S/N Station Location Type of Power Station Capacity (MW) In-Service year
1 Renala Renala, Punjab Run of Canal 1 1925
2 Malakand / Jabban Malakand, KPK Run of River 22 1935
3 Rasul Mandi Bahauddin, Punjab Run of Canal 22 1952
4 Dargai Malakand, KPK Run of Canal 20 1952
5 Kurram Garhi Kurram Garhi, KPK Run of Canal 4 1958
6 Chichonki Malian Sheikhupura, Punjab Run of Canal 13 1959
7 Warsak Peshawar, KPK Run of River 243 1960
8 Shadiwal Shadiwal, Gujrat, Punjab Run of Canal 14 1961
9 Nandipur Gujranwala, Punjab Run of Canal 14 1963
10 Mangla Mirpur, Azad Kashmir Reservoir 1,000 1967
11 Chitral Chitral, KPK Run of Canal 1 1975
12 Tarbela Tarbela, KPK Reservoir 4,888 1977
13 Chashma Chashma, Punjab Run of River 184 2000
14 Jagran Neelum, Azad Kashmir Hydro 30 2000
15 Ghazi-Barotha Attock, Punjab Run of River 1,450 2003
16 Malakand-III Malakand, KPK Run of River/Canal 84 2008
17 Khan Khwar Shangla, KPK Reservoir 72 2010
18 Pehur Swabi, KPK Canal Fall/Run of River 18 2010
19 Jinnah Jinnah Barrage, Punjab Run of River 96 2012
20 Garam Chashma Chitral, KPK Hydro 1 2012
21 Allai Khwar Mansehra, KPK Reservoir 121 2013
22 Gomal Zam South Waziristan Reservoir 17 2013
23 New Bong Escape
(Laraib Energy)
Mirpur, Azad Kashmir Hydro 84 2013
24 Duber Khwar Kohistan, KPK Reservoir 130 2014
25 Patrind Hydro Muzaffarabad, Azad Kashmir Run of River 147 2017
26 Golen Gol Chitral, KPK Run of River 108 2018
27 Neelum–Jhelum Muzaffarabad, Azad Kashmir Run of River 969 2018
28 Marala Hydro (PPDCL) Sialkot, Punjab Canal Fall/Run of River 8 2018
29 Gulpur Hydropower Plant, Barali Kotli, Azad Kashmir Run of River 100 2020
30 Daral Khwar Swat District, KPK Run of River 37 2021
31 Ranolia Kohistan, KPK High Head 17 2021
32 Karot Azad Kashmir / Punjab Run of River 720 2022
Total In-Service Generation 10,635

Under construction

StationCommunityLocationCapacity (MW)Status
Jagran-II Hydropower ProjectNeelum, Azad KashmirNeelum River48Under construction. To be operational by Feb 2020.[2]
Karora Hydropower PlantShangla, KPKKhan Khwar River11.8Under construction. To be operational by Jun 2020.[3]
Jabori Hydropower ProjectMansehra, KPKSiran River10.8Under construction. To be operational by Jun 2020.[3]
Naltar-III Hydropower ProjectNaltar, Gilgit-Baltistan16Under construction. To be operational by Jul 2020.[4]
Nara Hydropower ProjectNara, Sindh13.6Under construction. To be operational by Mar 2021.[5]
Kohala Hydropower ProjectMuzaffarabad, Azad Kashmir1124Under construction. To be operational by 2025.
Azad Pattan Hydropower ProjectSudhanoti, Azad Kashmir700Under construction. To be operational by 2025.
