Western Avenue | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | 358 University Avenue West (Eastbound) 401 University Avenue West (Westbound) Saint Paul, Minnesota | ||||||||||
Coordinates | 44°57′21″N 93°6′58″W / 44.95583°N 93.11611°W | ||||||||||
Owned by | Metro Transit | ||||||||||
Platforms | 2 split side platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | At-grade | ||||||||||
Bicycle facilities | Nice Ride station | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | June 14, 2014 | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Western Avenue station is a light rail station on the Metro Green Line in Saint Paul, Minnesota, United States. It is located along University Avenue on both sides of the intersection with Western Avenue. The station has split side platforms, with the westbound platform on the north side of the tracks west of Western and the eastbound platform on the south side of the tracks east of Western.[1]
Along with Hamline Avenue Station and Victoria Street Station, this station was originally planned to be an infill station that would be built after the main line was constructed and if there was sufficient demand. However, significant political pressure and changes in the Federal Transit Administration's rules led to an early 2010 announcement that it would be built at the same time as the rest of the line.[2][3]
Construction in this area began in 2012.[4] The station opened along with the rest of the line in 2014.
References
- ↑ "Central Corridor light rail illustrated plans". Central Corridor. Metropolitan Council. June 28, 2010. Archived from the original on September 7, 2010. Retrieved September 18, 2010.
- ↑ "FY 2009 New Starts and Small Starts Evaluation and Rating Process". Federal Transit Administration. 2009. Archived from the original on 2010-01-19. Retrieved 2010-02-02.
- ↑ "New rail line to get 3 added St. Paul stations". StarTribune. 2010-01-25. Retrieved 2010-02-02.
- ↑ "Central Corridor LRT construction schedule at a glance". Central Corridor. Metropolitan Council. July 20, 2010. Archived from the original on September 24, 2010. Retrieved September 18, 2010.