johnny Cash's famous country and western ballad.[6] Prior to its discovery, Canada and the United States were compelled to rely on offshore sources for chromite, principally from South Africa.[7]

On 28 August 2007, Noront Resources announced the discovery of a "large find"[8] of "high grade deposit" of platinum, palladium, nickel, and copper[9][10] 500 kilometres (310 mi) northeast of Thunder Bay, Ontario. Its underground mine project is called the Eagle's Nest Project.[9][notes 4] To reduce heavy truck traffic, Noront is planning to build a buried 90 kilometres (56 mi)-long slurry pipeline, using new technology safety features, from the site to Webequie Junction.[9]

2009

Cliffs Natural Resources, of Cleveland, Ohio, originally had an "ambitious timetable for developing the Black Thor chromite deposit", hoping to complete permits and environmental assessment approvals by the end of 2013 (MRI). In September 2003, a junior company, Freewest Resources Canada, began exploring Black Thor using airborne geophysics and ground geophysics.[11] In February 2008 findings[12] of a chromite prospect with an estimated 2 kilometres (1.2 mi) strike length, a depth of 200 metres (660 ft), and a 40 metres (130 ft) width containing an estimated 72 megatonnes of chromite ore (42% Cr2O3).[13] in September 2009. In October 2009, Noront Resources (NOT-V) made a hostile takeover bid for Freewest Resources (FWR-V). In November 2009, Cliffs Natural Resources (CLF-N), the world's largest iron ore pellet supplier, purchased Freewest Resources' share of the chromite-rich "high-grade Black Thor, Black Label and Big Daddy deposits in the remote "Ring of Fire" metals"[12] for $240 million.[6] In November 2009, Joseph Carrabba, Cliffs' president and CEO, claimed the "world-class deposits" had the "potential to support an open pit mine producing 1 to 2 million tonnes per year for more than thirty years". Carrabba announced that the ore would be "further processed into 400,000–800,000 tonnes of ferrochrome".[12] The purchase was finalized in 2010.[11][notes 5]

According to Carrabba the area of the Ring of Fire that Cliffs acquired in 2009 represents one of the "premier chromite deposits in the world. Chromite is smelted to produce ferrochrome which is used globally in the production of stainless steel and is categorized as a strategic metal resource by many countries.[12]

2011

In 2011, environmental assessments by the Canadian federal and Ontario provincial governments began for Cliffs Natural Resources' proposed Black Thor Project and Noront Resources's Eagles Nest Project, with both companies volunteering "to make their projects subject to an environmental assessment under the Ontario Environmental Assessment Act (EAA) and are completing environmental assessments under the Canadian Environmental Assessment Act (CEAA)".[14] In 2011, Ontario's Ministry of Northern Development and Mines created the Ring of Fire Secretariat, with Christine Kaszyckias as its coordinator, to develop "the chromite and other deposits in the Ring of Fire as quickly as possible and with due regard to environmental impacts and the needs of the Aboriginal communities within the region".[6] It outlined strategies regarding First Nations partnerships, including resource revenue sharing,[notes 6] regional infrastructure planning, long-term environmental monitoring, community-based capacity funding, relationship agreements, land use planning, employment and income assistance, skills development, training and job creation, transportation and community infrastructure, and socio-economic and community development in response to concerns by industry and First Nations communities.[15]

2012

In May 2012, Cliffs Natural Resources announced a "$3.3-billion investment to build a chromite mine, transportation corridor and processing facility in northern Ontario's Ring of Fire that would lead to a new generation of prosperity in the north, with thousands of jobs and new infrastructure". Natural Resources minister Michael Gravelle announced that the smelter would be in Sudbury, Ontario.[16]

On 26 April 2013, Tony Clement called the Ring of Fire the oil sands of Ontario.[17] On 13 June 2013, Cliffs announced it would put its $3.3-billion project on hold pending results of negotiations between First Nations and Queen's Park.[18] Clement said that the Ring of Fire would bring "about a hundred years of mining activity that will spin-off jobs and economic activity for generations".[19]

The Ontario government has called the Ring of Fire region “one of the most promising mineral development opportunities for critical minerals in the province”, citing the region’s long-term potential to produce, chromite, cobalt, nickel, copper, and platinum.[20]

In May 2012, Cliffs Natural Resources announced its intention of investing $3.3 billion in Northern Ontario's Ring of Fire region, which would include a chromite mine, a transportation corridor and a smelter in Sudbury, Ontario.[16] Cliffs initially invested $550 million to acquire and begin development.[21] By 2013, Cliffs had suspended the project "after numerous delays and difficult discussions with the province [of Ontario] and the First Nations communities".[21] Cliffs sold its assets to the smaller Canadian company, Noront Resources Ltd. for USD20 million.[21]

The Ontario government and Premier Doug Ford have stated their enthusiasm and intent in connecting the Ring of Fire and Northern Ontario’s industries, resources and workers to the south of the province in order to “build up home-grown supply chains”.[22] In its collaboration with First Nation partners, the Ontario government has said it is “continuing to make progress in a corridor to prosperity (roadway) to the 'Ring of Fire' region."[22] Toronto-based consultant, Stan Sudol, added that the government should “accelerate road development into the Ring of Fire”, as it currently undergoes an Indigenous-led environmental assessments by Marten Falls and Webequie First Nations who support the mining project.[22]

