This is a list of solar farms in Queensland. There has been significant growth in this area recently, with an estimated 17298 MW of solar capacity either operational, planned or under construction.[1]
Table
Project name | Sponsoring company | Coordinates | Capacity (MW) (AC) | Status | Notes |
---|---|---|---|---|---|
Daydream Solar Farm[2] | Edify Energy | 20°29′41″S 147°44′49″E / 20.494622°S 147.746973°E | 150 | Operating | 180 MW DC capacity. Started Commercial Operations in August 2018. Originally developed by Solar Choice [3][4] |
Sun Metals Solar Farm[5] | Sun Metals | 19°26′13″S 146°41′46″E / 19.437°S 146.696°E | 124 | Operating | 124 MW AC capacity.[6] Started exporting to the grid in May 2018.[7] |
Ross River Solar Farm[8] | Palisade | 19°25′30″S 146°42′58″E / 19.425°S 146.716°E | 128 | Operating | Started exporting to the grid in September 2018. |
Darling Downs Solar Farm | APA Group | 27°06′43″S 150°52′55″E / 27.112°S 150.882°E | 110 | Operating | Started exporting to the grid in September 2018. |
Clare Solar Farm[9] | Fotowatio Renewable Ventures | 19°50′24″S 147°12′40″E / 19.840°S 147.211°E | 100[9] | Operating | Started exporting to the grid in May 2018.[9] |
Emerald Solar Park | RES Group | 23°30′36″S 148°08′17″E / 23.510006°S 148.137953°E | 68 | Operating | Started exporting to the grid in October 2018. |
Hamilton Solar Farm | Wirsol and Edify Energy | 20°29′40″S 147°46′17″E / 20.494401°S 147.771521°E | 57.5 | Operating | Started exporting to the grid in March 2018.[10] |
Hayman Solar Farm | Edify Energy | 20°29′41″S 147°44′55″E / 20.494683°S 147.748475°E | 50 | Operating | Started Commercial Operations in August 2018.[11] |
Whitsunday Solar Farm | Wirsol and Edify Energy | 20°30′17″S 147°46′03″E / 20.504823°S 147.767454°E | 57.5 | Operating | Started exporting to the grid in March 2018.[12] |
Kidston Solar Project KS1 | Genex Power | 18°52′48″S 144°09′04″E / 18.880°S 144.151°E | 50 | Operating | 50 MW Stage started exporting to the grid in November 2017.[13] |
Kidston Solar Project KS2 | Genex Power | 18°53′02″S 144°07′26″E / 18.884°S 144.124°E | 270 | Announced | EPBC Approval Pending 11 January 2019, Referral Number 2018/8229.[14] |
Aldoga Solar Farm | Acciona Australia | 23°48′04″S 151°03′14″E / 23.801°S 151.054°E | 265 | Approved | Construction aims to start in early-mid 2022.[15] EPBC Approval 25 September 2018 (EPBC Referral 2018/8251) |
Aramara Solar Farm | 25°34′19″S 149°51′14″E / 25.572°S 149.854°E | 140 | Approved | [16] | |
Baralaba Solar Farm | Fotowatio Renewable Ventures | 24°11′42″S 152°19′44″E / 24.195°S 152.329°E | 92 | Announced | [17] |
Barunggam Solar Farm | Ubergy | 26°41′06″S 150°45′54″E / 26.685°S 150.765°E | 140 | Announced | Site location in cited article believed incorrect. Coordinates provided +/- 3 km accuracy [18] |
Beelbee Solar Farm | APA Group | 27°08′42″S 150°49′26″E / 27.145°S 150.824°E | 150+ | Approved | 150-240 MW Planned.[19] |
Baking Board Solar Farm | Impact Investment Group | 26°43′23″S 150°33′11″E / 26.723°S 150.553°E | 19.9 | Operating | |
Barcaldine RC Solar Farm | Elecnor | 23°32′49″S 145°19′05″E / 23.547°S 145.318°E | 20 | Operating | A further 40 MW proposed[20] |
Blackwater Solar Farm | Blackwater Solar Farm Pty Ltd | 23°35′49″S 148°45′11″E / 23.597°S 148.753°E | 150 | Approved | Approved 11 Aug 2017[21] |
