Ann Arbor–Detroit Regional Rail
Overview
Service typeRegional rail
StatusProposed
LocaleSoutheast Michigan
Current operator(s)RTA
Ridership1,150–1,750 (projected)
Route
TerminiAnn Arbor
New Center, Detroit
Stops5
Distance travelled39.72 mi (63.92 km)
Average journey time45 minutes
Service frequency8 round-trips per day
Line(s) usedMichigan Line
Technical
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Track owner(s)MDOT
Route map
Ann Arbor
Amtrak
Ypsilanti
Wayne
Dearborn
Amtrak
Detroit
Amtrak

Ann Arbor–Detroit Regional Rail (also known as MiTrain and formerly known as SEMCOG Commuter Rail[note 1]) is a planned regional rail link along the Michigan Line between the cities of Ann Arbor and Detroit, Michigan, a total length of 39.72 miles (63.92 km).[1] The project would connect with a proposed Detroit bus rapid transit service and the QLine streetcar.[1]

History

Detroit previously had commuter rail service. Until 1983, SEMTA operated Grand Trunk Western Railroad's former service between downtown Detroit, and Pontiac, Michigan. Amtrak continued Penn Central Detroit–Ann Arbor commuter service as the Michigan Executive until 1984.

In May 2009 SEMCOG commissioned a $200,000 study to determine whether commuter trains could operate along the same corridor as Amtrak intercity passenger trains and freight trains.[2] As of November 2012 limited service for special events in Detroit was scheduled to begin in early 2013, while regular commuter service was scheduled for 2014, after further track upgrades are completed.[3] However, As of October 2013 no operating funds had been identified and service was at least two years out.[4]

From November 12 to 14, 2012, testing of the railcar fleet by an Amtrak GE Dash 8-32BWH locomotive took place between Pontiac and Jackson; while service will only initially operate between Ann Arbor and Detroit, testing the fleet on additional trackage eases the process required for future expansion to Jackson and Pontiac.[3] The locomotives have not yet been tested.

The plan was folded into the RTA's master plan in May 2016.[5] The service was estimated to cost $11-$19 million to operate annually, and $130 million in capital costs to start. At that time, it was thought that service could begin in 2022.[5]

However as of November 2022, there has not been any updates on the project, and it is unknown if it was canceled or is still happening.

Service

The service is proposed to operate eight round-trips during each day: three during morning and afternoon rush-hours, one during the midday, and one in the evening.[6] An end-to-end ride is estimated to take 45 minutes, and there would be stops at Ann Arbor, Ypsilanti, Wayne, Dearborn and the New Center neighborhood in Detroit. Of these stops, four are existing or proposed Amtrak stations, and one (Wayne) would be a new station used exclusively for the regional rail service.[6]

Rolling stock

SEMCOG Commuter Rail's rolling stock are all ex-Metra Budd bi-level gallery-type cars and ex-GO Transit EMD F59PH units currently owned by RB Railway Leasing.[7] SEMCOG has painted its rolling stock. Like on Metra cab cars, SEMCOG's cab cars have red and white warning stripes at the front. They have plates that say "MiTrain" on the sides. As of 2020, the gallery cars were sold off to WeGo Star, while F59PH locomotives remain with RB Railway Leasing.

See also

Notes

  1. SEMCOG stands for Southeast Michigan Council of Governments, and is a collection of town, township, county, and city governments

References

  1. 1 2 "Master Plan". Regional Transit Authority of Southeast Michigan. Retrieved August 4, 2016.
  2. Stolarz, Christina (May 21, 2009). "SEMCOG to spend $200K on Ann Arbor–Detroit rail study". The Detroit News. Retrieved May 21, 2009.
  3. 1 2 "Michigan tests cars for future commuter service". Trains Magazine. November 13, 2012. Retrieved November 19, 2012.(subscription required)
  4. Askins, Dave (October 16, 2013). "Regional Transit: Where Does Ann Arbor Fit?". The Ann Arbor Chronicle.
  5. 1 2 Fleming, Leonard N. (May 20, 2016). "RTA wants Detroit-Ann Arbor commuter rail service". The Detroit News. Retrieved August 4, 2016.
  6. 1 2 "Michigan Avenue Corridor Study Locally Preferred Alternative Report DRAFT May 2016" (PDF). Regional Transit Authority of Southeast Michigan. Archived from the original (PDF) on August 4, 2016. Retrieved August 4, 2016.
  7. Ann Arbor-Downtown Detroit Transit Study: Detailed Screening of Alternatives
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.