On 12 November 2012, Tony Clement was appointed as the lead federal minister on the Ring of Fire and co-chair, with Minister of Aboriginal Affairs and Northern Development Bernard Valcourt, of the Federal Steering Committee (FCS), which represents 15 federal departments. Clement invited Ontario Natural Resources minister Michael Gravelle[16] "to collaborate on projects, community visits, information-sharing, and to hold joint meetings".[23] Aboriginal Affairs and Northern Development Canada (AANDC) led other federal departments and FedNor in the development of Action Plan for Supporting Community Participation in the Ring of Fire[24] to help "position First Nations to benefit from proposed mining projects".

On May 8, 2012, Premier Dalton McGuinty wrote Prime Minister Stephen Harper, on the eve of Cliffs Natural Resources' announcement of the location of its ferrochrome processing facility, asking for federal government assistance "to engage First Nations in the region to help those communities benefit from this historic opportunity". Along with federal funds to improve First Nations education on reserves and for drug treatment programs, McGuinty asked for "a tripartite process".[25]

Canada needs to deal with the acknowledged and widespread problems of inadequate First Nation's social and community infrastructure. To this end, there needs to be an immediate investment in the First Nations communities located in the Ring of Fire area so that a healthy and skilled First Nations workforce will be ready to participate fully in the many opportunities presented by this development.

McGuinty 25 May 2012

By 2012, there were 30,000 claims, 35 prospecting companies, and significant discoveries of chromium, copper, zinc, nickel, platinum, vanadium and gold; there were only two major development proposals, Noront Resources's Eagle's Nest Project and Cliffs Natural Resources.[6] KWG Resources entered into a joint venture agreement with Bold Ventures (TSX:BOL) on its $5 million Koper Lake Project.[26] In February 2013, Richard Nemis, CEO of Bold Ventures, obtained a Marten Falls First Nation Land Use Permit to operate the camp using "three diamond drills provided by Cyr International Drilling and Orbit Garant Drilling" to carry out approximately 6,000 metres (20,000 ft) of diamond drilling on nickel‐copper and chromite targets.[27] Operator Bold Ventures was required to cease drilling activities from March 31, 2012, until April 13, 2013, to ensure the First Nations' permit was granted under the Mining Act, and a permit issued by a Director of Exploration from the Ministry of Northern Development and Mines was obtained.[28] Probe Mines owned the entire Victory Project, which consists of "452 claims totaling 7,232 hectares and covers the interpreted southeast extension of the McFauld's Lake" and the Tamarack Project which "comprises 360 claims covering over 5,700 hectares of the McFauld's Lake in the Ring of Fire".[19][29]

Environmental concerns listed in a Lakehead University 2012 report regarding Noront Resources's Eagle's Nest Project include pipeline leaks, a "a large edge effect", a "significant loss of biodiversity at local & regional level" from "linear constructions" such as roads. Despite state-of-the-art technology, environmental risks of underground pipelines in the wetlands, excluding the risk of leaks, include alterations of "hydrology, thermal regime, soil structure and vegetation of ecosystem".[9]

The Eagle’s Nest Mine is expected to produce “3,000 tonnes of ore per day, which will be mined by underground methods and processed to deliver 150,000 to 250,000 tonnes of nickel-bearing concentrate per year."[30] According to Noront Resources, citing its extensive discussions with local communities and other stakeholders, the company says its design will be the first mine to have all its tailings remain underground and “100% of process plant water will be recycled to minimize the discharge of effluents.”[30] Further, it is reported to reach commercial production 3 years after permits are received and its mine life is expended to be 11 years, with the possibility of an additional 9.[30]

2013

According to Northern Ontario Business article, Cliffs Natural Resources, the Ohio-based firm that held the majority share in Big Daddy chromite deposit, was seeking an easement through Ontario's Mining and Landings Commissioner on the KWG corridor to build their access road.[31] The minority share partner in Big Daddy, KWG Resources, a Toronto-based junior miner, held a 30 percent stake and were also interested in the development of transportation corridor.[32]

In February 2013, KWG had released the report it commissioned by the engineering firm Tetra Tech regarding the viability of building a railroad, instead of a road, to access chromite in the Ring of Fire.[31] Big Daddy chromite deposit to CN Rail (CN) near Nakina, Ontario.[26] According to KWG, KWG's 100 percent owned subsidiary, Canada Chrome Corporation, had "conducted a $15 million surveying and soil testing program for the engineering and construction of a railroad to the Ring of Fire from Exton, Ontario."[28] The February 2013 Tetra Tech engineering firm report said that concluded that a railroad would provide better access to ore in the Ring of Fire, than a road.[31]

