A pile splice joins two segments of a driven pile, using either a weld (typical for H beams), grout or mechanical means (typical for precast concrete piles). Pile splices enable the use of shorter segments, which allows for driving piles in low-headroom situations such as under bridges or inside buildings.[1] Reducing length of pile segments to under ~65 feet long also means the trailers that haul them to job sites can stay within state length limits.[2]
References
- ↑ "Concrete Pile Splices", PileBuck International, Inc. Retrieved on 7 December 2012.
- ↑ "Size & Weight Limits", America's Independent Truckers' Association, Inc. Retrieved on 7 December 2012.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.