Koto Hydropower PlantLower Dir, KPKPanjkora River40.8Under construction. To be operational by Dec 2021.[6]
Naulong DamJhal Magsi, Balochistan4.4Under construction. To be operational by 2022.[7]
Sharmai Hydropower ProjectUpper Dir, KPK150Under construction. To be operational by 2022.[8]
Shagarthang Hydropower ProjectSkardu, Gilgit-Baltistan26Under construction. To be operational by 2022.[9][10]
Chiniot DamChiniot, Punjab80Under construction. To be operational by Dec 2022.[11]
Suki Kinari Hydropower ProjectMansehra, KPK884Under construction. To be operational by 2023.[12]
Lawi Hydropower PlantChitral, KPK69Under construction. To be operational by 2023.[13]
Kurram Tangi Dam- Stage INorth Waziristan, FATAKurram River83.4Under construction. To be operational by Jun 2023.[14]
Matiltan Hydropower ProjectSwat, KPK84Under construction. To be operational by Jul 2023.[15]
Shingo Kas Hydropower ProjectDir, KPK102Under construction. To be operational by Mar 2024.[16]
Nai Gaj DamDadu, Sindh4.2Under construction. To be operational by Oct 2024.[17]
Mohmand DamMohmand Agency, KPK34°21′11″N 71°31′58″E / 34.35306°N 71.53278°E / 34.35306; 71.53278 (Munda Dam)800Under construction. To be operational by Dec 2025.[18]
Dasu DamDasu, KPK4,320Under construction. Stage-I: 2,160 MW to be operational by April 2026.[19]
Keyal Khwar Hydropower ProjectKohistan, KPKKeyal Khwar River128Under construction. To be operational by 2026.[17]
Tarbela Dam Extension-VTarbela, KPK34°05′23″N 72°41′54″E / 34.08972°N 72.69833°E / 34.08972; 72.69833 (Mangla Dam)1,530Under construction. To be operational by 2025.[20][21]
Tangir Hydropower Project Chilas, Gilgit-Baltistan 21[22] Under construction.[23] To be operational by 2028 [24]
Diamer-Bhasha Dam Chilas, Gilgit-Baltistan 4,500 Under construction. To be operational by Jun 2029.[18]
Total Under-Construction Generation 14,600+

Proposed

StationCommunityLocationCapacity (MW)Status
Balakot Hydropower ProjectMansehra, Khyber Pakhtunkhwa300Ready to be constructed in 2020.[25]
Athmuqam DamAthmuqam, Azad Kashmir350Ready to be constructed. Korea Hydro & Nuclear Power Corporation won the contract for construction.[26]
Toren More ProjectKPK35Ready to be constructed. Sinohydro Corporation China and Sichuan Energy Industry Investment Group Co. Ltd. China won the contract for construction.[27]
Turtonus-Uzghor DamChitral, KPK58Ready to be constructed. Sinohydro Corp Ltd and Sachal Engineering Works Private Ltd won the contract for construction.
Lower Spat Gah hydropower projectKohistan, KPK496Ready to be constructed.[28]
Arkari Gol Hydropower ProjectChitral, KPK99Ready to be constructed.[29]
Taunsa Barrage Hydropower PlantMuzaffargarh, Punjab120Ready to be constructed.[30]
Chianwali Hydropower ProjectGujranwala, Punjab5.38Ready to be constructed.[31]
Deg Outfall Hydropower ProjectGujranwala, Punjab4.04Ready to be constructed.[31]
Okara Hydropower ProjectGujranwala, Punjab4.16Ready to be constructed.[31]
Chashma Hydel Power ProjectMianwali, Punjab5.0Ready to be constructed.
Mahl Hydropower ProjectAzad Kashmir34°55′N 73°34′E / 34.917°N 73.567°E / 34.917; 73.567 (Mahl)590Ready to be constructed. China Three Gorges Corporation won the contract for construction.[32]
Nekherdim-Paur DamChitral, KPK80Ready to be constructed. CTG won the contract for construction.[33]
Chakothi-Hattian Hydropower ProjectMuzaffarabad, Azad Kashmir500Ready to be constructed. Chinese firm won the contract for construction.
Hanzel Hydropower ProjectHanzel, Gilgit20Ready to be constructed. Cost estimate $63 million.[34]
Kalam AsritKalam, KPK197Ready to be constructed. KPK government signed MOU with Korea’s state-owned M/S Korea South East Power Company. Cost estimate $500 million.[35]
Ghowari Hydropower ProjectGilgit-Baltistan30Ready to be constructed. Cost estimate $80 million.[36]
Bara DamTirah, Khyber Agency5.8Ready to be constructed.[37][38][39][40]
Bunji Hydropower ProjectAstore District, Gilgit-Baltistan35°39′N 74°36′E / 35.650°N 74.600°E / 35.650; 74.600 (Bunji Hydropower)7,100Ready to be constructed. MOU signed with China’s National Energy Administration.[41] Cost estimate $6.8 billion.[42]
Kalabagh DamMianwali District, Punjab3600Proposed.