By April 2013, Canada Chrome Corporation, had "staked a 330 km (210 mi)-kilometre-long "string of mining claims" which would eventually provide a transportation corridor from the Big Daddy chromite deposit to CN Rail (CN) near Nakina, Ontario.[31] In an April 2013 interview, Moe Lavigne, VP of KWG Resources, a former Ontario Geological Survey geologist, said that the federal government would consider Tetra Tech's findings. Lavigne, said that they had staked mining claims to eventually build the railroad and make their stranded assets "viable." Lavigne said that "Ontario's Mining Act would safeguard his company's corridor claims."[31]

In November 2013, The Globe and Mail, reported on the controversy over whether the province of Ontario, could afford a CAD$2.25 billion road the Trans-Canada Highway near Kenora to the Ring of Fire.[33]

February 2013 briefing notes for Clement warned that the Matawa First Nation communities were among the "most socio-economically challenged in Ontario, impacting their ability to meaningfully participate in large complex projects".[24] Most of the "working age population in the Matawa First Nation communities have not completed high school".[24][notes 7][34] Three of the nine local Matawa First Nations were "under financial intervention (co-management)".[24] Matawa First Nations lack "exposure to a development of this magnitude combined with low educational attainment and other factors suggests that the communities do not currently have the capacity to address the various issues related to the Ring of Fire".[24]

The Action Plan noted that First Nations were interested in potential legacy impacts of Ring of Fire infrastructure, such as all-weather roads, links to the power grid and high-speed broadband Internet. Industry Canada's Broadband Canada was already laying 2,300 kilometers of fibre optic cable to 26 First Nations across the Far North, including the Ring of Fire.[35]

By 2013–2014 royalties collected from De Beers Victor Diamond Mine amounted to $226. At that time De Beers was continuing to pay off its "$1 billion investment to build the mine and from now until it closes, the company expects to pay tens of millions of dollars in royalties".[36] By 2019, this number reached $110 million dollars in royalties to the Ontario government and a further $100 million in payments to social development and local communities in the region. [37]

Under the Liberal government of Kathleen Wynne, former Ontario premier Bob Rae was appointed as chief negotiator to represent the nine different native governments—Marten Falls First Nation, Webequie First Nation, Neskantaga First Nation, Nibinamik First Nation, Aroland First Nation, Long Lake 58 First Nation, Ginoogaming First Nation, Eabametoong First Nation, Mishkeegogamang First Nation, and Constance Lake First Nation for the Matawa First Nations—in talks with the Ontario government about the opening of First Nations lands to the Ring of Fire development.[38] Noront's Eagle's Nest copper and nickel mine and the Black Thor chromite mine of Cliffs Natural Resources would generate wealth and royalties for Ontario, but the mines are in a remote region. They will "require significant development to make them viable". "[D]evelopment that will have a profound effect on the local native communities, five of which are not yet accessible by road."[38] By 2014, a "regional-framework agreement between the Matawa Tribal Council was the provincial government was reached. Retired Supreme Court justice Frank Iacobucci negotiated on behalf of the province and former premier Bob Rae on behalf of the Matawa, "set the terms for how future projects related to the proposed Ring of Fire would be finalized. It was intended to serve as a model for Crown-Indigenous relations on major resource-extraction projects."[39]

In late August 2019 in Rickford announced that the province of Ontario was dissolving the regional-framework agreement and that this would come into effect in 90 days. Rickford said that, "Frankly, to this point, it’s been a little complicated and lengthy, It has not necessarily met the timelines that the market should expect a project to come on board."[39]

2016

In the spring of 2016, engineers from China Railway Group Limited (FSDI), a Xi'an-based firm owned by the Government of China through the China Railway Engineering Corporation, and KWG's Moe Lavigne visited the Ring of Fire in Northern Ontario to explore a potential north–south route for a chromite ore-haul railroad from the Ring of Fire.[40] KWG's Chinese partners feasibility study had concluded that the route that traverses the traditional territory of the Marten Falls First Nation (MFFN) to reach Nakina in northwestern Ontario, was a "viable alignment".[40][41][42] China consumes approximately 60% of the world's ferrochrome production.[43]

2017

In April 2017, KWG also requested a guarantee of a billion dollars from Ontario's Ring of Fire Infrastructure Development Corporation (ROFIDC) to use as "consideration for project financing terms from Chinese lenders."[41]

In 2017, then-Ontario Premier, Kathleen Wynne, pledged support for the construction of a year-round access road from Nibinamik and Webequie First Nations, to Ontario Highway 599 at Pickle Lake, which would "also facilitate access to the Ring of Fire, located about 575 km (357 mi) north of Thunder Bay.[44]

In May 2017, representatives from KWG and the Marten Falls First Nation (MFFN), made an official visit to FSDI headquarters in Xi'an, China.[40] The FSDI feasibility study estimated that the capital cost of building the Far North railroad would be about $2 billion, says a June 2017 Northern Ontario Business article.[40] The same article said that the proposed railroad would transport 10 million tonnes of chromite annually by 2030, potentially growing to a yearly volume of up to 24 million tonnes by 2040.[40] To complete the project, KWG was seeking financing from both China and the Government of Ontario, including supply agreements with the Chinese stainless steel industry.[41]

