Réseau Ferroviaire Rapide
Overview
StatusOperational
LocaleTunis, Le Bardo, La Manouba, Ezzouhour, Sidi Hassine, and El Hraïria, Tunisia
Termini
Stations18
Service
Typerailway
Operator(s)Société des transports de Tunis
History
Opened2021 (2021)
Technical
Line length25 kilometres (16 mi)
Number of tracks2
CharacterSurface
Track gauge4 ft 8+12 in (1,435 mm)

The Réseau Ferroviaire Rapide is an urban rail system under construction and development in Tunis, Tunisia that has experienced ongoing delays since 2007. Reasons for the delays range from theft of equipment, work stoppages, lack of regional support, cost overruns, and the COVID-19 pandemic.[1]

As of September 2022, "We have been hearing about the imminent inauguration of the Rapid Railway Network of Tunis (RFR) project for years. Except that each time, this inauguration is postponed to a later date without explanation."[2]

A twenty five kilometer railroad which has existed since 1882, that connects Tunis to Borj Cédria, Tunisia, was set to be integrated into the Tunis RFR as line A of the network.[3]

See also

Website

References

  1. JELASSI, Mohamed Khalil (2022-09-23). "Réseau ferroviaire rapide (RFR) : Un retard interminable !". La Presse de Tunisie (in French). Retrieved 2022-11-23.
  2. "RFR : La ligne E inaugurée à l'occasion de la rentrée scolaire". www.webdo.tn (in French). 2022-08-26. Retrieved 2022-11-23.
  3. "Réseau ferroviaire rapide de Tunis — Wikipédia". fr.wikipedia.org (in French). Retrieved 2022-11-23.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.