Blair Athol Solar Power Station | TerraCom Limited | 22°41′28″S 147°32′31″E / 22.691°S 147.542°E | 60 | Announced | [22] |
Blue Grass Solar Farm | X-Elio Australia Pty Ltd | 26°40′48″S 150°29′35″E / 26.680°S 150.493°E | 102 | Approved | Decision Notice Nov 2018[23] |
Bluewater Solar Farm | Fotowatio Renewable Ventures | 19°08′42″S 146°29′06″E / 19.145°S 146.485°E | 148 | Announced | EPBC Approval Obtained[24]< |
Bluff Solar Farm | Infigen Energy | 23°35′53″S 149°02′20″E / 23.598°S 149.039°E | 260 | Announced | [25][26] |
Bouldercombe Solar Farm | Eco Energy World | 23°31′30″S 150°29′56″E / 23.525°S 150.499°E | 280 | Approved | [27] |
Bowen Solar Farm | Infigen Energy | 20°04′34″S 148°12′58″E / 20.076°S 148.216°E | 100 | Announced | [28] EPBC Referral reference 2017/8123 pending approvals 2 Nov 2018 |
Brigalow Solar Farm | Impact Investment Group | 27°41′24″S 151°33′50″E / 27.690°S 151.564°E | 34.5 | Approved | [29] |
Broadlea Solar Farm | Eco Energy World | 21°51′43″S 148°10′12″E / 21.862°S 148.170°E | 100 | Approved | [30] |
Bucca Solar Farm | PB Enertec Pry Ltd | 24°56′20″S 152°04′48″E / 24.939°S 152.080°E | 108.8 | Approved | Approved 21 Dec 2018 PD on Line Reference Number 522.2018.108.1[31] |
Bulli Creek Solar Farm | Solar Choice | 28°01′16″S 150°52′41″E / 28.021°S 150.878°E | 2000[32] | Approved | Original developer Solar Choice acquired 100% ownership in June 2021[33] |
Bullyard Solar Farm | EIWA Solar Bundaberg Pry Ltd | 24°56′17″S 152°00′54″E / 24.938°S 152.015°E | 92 | Approved | Approved 8 Nov 2018 PD on Line Reference Number 522.2018.70.1[31] |
Burdekin Solar Farm | Cleangen | 19°52′48″S 147°09′54″E / 19.880°S 147.165°E | 140 | Approved | Approved[34] |
Cameby Solar Farm | X-Elio | 26°40′55″S 150°30′36″E / 26.682°S 150.510°E | 148 | Approved | Approved Nov 2018 [35] |
Cape York Solar Storage | Lyon Group | 15°53′53″S 144°51′25″E / 15.898°S 144.857°E | 55 | Approved | Approved July 2017 [36] |
Chewco Solar Energy Farm | Tilt Renewables | 17°02′49″S 145°23′02″E / 17.047°S 145.384°E | 75 | Announced | Fact Sheet August 2017[37] |
Childers Solar Farm | Elliot Green Power | 25°18′11″S 152°24′11″E / 25.303°S 152.403°E | 56 | Operating | 56 MW AC, 75 MW DC.[38] Started exporting to the grid in March 2019.[39][40] |
Childers DDN Green Solar Farm | DDN Green | 24°55′23″S 152°17′38″E / 24.923°S 152.294°E | 42 | Announced | Development Application lodged 23 October 2018 PD on Line Reference Number 522.2017.88.1[31] |
Chinchilla Solar Farm | First Solar | 26°40′12″S 150°47′35″E / 26.670°S 150.793°E | 100 | Approved | [41] |
Clarke Creek Wind and Solar Farm | Lacour Energy | 22°39′22″S 149°20′49″E / 22.656°S 149.347°E | 400 | Approved | [42][43] |
Clermont Solar Farm | Wirsol | 22°50′20″S 147°34′52″E / 22.839°S 147.581°E | 75 | Operating | Started exporting to the grid in June 2019.[44][45] |
Cloncurry (Solarvoltaic) Solar Farm | Infigen Energy | 20°42′22″S 140°30′32″E / 20.706°S 140.509°E | 30 | Announced | [46] |
Collinsville Solar PV | Ratch Australia | 20°32′17″S 147°48′25″E / 20.538°S 147.807°E | 42.5 | Operating | [47] |
Comet Solar Farm | Hadstone Energy /Comet Solar Farm Pty Ltd | 23°36′47″S 148°46′12″E / 23.613°S 148.770°E | 235 | Approved | Due to commission on 30 November 2018.[48][49] |