According to an April 2017 Northern Ontario Business article, KWG said it was "working towards" creating an "equal partnership" to develop the chromite deposit with one of the First Nation's communities, Marten Falls First Nation, whose traditional territory includes the Ring of Fire nickel and chromite deposits[41] and would also be traversed by the proposed north-south railway.[40] The five Ring of Fire mining companies began planning on extending partnership offers to other nearby communities such as Aroland First Nation and Webequie First Nation, the Northern Ontario Business said.[41] Aroland First Nation signed a memorandum of understanding (MOU) with Norand on June 6, 2019, regarding the development of Norand's Eagle's Nest nickel and base metal deposit.[45]

2018

KWG CEO Smeenk proposed the creation of the James Bay & Lowlands Transportation Authority, which would be "similar to an airport or port authority".[46] He said that the federal government should participate in the Ring of Fire development by creating James Bay & Lowlands Transportation Authority—"similar to a port or airport"—[46] for the purpose of transporting ore from the Ring of Fire to Sault Ste. Marie where there is already a port and a rail line.[47] The railway runs from Sault Ste. Marie to Hearst which is "half way to the Ring of Fire".[47] Smeenk told Postmedia that in the current "political realities" and "regulatory environments", in order to extract minerals from the Ring of Fire and to avoid "political whims" from preventing the extraction of the minerals in the future, it was necessary to do "business with the United States."[47]

KWG hosted a fundraising event on April 5, 2018, at Toronto's original stock exchange on Bay Street[46][48] in support of the establishment of the Transportation Authority to facilitate the transport of chromite ore "from the Ring of Fire to a proposed KWG processing plant in Sault Ste. Marie."[46] Invited guests included Premier Doug Ford, Maxime Bernier, and Chief Jason Gauthier, of the Missinabie Cree First Nation.[46] KWG CEO Smeenk said that the transportation corridor would "ensure the viability" of the Algoma Central Railway, which is one of the goals of the Missanabie First Nation.[46] The invitation for the April 5 event announced a discussion on the merits of "making ferrochrome in Sault Ste. Marie, Michigan for a new North American stainless steel joint-venture with Sault Ste. Marie, Ontario."[48] Sault Ste. Marie's Mayor Christian Provenzano said in a March 22 news report, expressed concern that he was not aware of this joint venture, nor were their "partners in Sault Ste. Marie, Michigan."[48] The news report said that "KWG is believed to be interested in partnering with the United States to take advantage of President Donald Trump's 'America First' approach to international trade."[48]

2019

By 2019, the mining company with the most holdings in the Ring of Fire was the Canadian company—Noront Resources Ltd.—with palladium, nickel, platinum, and copper deposit in Eagle's Nest, and chromite deposits including Big Daddy, Black Thor, and Blackbird.[49]

In late August 27, 2019, in Sault Ste. Marie, Ontario's Minister of Energy, Northern Development and Mines (MENDM), Greg Rickford, said that the regional framework agreement negotiated in 2014 under between the province and the nine Matawa First Nations, had cost over $20 million and that funding had run out for the agreement in late 2018.[50][39] Rickford said he was taking a more "pragmatic" approach with the goal of removing delays to projects, with the north-south corridor that at the top of the list.[50] Rickford wants to work on a series of bilateral agreements with individual communities that would "not only could lead to road access to the mineral-rich James Bay lowlands, but can also connect by road, as well as add to the provincial power grid and expand modern telecommunications to, 'at least four, five Indigenous communities.'"[50] In a CBC interview he said that, the transportation corridor would have "additional health and social and economic benefits that move beyond the more obvious opportunities of creating mines ... To the extent that Noront [Resources] or other mining companies could build mines on that corridor, then we have a great value proposition.".[50][39] The mining company, Noront Resources, which holds the largest Ring of Fire claims, and Marten Falls First Nation issued a joint statement welcoming Rickford's announcement.[50] Marten Falls is the proponent of an environmental assessment for the first stage of an access road connecting the community to an all-season road. On the same day, Noront announced that they had issued "300,000 shares to Marten Falls First Nation and 150,000 shares to Aroland First Nation" as part of their Project Advancement Agreement.[49]

2020

By the fall of 2020, the Ring of Fire was considered "one of the largest potential mineral reserves in Ontario" with "more than 35 junior and intermediate mining and exploration companies covering an area of about "1.5 million hectares".[51] Although the Ring of Fire crescent covers 5,000 square kilometres (approximately 1,930 square miles), most discoveries made by 2012 were within a twenty-kilometre-long strip.[6] Ontario's Minister of Northern Development, Mines and Forestry Michael Gravelle called the region "home to one of the most promising mineral development opportunities in Ontario in more than a century".[2] Tony Clement, Canada's Treasury Board President and the FedNor minister responsible for the Ring of Fire, claimed it will be the economic equivalent of the Athabasca oil sands, with a potential of generating $120 billion.[17] Clement says the Ring of Fire represents a "once-in-a-life opportunity to create jobs and generate growth and long-term prosperity for northern Ontario and the nation".[2] Challenges facing the development of the Ring of Fire mineral include lack of access to the remote region, infrastructure deficits such as roads, railway, electricity and broadband, First Nations land rights, and environmental issues[19] in the James Bay Lowlands, the "third largest wetland in the world".[52] Clement was looking to business, not the federal government, to invest "in power and transportation infrastructure to develop the deposit".[19]

