Red Line
Overview
StatusUnder construction
LocaleSurat, Gujarat, India
Termini
  • Sarthana
  • DREAM City
Stations20
Service
TypeRapid transit
SystemSurat Metro
Operator(s)Gujarat Metro Rail Corporation Limited
Rolling stockTitagarh Rail Systems[1]
Technical
Line length21.61 km (13.43 mi)
CharacterElevated & Underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed
  • 80 km/h (50 mph) (Top)
  • 32 km/h (20 mph) (average)
Route map

Sarthana
Nature Park
Varachha Chopati Garden
Shri Swaminarayan Mandir Kalakunj
Kapodra
Labheshwar Chowk
Central Warehouse
Surat Railway Station Surat railway station
Maskati Hospital
Gandhi Baug
Kadarsha Ni Nal
Majura Gate Subway interchange Green Line (Under construction)
Rupali Canal
Althan Tenament
Althan Gam
VIP Road
Woman ITI
Bhimrad
Convention Center
DREAM City

Line 1 of Surat Metro also known as The Red Line (Line 1) is an under-construction metro rail line of the Surat Metro, a rapid transit system in Surat, Gujarat, India. This line consists of 20 metro stations from Sarthana to DREAM City with a total distance of 21.61 km. 15.14 km of this distance will be elevated and 6.47 km underground. It is expected to be operational by December 2027.[2][3]

List of stations

Following is a list of stations on this route:

Red Line
# Station Name Opening Connections Layout
EnglishGujarati
1SarthanaસરથાણાUnder constructionNoneElevated
2Nature Parkનેચર પાર્કUnder constructionNoneElevated
3Varachha Chopati Gardenવરાછા ચોપાટી ગાર્ડનUnder constructionNoneElevated
4Shri Swaminarayan Mandir Kalakunjશ્રી સ્વામિનારાયણ મંદિર કલાકુંજUnder constructionNoneElevated
5Kapodraકાપોદ્રાUnder constructionNoneUnderground
6Labheshwar Chowkલાભેશ્વર ચોકUnder constructionNoneUnderground
7Central Warehouseસેન્ટ્રલ વેરહાઉસUnder constructionNoneUnderground
8Surat Railway Stationસુરત રેલ્વે સ્ટેશનUnder constructionSurat railway stationUnderground
9Maskati Hospitalમસ્કતી હોસ્પિટલUnder constructionNoneUnderground
10Gandhi BaugગાંધીબાગUnder constructionNoneUnderground
11Kadarsha Ni Naalકાદરશા ની નાળUnder constructionNoneElevated
12Majura Gateમજુરા ગેટUnder constructionGreen Line (Under construction)Elevated
13Rupali Canalરૂપાલી કેનાલUnder constructionNoneElevated
14Althan Tenamentઅલથાણ ટેનામેન્ટUnder constructionNoneElevated
15Althan Gamઅલથાણ ગામUnder constructionNoneElevated
16VIP Roadવી.આઈ.પી રોડUnder constructionNoneElevated
17Woman ITIવુમન આઈ.ટી.આઈUnder constructionNoneElevated
18BhimradભીમરાડUnder constructionNoneElevated
19Convention Centerકન્વેન્શન સેન્ટરUnder constructionNoneElevated
20DREAM Cityડ્રીમ સિટીUnder constructionNoneElevated

See also

References

  1. PTI (27 June 2023). "Titagarh Rail Systems bags Rs 857 cr order for Surat Metro Rail". ThePrint. Retrieved 27 June 2023.
  2. "Surat Metro phase I to start operations in December 2027 – Check route, distance and stations here". www.financialexpress.com. 13 July 2023. Retrieved 5 September 2023.
  3. "Surat Metro: Phase I to Start Operations in Dec 2027, Check Route, Distance, Stations and More". www.news18.com. 12 July 2023. Retrieved 5 September 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.