Columboola Solar Farm | Luminous Energy | 26°38′10″S 150°17′46″E / 26.636°S 150.296°E | 310 | Approved | [50] |
Crinum Creek Solar Farm | Adani | 23°01′52″S 148°20′24″E / 23.031°S 148.340°E | 100 | Announced | GMUSG-SACOME-Conference Aug 2016 [51] |
Dalby Solar Farm RES | RES | 27°12′29″S 151°18′29″E / 27.208°S 151.308°E | 22 | Approved | [52] |
Daystar Energy Solar Farm | Daystar Energy | 26°38′35″S 150°17′24″E / 26.643°S 150.290°E | 100 | Approved | Decision Notice Oct 18 [53] |
Delga Solar Farm | Shell | 26°16′26″S 149°44′56″E / 26.274°S 149.749°E | 250 | Approved | [54] |
Desailly Renewable Energy Park | DP Energy | 16°29′17″S 145°23′02″E / 16.488°S 145.384°E | 250 | Announced | Development Application Lodged[55] project web site[56] |
Dingo Solar Farm | ESCO Pacific | 23°38′02″S 149°22′59″E / 23.634°S 149.383°E | 85 | Announced | [57] |
Dunblane Solar Farm | YD Projects | 23°32′25″S 145°16′31″E / 23.540294°S 145.275339°E | 11 | Operating | [58] |
Dysart Solar Energy Farm | Tilt Renewables | 22°34′44″S 148°22′05″E / 22.579°S 148.368°E | 150 | Approved | [59][60] Project Approval[61] |
Dysart Solar Farm | Hanwha | 22°30′50″S 148°30′14″E / 22.514°S 148.504°E | 130 | Announced | |
Edenvale Solar Farm | Edenvale Solar Park Pty Ltd | 26°55′55″S 150°34′59″E / 26.932°S 150.583°E | 280 | Approved | [62] |
Ewerleigh Solar Farm | Everleigh Solar Park Pty Ltd | 26°54′47″S 150°35′10″E / 26.913°S 150.586°E | 150 | Approved | [62] Decision Notice[63] Project and Owner name are correct |
Gooburrum Solar Farm | PB Enertec Pry Ltd | 24°48′25″S 152°19′08″E / 24.807°S 152.319°E | 4 | Approved | Approved 15 Dec 2017 PD on Line Reference Number 522.2017.26.1[31] |
Gregory Solar Farm | Engie Renewables Australia | 23°08′35″S 148°26′49″E / 23.143°S 148.447°E | 215 | Approved | [64] |
Gumlu Solar Farm | RJ Gordon Solar Consultants | 19°52′16″S 147°40′05″E / 19.871°S 147.668°E | 60 | Announced | [65] |
Gympie Regional Energy Hub | SolarQ | 26°05′38″S 152°26′35″E / 26.094°S 152.443°E | 350 | Approved | 350 MW approved, 1000 MW additional in planning.[66] |
Harlin Solar Farm | Sunshine Energy | 26°56′53″S 152°24′36″E / 26.948°S 152.410°E | 1500 | Under construction | Construction began in February 2019. There are plans to add a 500MWh battery storage facility.[67][68] |
Haughton Solar Farm | Pacific Blue | 19°43′52″S 147°04′23″E / 19.731°S 147.073°E | 100 | Operating | First 100 MW Stage began exporting to the grid in June 2019.[44][69] It is believed the other stages have not begun construction.[70][71] |
Hughenden Sun Farm | Lighthouse Solar | 20°51′14″S 144°11′10″E / 20.854°S 144.186°E | 22.5 | Operating | Construction started in September 2017 and production commenced in September 2018.[72] |
Kelsey Creek Solar Farm | KCSF Consortium | 20°26′56″S 148°32′20″E / 20.449°S 148.539°E | 50 | Announced | [73] |
Kennedy Energy Park | Windlab / Eurus | 20°56′06″S 144°18′54″E / 20.935°S 144.315°E | 15 | Under construction | First 15 MW stage commenced. Further 650 MW stage has not begun as of November 2018.[74] |
Kingaroy Solar Farm | Terrain Energy | 26°32′17″S 151°53′10″E / 26.538°S 151.886°E | 40 | Announced | Development approval refused 23 Nov 2018, appeal lodged against Council decision and pending[75] |