In March 2020, at the Prospectors and Developers Association of Canada convention, Ontario Premier Doug Ford and Minister of Indigenous affairs, Greg Rickford, met Marten Falls Chief Bruce Achneepineskum and Webequie First Nation Chief Cornelius Wabasse for a signing ceremony.[53] This ceremony solidified the partnership between the two First Nations and the Ontario government, who now have the support of these First Nations to develop an all-season road infrastructure and move forward with the Ring of Fire developments.[53]

2021

In late 2021, it was reported that access to the Ring of Fire required 450 kilometers of new roads, which would connect many remote First Nation regions that are currently, air-access-only and do not have readily available access to clean drinking water, to Ontario’s provincial highway system.[54] The provincial government has volunteered $1.6 billion of government funding for the proposed roads.[54]

In January 2021, the Australian company Wyloo Metals, announced its intent to acquire a controlling interest in Noront Resources.[55] Wyloo’s offer of $0.70 a share (CAD), trumped the competing offer of $0.55 (CAD) a share made by BHP group.[55] In March 2022, Noront Resources shareholders, with a 98.9 per cent majority, approved the sale of the Toronto junior miner's mineral assets in the North to Wyloo Metals, for $616.9 million.[56]

The head of the company, Luca Giacovazzi, noted that de-carbonizing the economy is a priority for Wyloo, stating that the company “started spending a lot of time looking at things like electric vehicles and batteries, and that sort of led us down the path of nickel.” [57] The metals company will commit $25 million in a feasibility study to look into building battery material in Ontario, as well as targeting $100 million in contracts with Indigenous communities to create jobs in communities and promising training for Indigenous workers.[55]

2022

Marten Falls First Nation and Webequie First Nation are leading provincial and federal Environmental and Impact Assessments for their proposed Marten Falls Community Access Road and Webequie Supply Road projects.[58] These projects have been respectively approved by the Provincial Environmental Assessment (EA) Terms of Reference in October 2021.[59]

2023

Federal Natural Resources Minister Jonathan Wilkinson said that the Georgia Lake lithium project, KGHM's Victoria mine proposal and the Onaping Depth nickel project were a higher priority than the Ring of Fire for federal investment. The Ring of Fire is situated in a region of "vast, environmentally sensitive...peatlands". The federal government's goal of developing minerals that are crucial for the shift to a low carbon economy conflicts with the province's plans for a "Ring of Fire" as a "mining bonanza". Wilkinson said that they have identified mining projects in Ontario that are nearer to infrastructure that already exists.[1]

First Nations and the Ring of Fire

The three First Nations most profoundly impacted by the two projects are Marten Falls First Nation, Webequie First Nation and Neskantaga First Nation.[notes 8] Others on the edge of the Ring of Fire include Constance Lake First Nation (Chief Roger Wesley),[51] Nibinamik First Nation, Aroland First Nation, Long Lake 58 First Nation, Ginoogaming First Nation, Eabametoong First Nation, Mishkeegogamang First Nation, and Constance Lake First Nation.[notes 9]

In May 2011, Matawa Chiefs and their communities called for a Joint Environmental Assessment (EA) Review Panel.[60][notes 10]

On October 13, 2011, the Canadian Environmental Assessment Agency (CEAA) proceeded with a Comprehensive Study Environmental Assessment that favours the mining industry without First Nations participation.[61]

On October 20, 2011, Matawa First Nations removed its support for the Ring of Fire development unless the federal government agreed to a joint review panel Environmental Assessment process that would allow First Nations communities in the area to have a voice in the assessment.[51] In May 2019 Noront Resources announced that their ferrochrome smelter to process chromite extracted from the Ring of Fire in northwestern Ontario, would be located in Sault Ste. Marie as a home for its. However, $60-billion Ring of Fire, a project, has been stalled as the newly-elected Ford administration has ended all negotiations with the nine Matawa First Nations in whose territory the Ring of Fire is located.[62] The goodwill that stemmed from the 2014 regional framework agreement between the province of Ontario and the Matawa tribal council had quickly "evaporated" by 2018, according to Elizabeth Atlookan, Eabametoong First Nation Chief as the newly elected Conservative government worked "to "divide and conquer" by moving forward with projects, like road construction, in a piecemeal fashion, absent consultation with all Matawa nations."[62]

On June 12, 2012, Webequie First Nation Chief Cornelius Wabasse and Minister of Northern Development and Mines Rick Bartolucci signed an agreement that "commits Ontario to providing social, community and economic development supports for Webequie to help facilitate the community's involvement in the Ring of Fire". They "will work together on regional environmental monitoring and regional infrastructure planning".[63][64]

On February 4, 2013, Tony Clement acknowledged that the nine first First Nations on and off-reserve in the Ring of Fire area are some of the "most socioeconomically disadvantaged communities in all of Canada".[2][65]

Chronic housing shortages, low education outcomes and lack of access to clean drinking water jeopardize the ability of local First Nations to benefit from the significant economic, employment and business development opportunities associated with the Ring of Fire developments.