Patan hydropower ProjectPatan Village, Indus River2,400Ready to be constructed. MOU signed with China’s National Energy Administration.[38][39][40][43] Cost estimate $6 billion.[44]
Harpo Hydropower ProjectSkardu, Gilgit-Baltistan34.5Ready to be constructed.[45]
Thakot Hydropower ProjectBattagram District, KPK34°45′N 72°55′E / 34.750°N 72.917°E / 34.750; 72.917 (Thakot)4,000Feasibility studies to be completed by Dec 2017. MOU signed with China’s National Energy Administration[38][39][40] Cost estimate $6 billion.[44]
Phandar Hydropower ProjectGupis-Yasin District, Gilgit-Baltistan81Detailed engineering design or tender of documents under process.[37][40] Cost estimate $128 million .[44]
Basho Hydropower StationSkardu, GB, Indus River28Detailed engineering design or tender of documents under process.[37][38] Cost estimate $40 million.[44]
Tank Zam DamHinis Tangi, KPK, Tank Zam River25.5Feasibility studies completed.[38] Cost estimate $234 million.[42]
Hingol DamLasbela District, Hingol River, Balochistan3.5Feasibility studies completed. Cost estimate $311 million.[42]
Akhori DamAkhori, Punjab, Haro River600Feasibility studies ongoing. Cost estimate $1.6 billion.[44]
Katzarah DamSkardu, Gilgit-Baltistan15000Proposed.
Middle Palas hydropower projectKohistan, KPK373Feasibility studies ongoing.[38][39][40] Cost estimate $763 million.[42]
Upper Palas hydropower projectKohistan, KPK160Feasibility studies ongoing.[38][39][40] Cost estimate $763 million.[42]
Madian Hydropower ProjectSwat, KPK, Swat River157Feasibility studies ongoing.[46]
Shushai-Zhendoli Hydropower ProjectChitral, KPK144Financing is being arranged for these projects by selling shares in the existing projects.[47]
Shogosin Hydropower ProjectChitral, KPK132Financing is being arranged for these projects by selling shares in the existing projects.[47]
Latambar DamKarak District, Khyber Pukhtunkhwa ?The preliminary feasibility study of the project has been completed and process of site selection completed.[48]
Mairoobi DamNowshera District, Khyber Pukhtunkhwa ?The preliminary feasibility study of the project has been completed and process of site selection completed.[48]
Jaroba DamNowshera District, Khyber Pukhtunkhwa ?The preliminary feasibility study of the project has been completed and process of site selection completed.[48]
Naran DamMansehra District, Khyber Pukhtunkhwa188EOI invited.[48]
Gorband Hydropower ProjectShangla District, KPK14The preliminary feasibility study of the project has been completed and process of site selection completed.[48][49]
Nand Bahar DamBattagram District, Khyber Pukhtunkhwa50The preliminary feasibility study of the project has been completed and process of site selection completed.[48]
Mojigram Shagoor DamChitral District, Khyber Pukhtunkhwa50The preliminary feasibility study of the project has been completed and process of site selection completed.[48]
Astar Rabooni DamChitral District, Khyber Pukhtunkhwa50The preliminary feasibility study of the project has been completed and process of site selection completed.[48]
Arkari Gol DamChitral District, Khyber Pukhtunkhwa50The preliminary feasibility study of the project has been completed and process of site selection completed.[48]
Shringal DamUpper Dir District, Khyber Pukhtunkhwa50The preliminary feasibility study of the project has been completed and process of site selection completed.[48]
Patrak Barikot DamSwat District, Khyber Pukhtunkhwa60The preliminary feasibility study of the project has been completed and process of site selection completed.[48]
Segokatch DamChitral District, KPK60The preliminary feasibility study of the project has been completed and process of site selection completed.[48]
Taunsa Hydropower Project135IPP, RFP has been accepted.[50]
Shigo Kas Hydropower Project102EOI invited.[50]
Bata Kundi Hydropower Project96EOI invited.[50]
Ghorband Khwar Hydropower Project21EOI Iinvited.[50]
Nandihar Khwar Hydropower Project12EOI invited.[50]
Winder DamLasbela District, Winder River, Balochistan0.3Proposed. Cost estimate $148 million.[42]
Daraban Zam DamDera Ismail Khan, KPK, Khora River0.75Proposed. Cost estimate $69 million.[42]
Ghabir DamGhabir River0.15Proposed. Cost estimate $121 million.[42]
Papin DamRawalpindi District, Wadala Kas0.3Proposed. Cost estimate $101 million.[42]
Rajhdani DamKotli District, AJK Poonch River132EOI invited.[33]
Gabral KalamKalam, Khyber Pakhtunkhwa101LoS issued.
Bhadi Dhoba Hydropower ProjectHaveli District1Proposed.
