The following page lists all power stations in Madagascar. The list is not complete. You can assist by adding relevant referenced content.
Hydroelectric
Operational
| Hydroelectric station | Community | Coordinates | River | Type | Name of reservoir | Capacity (MW) | Year completed |
|---|---|---|---|---|---|---|---|
| Andekaleka Hydroelectric Power Station | Andekaleka | Vohitra River | Gravity | N/A | 91 MW | 1982, 2012 | |
| Antelomita Hydroelectric Power Station | Anjeva Gara | Ikopa River | Gravity | N/A | 8.4 MW | 1930, 1952, 1953 | |
| Farahantsana Hydroelectric Power Station | Mahitsy[1] | Ikopa River | Gravity | N/A | 28 MW | 2022 | |
| Mandraka Power Station | Mandraka | Mandraka River | Gravity | Lake Mandraka | 24 MW | 1956 | |
| Ankevirato Hydroelectric Power Station[2] | Tsarazaza | Rianamboa River | Gravity | 560 kW | 2023 | ||
Under construction
| Hydroelectric station | Community | Coordinates | Fuel type | Capacity | Year completed | Name of Owner | Notes | |
|---|---|---|---|---|---|---|---|---|
| Volobe Hydroelectric Power Station | Ambodilazana | water power | 120 MW | 2027 | Compagnie générale d’hydroélectricité de Volobe (CGHV)[3] |
Proposed
| Hydroelectric station | Community | Coordinates | River | Type | Name of reservoir | Capacity (MW) | Year completed |
|---|---|---|---|---|---|---|---|
| Antetezambato Central[4] | Ambatofinandrahana District | ?? | Gravity | 140 MW[5] | (projected) | ||
| Sahofika Hydroelectric Power Station[6] | Sahofika | Onive River | Gravity | Sahofika Reservoir | 205 MW[6] | 2024 (Expected) | |
| Antananarivo Mixed Hydrosolar Power Station[7] | Antananarivo | Run of river | N/A | 35 MW[7] | 2026 (Expected) | ||
| Ranomafana Hydroelectric Power Station | Ranomafana (95 km northwest of Antananarivo)[8] | -18°36’35.9S,47°1’13.27 E | Ikopa River[9] | Gravity | 2x32MW = 64 MW[10] | 202? (Expected) | |
Thermal
Operational
| Thermal power station | Community | Coordinates | Fuel type | Capacity | Year completed | Name of Owner | Notes |
|---|---|---|---|---|---|---|---|
| Ambohimanambola Thermal power station | Ambohimanambola[11] | Heavy fuel oil | 105 MW[12] (7x15 MW) | 2024 | Jirama (state financed) | | ||
| Mandroseza Power Plant | Antananarivo | Heavy fuel oil | 40 MW[13] | 202? | Symbion Power Mandroseza SA[14] | ||
| Noor I Thermal Power Station[13] | Antananarivo | Heavy fuel oil | 48 MW[13] | 2018 | Jovena | ||
| Noor II Thermal Power Station[13] | Antananarivo | Heavy fuel oil | 28 MW[13] | 2018 | Jovena | ||
| Andaingo Thermal Power Station[15] | Andaingo | Biomass | 75 MW[15] | 2012 | CIRAD | ||
Solar
| Solar power station | Community | Coordinates | Fuel type | Capacity | Year completed | Name of Owner | Notes |
|---|---|---|---|---|---|---|---|
| Ambatolampy Solar Power Station | Ambatolampy | Solar | 40 MW | April 2022 | Ambatolampy Solar Consortium | ||
| Access Solar Power Station[16] | Antananarivo | Solar | 25 MW[16] | 2025 Expected | Access Power | ||
| Centrale Solaire d’Andranotakatra | Belobaka, Mahajanga II[17] | 12 MW Solar central | Solar | 1.25 MW | 2022 | ||
| Centrale Solaire d’Ambavahadinilakaka (Ihorombe) | Ambavahadinilakaka[18] | 470 kW Solar central | Solar | 470 kW | 2022 | Maherlla | |
| Sambava Solar Power Station | Sambava[19] | Solar | 500 kW | March 2022 | Green Energy Solutions | ||
Hybride
| Solar power station | Community | Coordinates | Fuel type | Capacity | Year completed | Name of Owner | Notes |
|---|---|---|---|---|---|---|---|
| Kimony Solar Hybride Central | Bemanonga, Menabe | Solar + Thermal | 1.4 MW operative, 3MW projected[20] | 2022 (1.4MW operative) | Green Energy Solutions (GES) + Jirama | ||
| Sava Hybride Power Station | Sambava, Antalaha, Vohemar[21] | Solar + Thermal | 8 MW Thermal + 5MW solar | Green Yellow | |||
| Tanambao Verrerie Solar-hybride central | Tanambao Verrerie, Toamasina | Solar + Thermal | 18MW | 2021 | Jirama | ||
| Toliara Centrale Energetique | Besinjaka (Tulear)[22] | Thermal + Solar | 9 MW Thermal + 2.9 MW solar | Filatex Energy | |||
See also
References
- ↑ MADAGASCAR : la centrale hydroélectrique de Farahantsana (28 MW) entre en service
- ↑ commune-rurale-de-tsarazaza
- ↑ Jirama achetera la production de Volobe
- ↑ Centrale d'Antetezambato
- ↑ 2424.mg
- 1 2 Jean Marie Takouleu (26 May 2020). "Madagascar: ADF supports Sahofika hydropower project with a €4 million loan". Paris: Afrik21.africa. Retrieved 16 September 2020.
- 1 2 Boris Ngounou (29 August 2019). "Madagascar: 35 MW hydroelectric power plant in project in Antananarivo". Paris: Afrik21.africa. Retrieved 16 September 2020.
- ↑ La-centrale-hydroelectrique-de-Ranomafana-Ikopa-
- ↑ meh.mg
- ↑ Délestage: quelques années à tenir
- ↑ Nouvelle Centrale Thermique à Ambohimanambola
- ↑ 105 mw plant
- 1 2 3 4 5 Towerco of Madagascar (30 January 2018). "Jovena: Two new 76 MW thermal power stations planted" (Translated from the original French language). Antananarivo: Towerco of Madagascar. Retrieved 15 September 2020.
- ↑ Symbion
- 1 2 CIRAD (April 2013). "Decentralized rural electricity distribution: the first thermal power station using biomass in Madagascar". Paris: CIRAD. Retrieved 16 September 2020.
- 1 2 Access Power (September 2020). "Access Power: Our Projects In Madagascar". Dubai: Access Power. Retrieved 16 September 2020.
- ↑ Rajoelina a Boeny
- ↑ HAZAVANA HO AN’NY REHETRA POUR LA COMMUNE D’IHOSY
- ↑ www.egedec.com
- ↑ centrale-solaire-hybride-de-Morondava
- ↑ PV Magazine
- ↑ Energie à Toliara
External links
- Mini-Grid Market Opportunity Assessment: Madagascar As of March 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.