Tony Clement Briefings notes 4 February 2013

In an interview with CBC on 27 June 2013, Les Louttit, the deputy grand chief of the Nishnawbe Aski Nation, the group that represents the nine First Nations, argued that serious problems have been neglected for decades. Two to three years is not enough time for skills training to train locals for construction jobs, for example. Louttit noted the gap in First Nations high school and post-secondary education that has existed for many years.[2] Anja Jeffrey, director of the Centre for the North at the Conference Board of Canada, stressed traditional hunting as one of the key issues.[2]

See also

Notes

  1. In 2009 the Government of Ontario introduced an Act to Amend the Mining Act to update the 1873 Ontario Mining Act, under the jurisdiction of the Ministry of Northern Development, Mines and Forestry (MNDM&F). Mining interests are allowed access to most of the land in Ontario, including private property and "mining projects are exempt from full environmental assessments and are under no obligation to clean up a mining site after the mine has closed". The 2009 amendments "failed to address the exemption permitted for mining from the environmental assessment process or protect Ontarians from being on the hook to pay for cleanup costs".Ontario Nature
  2. The Marten Falls First Nations community consists of about 280 on-reserve band members Wataway Archived 2013-11-05 at the Wayback Machine.
  3. The team credited with the 2007 discovery of Noront's Eagle's Nest nickel-PGE deposit in the Ring of Fire include Richard Nemis, a Sudbury-born lawyer became a mining promoter, founder and past-President of Noront Resources Ltd. with John Harvey, Don Hoy, Neil Novak and Mac Watson. Nemis stepped down as President from Noront in 2008. He started two new companies, Rencore Resources Ltd. and Bold Ventures Inc Sudbury Mining Solutions
  4. According to Gregory Reynolds' 28 July 2008 post on the Republic of Mining, Noront Resources Ltd had drilled two holes in the ground, with one having copper sulfide mineralization and the other hole with similar results. A few months later, Noront announced that it had found nickel, copper, platinum, and palladium a few meters below the surface.
  5. According to the Northern Miner article Cliff's 2009 acquisition included "Freewest's 100%-owned Black Thor and Black Label deposits, and 50% of its Big Daddy deposit, which Freewest has joint-ventured with Spider Resources (SPQ-V) and KWG Resources (KWG-V). Cliffs already owns 19.9% of KWG Resources, which holds a 25% stake in the Big Daddy deposit."
  6. Mining royalties flow to the Province of Ontario not to the First Nations on whose land the mines are located. Victor Mine/Attawapiskat
  7. "According to the Assembly of First Nations, data shows the First Nations high school graduation rate is 36 per cent, compared to 72 per cent in Canada overall. A First Nations youth is more likely to end up in jail than graduate high school."Postmedia 1 April 2013 Archived 23 April 2014 at the Wayback Machine
  8. The Neskantaga First Nation is located at the headwaters of the Attawapiskat River, where Cliff's proposed open pit mine would be located.CBC 14 May 2012
  9. They are represented by the Nishnawbe Aski Nation (NAN). NAN is a political territorial organization that represents the 50 First Nations that are part of the Treaty No. 9 area in Northern Ontario. At the provincial level, the community, tribal council and political territorial organization participate in a province-wide coordinating body, the Chiefs of Ontario. The Assembly of First Nations represents the community along with other First Nations organizations and councils as well as over 600 First Nations across Canada. Attawapiskat First Nation, Kashechewan First Nation and Fort Albany First Nation are on the outer ring. Discovery of diamonds by Victor Mine on Attawapiskat First Nation traditional land, was one of the catalysts to further exploration resulting in the discovery of chromite.
  10. First Nations have a constitutional right to be consulted and accommodated by provincial and the federal governments. The federal government has a focus on streamlining review processes through 2012 changes to the Canadian Environmental Assessment Act to avoid a repeat of the lengthy Northern Gateway Pipeline Project Joint Review Panel which had a broad mandate under both the National Energy Board Act and the Canadian Environmental Assessment Act to "consider whether the Northern Gateway Pipeline Project is likely to cause significant adverse environmental effects and if it is in the public interest". The review process included multiple opportunities for the public and Aboriginal groups to provide input NEB.