Koberinga Solar Farm | ESCO Pacific | 19°49′34″S 147°31′37″E / 19.826°S 147.527°E | 55 | Announced | [76] |
Lakeland Solar Farm | Conergy Australia, now rebranded as Blueleaf Energy | 15°52′05″S 144°51′43″E / 15.868°S 144.862°E | 10.8 | Operating | [77] |
Lilyvale Solar Farm | Fotowatio Renewable Ventures | 23°04′12″S 148°25′23″E / 23.070°S 148.423°E | 100 | Operating | Started exporting to the grid in March 2019.[78][79] |
Longreach Solar Farm | Canadian Solar | 23°27′00″S 144°21′42″E / 23.44993°S 144.361703°E | 15 | Operating | [80] |
Majors Creek Solar Farm | Edify | 19°34′55″S 146°51′43″E / 19.582°S 146.862°E | 200 | Announced | EPBC Approval 20 July 2017 EPBC Reference 2017/7963[81] Town planning report[82] |
Mareeba Solar Farm | CleanGen | 16°00′00″S 145°24′00″E / 16.000°S 145.400°E | 60 | Approved | [83] |
Mica Creek Solar Farm | APA Group | 20°48′37″S 139°29′37″E / 20.81027°S 139.49365°E | 88 | Operating | [84] |
Middlemount Solar Farm | Overland | 22°49′26″S 148°43′23″E / 22.824°S 148.723°E | 28 | Operating | [85] [86] |
Mirani Solar Farm | ESCO Pacific | 21°08′46″S 148°49′48″E / 21.146°S 148.830°E | 60 | Approved | [87] |
Moura Solar Farm | ESCO Pacific | 24°30′50″S 150°05′02″E / 24.514°S 150.084°E | 110 | Announced | [88] |
Munna Creek Solar Farm | Renewable Energy System Technologies | 25°53′31″S 152°28′08″E / 25.892°S 152.469°E | 120 | Approved | [89] |
Normanton Solar Farm | Scouller Energy | 17°40′52″S 141°03′00″E / 17.681°S 141.050°E | 5 | Operating | [90] |
Oakdene Solar Farm | juwi | 26°42′36″S 150°43′30″E / 26.710°S 150.725°E | 100 | Announced | [91] Development approval subject to appeal Mar 2019 |
Oakey Solar Farm | Canadian Solar Australia / RE Oakey | 27°24′26″S 151°39′39″E / 27.407166°S 151.660702°E | 25 | Operating | Oakey 1 (25MW) started exporting to the grid in March 2019.[92]
Oakey 2 (55MW) has not started exporting to the grid as of July 2019.[93] |
Paget Solar Farm | BOMA Group | 21°11′24″S 149°09′54″E / 21.190°S 149.165°E | 20 | Announced | [94] |
Qunaba Solar Farm | PB Enertec Pry Ltd | 24°54′04″S 152°26′10″E / 24.901°S 152.436°E | 77 | Approved | Approved 21 Dec 2018 PD on Line Reference Number 522.2018.113.1[31] |
Raglan Solar Farm | Eco Energy World | 23°45′29″S 150°51′00″E / 23.758°S 150.850°E | 350 | Approved | [95] |
Rodds Bay Solar Farm | Renew Estate | 24°11′20″S 151°35′06″E / 24.189°S 151.585°E | 250[96] | Approved | [97] |
Rolleston Solar Farm | RES Group | 24°23′46″S 148°28′23″E / 24.396°S 148.473°E | 90 | Approved | [98] |
Rollingstone Solar Farm | ESCO Pacific | 19°00′47″S 146°24′25″E / 19.013°S 146.407°E | 110 | Approved | [99] |
Rugby Run Solar Farm | Adani Australia | 22°05′02″S 147°52′12″E / 22.084°S 147.870°E | 65 | Operating | Started exporting to the grid in May 2019.[71][100] |
Susan River Solar Farm | Elliot Green Power | 25°25′01″S 152°44′38″E / 25.417°S 152.744°E | 75 | Operating | 75 MW AC, 95 MW DC.[38] Started exporting to the grid in December 2018.[101] Officially opened in February 2019.[102][103] |
Sunshine Coast Solar Farm | Sunshine Coast Regional Council | 26°33′36″S 153°01′34″E / 26.560°S 153.026°E | 15 | Operating | [104] |
Tieri Solar Farm | Fotowatio Renewable Ventures | 23°05′46″S 148°02′42″E / 23.096°S 148.045°E | 96 | Approved | [105] |
