Pazflor oil fields: Perpetua, Hortensia, Zinia, Acacia | |
---|---|
Country | Angola |
Block | 17 |
Offshore/onshore | Offshore |
Operators | Total S.A. |
Partners | Total S.A. Statoil ExxonMobil BP |
Field history | |
Discovery | 2000–2003 |
Start of production | 2011 |
Production | |
Recoverable oil | 590 million barrels (~8.0×10 7 t) |
Producing formations | Upper Miocene Oligocene |
The Pazflor oil development is an offshore oil development in Angola. It involves Perpetua, Hortensia and Zinia (Upper Miocene), and Acacia (Oligocene) oilfields, which were discovered between mid-2000 and early 2003.
Location
The Pazflor oil development located in center of Block 17 about 150 kilometres (93 mi) off the coast of Angola and 40 kilometres (25 mi) north-east of Dalia oilfield in depths of 600 to 1,200 metres (2,000 to 3,900 ft). It covers 600 square kilometres (230 sq mi) with a north-south axis of over 30 kilometres (19 mi).[1]
Technical features
The Pazflor oil development will produce heavy crude oil from Miocene reservoirs, and lighter oil from the Acacia Oligocene reservoir. Drilling operations were commenced in 2009 and oil production started on 24 August 2011.[2] The processing capacity of 200,000 barrels per day (32,000 m3/d) of oil will be ensured with 49 wells.[1] The Pazflor FPSO was constructed in South Korea and on the 18 January 2011 it started the 10,000-nautical-mile (19,000 km; 12,000 mi) journey to Angola where it was moored and installed. It was towed by three Fairmount Marine's tugs.[3]
Operator
Sonangol is the Block 17 concessionaire. Like other developments in the Block 17, the operator is Total S.A. with interest of 40%, and other partners are Statoil (23.33%), ExxonMobil (20%) and BP (16.67%).[1]
References
- 1 2 3 "Total Launches Pazflor Development on Block 17, Angola - a World Technology First". OilVoice. 2007-12-27. Retrieved 2007-12-31.
- ↑ "Total Says Production Starts at Pazflor Field Off Angola". San Francisco Chronicle. Bloomberg. 2011-08-25. Retrieved 2011-08-27.
- ↑ "Fairmount Marine commenced tow of ultra large FPSO Pazflor" (Press release). Fairmount Marine. 2011-01-18. Retrieved 2011-08-27.