References

  1. 1 2 Ballingall, Alex; MacCharles, Tonda; Rushowy, Kristin (July 11, 2023). "Doug Ford says this mining region is a top priority". The Star. Ottawa. Retrieved July 23, 2023.
  2. 1 2 3 4 5 6 McKie, David (29 June 2013). "Ring of Fire mining may not benefit First Nations as hoped Internal memo from Aboriginal Affairs paints troubling picture". CBC News.
  3. 1 2 3 4 5 "Marten Falls, Webequie set up blockade in Ring of Fire". Wawatay News. 4 February 2010. Archived from the original on 5 November 2013. Retrieved 29 June 2013.
  4. "First Nations warn true partnership is needed on Ring of Fire development". Winnipeg Free Press. 2010-03-14. Retrieved 2010-03-14.
  5. "Natives lift Ring of Fire blockade". Toronto Star, March 20, 2010.
  6. 1 2 3 4 5 "Ring of Fire lights up Northern Ontario's mining industry". Ontario Business Report. MRI. Archived from the original on 2013-08-10.
  7. Christina Blizzard, "A glimmer of hope in the north". Ottawa Sun, February 16, 2010, p. 15.
  8. Gregory Reynolds (2008-07-28). "Northern Ontario's "Ring of Fire" Mineral Discovery Sets off Staking Rush". Republic of Mining. Retrieved 2010-03-14.
  9. 1 2 3 4 Mike Hosszu; Gavin Sobil; Rosemarie Needham (5 April 2012). Archived copy (PDF) (Report). Lakehead University. Archived from the original (PDF) on 2013-11-05. Retrieved 29 June 2013.{{cite report}}: CS1 maint: archived copy as title (link)
  10. Norm Tollinsky (1 September 2011). "Round two for Richard Nemis". Sudbury Mining Solutions.
  11. 1 2 Freewest Resources Canada Inc (Report). Geology Ontario. Archived from the original on 2013-11-05. Retrieved 2013-06-29.
  12. 1 2 3 4 "Cliffs to acquire chromite deposits from Freewest". Northern Miner: the Global Mining Newspaper. 23 November 2009.
  13. Bert Rowson (20 January 2009). "Ring of Fire". Lake Superior News. Archived from the original on July 6, 2011.
  14. "Ring of Fire Environmental Assessment". Ontario Ministry of Northern Development and Mines. 12 May 2012.
  15. "First Nations Partnerships". Ministry of Northern Development and Mines (MNDM). 18 July 2012.
  16. 1 2 3 "Smelter announcement 'like a funeral' for northwest: Thunder Bay mayor, First Nations leaders weigh in on Cliffs Natural Resources decision to located chromite smelter in Sudbury". CBC News. 9 May 2012.
  17. 1 2 Daniel Tencer (26 April 2013). "Clement: Ontario 'Ring Of Fire' Will Be Canada's Next Oil Sands". The Huffington Post. Canada. Retrieved 29 June 2013.
  18. Peter Koven (13 June 2013). "Resources puts Ring of Fire project on hold, cites unresolved issues". Financial Post.
  19. 1 2 3 4 Euan Rocha; Janet Guttsman (12 March 2013). "Canada sees decades of gains from Ring of Fire deposit". Toronto, Ontario: Reuters.
  20. "Ontario's Ring of Fire". ontario.ca. Retrieved 2022-04-13.
  21. 1 2 3 Younglai, Rachelle; Marotte, Bertrand (March 23, 2015). "Cliffs Natural Resources completes costly exit from Ontario's Ring of Fire". The Globe and Mail. Updated May 12, 2018
  22. 1 2 3 "Ontario releases critical minerals strategy; looks to position itself as global leader". Northern Ontario. 2022-03-17. Retrieved 2022-04-13.
  23. "Q&A with Tony Clement's Office". 11 March 2013. Archived from the original on 29 June 2013.
  24. 1 2 3 4 5 "Action Plan for Supporting Community Participation in the Ring of Fire". Briefing notes. February 2013.
  25. James Murray (25 May 2013). "Premier Dalton McGuinty reaches out to Prime Minister Harper on Ring of Fire". Net Newsledger Headline News.
  26. 1 2 Ian Ross (3 April 2013). "KWG makes it case for a Ring of Fire railroad".
  27. "Bold Ventures on the Road Again in the Ring of Fire". Toronto, Ontario: Marketwire. 5 March 2013. {{cite web}}: Missing or empty |url= (help)
  28. 1 2 "KWG Provides Update on Koper Lake". Market Wire. April 5, 2013.
  29. "Probe Mines Technical Updates on Victory and Tamarack Projects, McFauld's Lake Area". reuters. 2 June 2009. Archived from the original on 5 November 2013. Retrieved 30 June 2013.
  30. 1 2 3 norontresource. "Eagle's Nest Ni-Cu-PGE". Retrieved 2022-04-13.
  31. 1 2 3 4 5 Ross, Ian (April 3, 2013). "KWG makes it case for a Ring of Fire railroad". Northern Ontario Business.
  32. Profile of KWG Resources Inc.; stockhouse. Retrieved 2017-05-29.
  33. "Cliffs' pullout forces Ontario action in Ring of Fire mining area". The Globe and Mail. November 21, 2013. Archived from the original on July 1, 2016.
  34. Michael Woods (1 April 2013). "First Nations leaders fear First Nation Education Act will be federally imposed without adequate consultation". Postmedia. Archived from the original on 23 April 2014.
  35. Northwestern Ontario Broadband Expansion Initiative (Report). 26 March 2012. Archived from the original on 18 July 2013.