Galeter Hydropower ProjectKotli District1Proposed.[51]
Saridoa Cross Hydropower ProjectBhimber District1.7Proposed.
Chamfall Hydropower ProjectHattian District6.4Proposed.[51]
Guddu Hydropower StationKashmore, Sindh33Proposed.
Harighel Hydropower Project53Proposed.
Sehra Hydropower ProjectAzad Kashmir, Poonch River130Proposed.
Nagdar Hydropower ProjectNeelum, AJK, Jagran River25Proposed.[52]
Duwarian Hydropower ProjectHattian Bala, AJK, Jagran River29Proposed.[52]
Asrit-Kedam Hydropower ProjectKalam, KPK, Swat River215LOI issued by PEDO, KPK to Korea's state-owned company, M/S Korea South East Power Company (KOEN) working through KOAK Power Limited.
Karang Hydropower Project458Proposed.
Shogo-Sin Hydel Dam132Proposed.
Shushgai Zhendoll144Proposed.
Yogo, Pakistan500Proposed.
Thor Hydropower Project3.6Proposed.[42]
Yulbo Hydropower Project3000Proposed.[44]
Shyok Hydropower Project520Proposed.[44]
Tungus Hydropower Project2200Proposed.[44]
Skardu DamSkardu1600Proposed.[44]
Dudhnial Hydropower Project960Proposed.[44]
Kundal Shahi Hydropower Project960Proposed.[44]
Trappi Hydropower Project32Proposed.[44]
Nandihar Hydropower ProjectBattagram, Khyber Pukhtunkhwa10Proposed.[49]
Mujigaram Shagore Hydropower ProjectChitral, Khyber Pukhtunkhwa51Proposed.[49]
Istaro Booni Hydropower ProjectChitral, Khyber Pukhtunkhwa52Proposed.[49]
Arkari Gol Hydropower ProjectChitral, Khyber Pukhtunkhwa79Proposed.[49]
Total proposed Generation 30,237+

See also

References

  1. "State of Industry report 2022" (PDF). nepra.org.pk. Retrieved 2023-06-06.
  2. "48 MW Jagran- II HPP". Fwo.com.pk.
  3. 1 2 "KP Govt completes 255 mini hydropower projects, proposes 7 projects for inclusion in CPEC". www.thenews.com.pk.
  4. "Federal Govt vows for early completion of hydro power projects in Gilgit Baltistan - SUCH TV". 16 December 2019.
  5. "Sindh's first run-of-the-river power plant seeks generation licence". Thenews.com.pk.
  6. "Koto hydropower project to be completed by Dec". 24 May 2021.
  7. "Work on Naulong Dam to be started soon, Senate body told". www.radio.gov.pk. Archived from the original on 2020-06-03. Retrieved 2020-05-31.
  8. "Sharmai hydropower project". Nation.com.pk. 10 September 2017.
  9. "Shagarthang Hydropower Project approved – PAMIR TIMES". Pamirtimes.net. 12 November 2011. Retrieved 2018-07-17.
  10. "(ECNEC) Friday approved the 26 MW Shagarthang Hydropower Project for Skardu : ResultDon - - Results, Exams, Education, Jobs". Resultdon.blogspot.com.
  11. "Chiniot Dam to be completed by December". 10 April 2022.
  12. "Suki Kinari power project a symbol of Pak-China strong bonds". nation.com.pk. Archived from the original on 2022-02-10.
  13. "Hydropower potential".
  14. "Phase 1 of Kurram Tangi dam to be completed by June 2023". 24 November 2021.
  15. "84 MW Grokin Matiltan HPP Kalam to be Completed in 2023: PEDO".
  16. "SaifCo Hydropower Limited (SCHPL) Seeks Power Generation License For 102 MW Hydropower Project - UrduPoint". Urdupoint.com.
  17. 1 2 "Wapda vows to add 11MAF water to national storage". 22 March 2021.
  18. 1 2 "Work on Dasu project resumes". 16 October 2021.
  19. "Dasu Hydropower Project". www.wapda.gov.pk. Retrieved 2023-06-06.
  20. "Tarbela 5th Extension". www.wapda.gov.pk. Retrieved 2023-06-06.
  21. "Tarbela 5th extension project to generate electricity by 2025". 20 May 2023. Retrieved 6 June 2023.
  22. Ghumman, BR Web Desk | Mushtaq (2020-05-14). "21MW Tangir Hydropower Project: Wapda, JV of Power China-FWO ink agreement". Brecorder. Retrieved 2020-06-25.