  36. Celli, Rita (9 May 2015), "How CBC found the secret diamond royalty: Ontario government breaches its own confidentiality rules to explain royalties for salt and diamonds", CBC, retrieved 11 May 2015
  37. https://www.canadianminingjournal.com/news/diamonds-de-beers-victor-mine-ends-production/
  38. 1 2 Gloria Galloway (24 June 2013). "Bob Rae jumps into Ring of Fire". Ottawa, Ontario: The Globe and Mail.
  39. 1 2 3 4 Thompson, Jon (September 3, 2019). "The Tories are dissolving the Ring of Fire agreement. So what comes next?". TVO. Retrieved September 3, 2019.
  40. 1 2 3 4 5 6 "Chinese railroaders like the route to the Ring of Fire". Northern Ontario Business. June 2, 2017. Retrieved August 24, 2019.
  41. 1 2 3 4 5 "Ring of Fire junior taps China for development cash". Northern Ontario Business. April 26, 2017. Retrieved August 24, 2019.
  42. Alvarez, Luisa; Praill, Colton (April 30, 2017). "TBN Newswatch Sunday". KWG.
  43. "KWG Resources and Chinese railway builders mean business in the Ring of Fire". Timmins Today. April 11, 2016. Retrieved August 24, 2019.
  44. "Ontario pledges 'support' for year-round road access to 3 remote First Nations". CBC. Thunder Bay. August 21, 2017. Retrieved August 24, 2019.
  45. "Ring of Fire developer brings First Nation into the fold". Northern Ontario Business. June 6, 2019. Retrieved August 24, 2019.
  46. 1 2 3 4 5 6 Walters, Jeff (March 22, 2018). "Doug Ford to be keynote speaker at Ring of Fire fundraising event". CBC News. Retrieved August 24, 2019.
  47. 1 2 3 Della-Mattia, Elaine (March 22, 2018). "U.S. role in Ring of Fire proposed". Sault Ste. Marie Star (SAMSSA). Retrieved August 24, 2019.
  48. 1 2 3 4 Helwig, David (March 22, 2018). "Sault politicians scratching their heads over Toronto soirée on Ring of Fire". Sudbury. Retrieved August 24, 2019.
  49. 1 2 "Noront Resources Announces Share Issuance to Marten Falls and Aroland First Nations". NetNewsLedger. Toronto. September 3, 2019. Retrieved September 3, 2019.
  50. 1 2 3 4 5 Prokopchuk, Matt (August 27, 2019). "Individual agreements with Ring of Fire First Nations about moving 'to the sound of business' minister says". CBC News. Retrieved September 3, 2019.
  51. 1 2 3 "Ring of Fire News: Removing our support, government is not listening". Thunder Bay, Ontario: Matawa First Nations. 21 October 2013. Archived from the original on 29 June 2013. Retrieved 29 June 2013.
  52. "Far North Ontario: Community based land use planning in the Far North of Ontario". Ministry of Natural Resources Ontario.
  53. 1 2 "Ontario, First Nations agree on missing link road to the Ring of Fire". Northern Ontario Business. Retrieved 2022-04-13.
  54. 1 2 "Lorraine Explains: Ontario government volunteering over a billion dollars for remote 'Ring of Fire' mining roads". driving. Retrieved 2022-04-13.
  55. 1 2 3 Burgos, Jonathan. "Australian Billionaire Andrew Forrest's Wyloo Metals Beats BHP In Bidding War For Canada's Noront". Forbes. Retrieved 2022-04-13.
  56. "Noront shareholders approve sale to Wyloo Metals". Northern Ontario Business. Retrieved 2022-04-13.
  57. "Mining Weekly - Forrest's Wyloo seals third Canadian deal". Engineering News. Retrieved 2022-04-13.
  58. "Ontario's Critical Minerals Strategy 2022–2027: Unlocking potential to drive economic recovery and prosperity". ontario.ca. Retrieved 2022-04-13.
  59. "Ontario's Critical Minerals Strategy 2022–2027: Unlocking potential to drive economic recovery and prosperity". ontario.ca. Retrieved 2022-04-13.
  60. "Matawa Chiefs fear the consequences of Canada's choice to use a Comprehensive Study Environmental Assessment process in the Ring of Fire" (PDF). Thunder Bay, Ontario. 13 October 2011. Archived from the original (PDF) on 8 September 2012. Retrieved 29 June 2013.
  61. "Matawa Chiefs are in a state of disbelief about the Canadian Environmental Assessment Agency's (CEAA) decision to side with industry by choosing a Comprehensive Study Environmental Assessment (EA) process for the Cliff's Chromite Project near Webequie and Marten Falls First Nations". Thunder Bay, Ontario: Matawa First Nations. 13 October 2011. {{cite web}}: Missing or empty |url= (help)
  62. 1 2 Steve May (2019-05-18). "Ring of Fire bungling jeopardizes Green prosperity for North". Sudbury Star. Sudbury, Ontario. Retrieved 2019-05-19.
  63. "Webequie signs provincial Ring of Fire agreement". Wawatay News. 21 June 2012. Archived from the original on 5 November 2013.
  64. "First Nation wants to slow the pace of mining activities: Webequie residents say process needs to slow down so they can participate in Ring of Fire". Thunder Bay, Ontario: CBC News. 11 June 2012.
  65. Evan Solomon (27 June 2013). "First Nations and the Ring of Fire". Power and Politics. CBC.

52°46′0″N 86°3′0″W / 52.76667°N 86.05000°W / 52.76667; -86.05000

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.