  23. "Contractors moving to Diamer-Bhasha Dam site". The Express Tribune. 25 June 2020. Retrieved 25 June 2020.
  24. "Govt plans Tangir Dam to power Bhasha Dam construction". The Nation. 2018-07-18. Retrieved 2020-06-25.
  25. "300 MW Balakot Hydro Power Project To Be Started This Year". UrduPoint.
  26. "Power board approves projects of 2,630MW capacity". 5 March 2014.
  27. "Sinohydro Corporation China, Sichuan Energy Industry Investment Group C.Ltd To Execute Toren More Hydropower Project". UrduPoint.
  28. "KHNP wins deal to build 496-megawatt hydropower plant in Pakistan'". www.ajudaily.com. November 6, 2018.
  29. Report, Monitoring (October 24, 2018). "Master group wins bid to setup 99MW hydropower project".
  30. "Hydro Power: Electricity project on Taunsa barrage - The Express Tribune". Tribune.com.pk. 24 April 2011.
  31. 1 2 3 "Power crisis: Punjab earmarks Rs10b for energy projects - The Express Tribune". Tribune.com.pk. 10 June 2012.
  32. "Timely Completion Of Cpec Projects, Our Priority: Sardar Masood Khan". KashmirWatch. Retrieved 2018-07-17.
  33. 1 2 "Power board approves projects of 2,630 MW capacity - The Express Tribune". Tribune.com.pk. 6 March 2014.
  34. Reporter, The Newspaper's (2 October 2015). "Ecnec approves Rs102bn projects". Dawn.com.
  35. "KP govt, Korean company ink MoU for building hydropower project". Thenews.com.pk.
  36. "CDWP approves Rs130b development projects - Daily Pakistan Observer -Daily Pakistan Observer –". pakobserver.net. Archived from the original on 2018-12-05. Retrieved 2020-05-31.
  37. 1 2 3 "32 dams to be constructed | the Nation". Archived from the original on 2012-02-22. Retrieved 2010-08-02.
  38. 1 2 3 4 5 6 7 "Archived copy". Archived from the original on 2014-07-22. Retrieved 2014-08-27.{{cite web}}: CS1 maint: archived copy as title (link)
  39. 1 2 3 4 5 "Archived copy". Archived from the original on 2010-12-01. Retrieved 2010-08-17.{{cite web}}: CS1 maint: archived copy as title (link)
  40. 1 2 3 4 5 6 "High Commission for Pakistan, London" (PDF). www.pakmission-uk.gov.pk.
  41. "Experts express satisfaction on NJHP progress". Nation.com.pk. 2 November 2016.
  42. 1 2 3 4 5 6 7 8 9 10 "Archived copy" (PDF). Archived from the original (PDF) on 2013-03-03. Retrieved 2014-04-16.{{cite web}}: CS1 maint: archived copy as title (link)
  43. "32,701mw power projects to be completed in 7 years". Nation.com.pk. 2 December 2013.
  44. 1 2 3 4 5 6 7 8 9 10 11 12 "Archived copy" (PDF). Archived from the original (PDF) on 2012-05-11. Retrieved 2014-03-24.{{cite web}}: CS1 maint: archived copy as title (link)
  45. "Tractebel to lead JV for Harpo River hydro project, Pakistan - International Water Power". www.waterpowermagazine.com.
  46. "Private Power & Infrastructure Board". Ppib.gov.pk. 2014-10-16. Archived from the original on 2018-07-17. Retrieved 2018-07-17.
  47. 1 2 "Ranolia HPP - The Progress of PTI in KPK". kpkprogress.wordpress.com. 13 September 2015.
  48. 1 2 3 4 5 6 7 8 9 10 11 12 "KP Govt to construct three small dams in Karak, Nowshera". Samaa.tv.
  49. 1 2 3 4 5 "Power Sector - The Progress of PTI in KPK". kpkprogress.wordpress.com. 20 October 2015.
  50. 1 2 3 4 5 "Hydroelectric power: Investor that quotes lowest tariff will win project bid - The Express Tribune". Tribune.com.pk. 29 October 2016.
  51. 1 2 "PakistanIndependentNewsAgency-PakistanPressInternational". ppinewsagency.com. Archived from the original on 2014-03-17. Retrieved 2014-03-17.
  52. 1 2 Naqash, Tariq (31 January 2016). "AJK, Wapda to sign Neelum power accord". Dawn.com.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.