Wandoan Solar Project | Equis | 26°14′53″S 149°45′50″E / 26.248°S 149.764°E | 1000 | Approved | [106] |
Warhook Solar Project | Engie Renewables Australia | 26°36′43″S 150°15′32″E / 26.612°S 150.259°E | 200 | Approved | [107][108] |
Warwick Solar Farm | University of Queensland | 28°11′20″S 152°03′36″E / 28.189°S 152.060°E | 64 | Operating | Construction started in April 2019.[109][110][111] |
Western Downs Green Power Hub | Neoen | 26°57′18″S 150°40′37″E / 26.955°S 150.677°E | 460[112] | Under construction | Paired with 200 MW/400 MWh of battery storage.[113][114] |
Western Downs Solar Farm | Tilt Renewables | 26°56′13″S 150°42′25″E / 26.937°S 150.707°E | 250 | Announced | [115] |
Woolooga Energy Park | LGI Limited | 26°04′34″S 152°29′13″E / 26.076°S 152.487°E | 185 | Announced | [116] |
Yarranlea Solar Farm | Risen | 27°42′27″S 151°31′37″E / 27.7074°S 151.527°E | 100 | Operating | Construction started 23 July 2018[117] |
Summary of capacity
Status | Capacity (MW) |
---|---|
Operating | 1609.5 |
Under construction | 1726.9 |
Approved | 7904.3 |
Announced | 2852 |
Total | 14092.7 |
References
- ↑ "Electricity generation map". maps.dnrm.qld.gov.au. Queensland Department of Energy and Water Supply. Retrieved 26 November 2018.
- ↑ "Daydream Solar Farm". Edify Energy. Retrieved 13 November 2018.
- ↑ "Whitsunday Solar Farm hub helicopter flyover [Video & Photos]". 19 June 2018.
- ↑ "Daydream Solar Farm". Edify Energy. Retrieved 26 November 2018.
- ↑ "Queensland's biggest solar farm starts generating to grid". RenewEconomy. 31 May 2018. Retrieved 27 July 2018.
- ↑ "Sun Metals Solar Farm". Archived from the original on 27 July 2018. Retrieved 26 November 2018.
- ↑ "Queensland's biggest solar farm starts generating to grid". RenewEconomy. 31 May 2018. Retrieved 26 November 2018.
- ↑ "The Project". Ross River Solar Farm. Retrieved 27 September 2018.
- 1 2 3 "Renewables flow for Queensland". pv magazine Australia. Retrieved 13 June 2018.
- ↑ "Hamilton Solar Farm". Edify Energy. Retrieved 26 November 2018.
- ↑ "Hayman Solar Farm". Edify Energy. Retrieved 26 November 2018.
- ↑ "Whitsunday Solar Farm". Edify Energy. Retrieved 26 November 2018.
- ↑ "50 MW Kidston Solar Project". Genex Power Limited. Retrieved 26 November 2018.
- ↑ "50 MW Kidston Solar Project". EPBC. Retrieved 11 January 2019.
- ↑ "Aldoga Solar Farm". www.acciona.com.au. Retrieved 26 November 2021.
- ↑ "Aramara Solar Farm". AltEnergy. Retrieved 27 November 2018.
- ↑ "Home - FRV Baralaba Farm". FRV Baralaba Farm. Retrieved 27 November 2018.
- ↑ "Alt energy project update" (PDF). AltEnergy. Retrieved 18 January 2019.
- ↑ "Beelbee Solar Farm". AltEnergy. Retrieved 27 November 2018.
- ↑ "Barcaldine Remote Community Solar Farm" (PDF). Elecnor Australia. Retrieved 21 January 2019.
- ↑ "ECHDC Development Register" (PDF). CHRC. Retrieved 21 January 2019.
- ↑ "Blair Athol – 60 MW Solar Power Station Plans" (PDF). Retrieved 27 November 2018.
- ↑ "WRRC Decision Notice" (PDF). Retrieved 17 January 2019.
- ↑ "EPBC Approval". Retrieved 10 January 2019.
- ↑ "Bluff Solar Farm". AltEnergy. Retrieved 27 November 2018.
- ↑ "Bluff Solar Farm" (PDF) (Planning Report (Final)). Retrieved 16 January 2019.
- ↑ "Bouldercombe Solar Farm". AltEnergy. Retrieved 29 November 2018.
- ↑ "Bowen Solar Farm". AltEnergy. Retrieved 29 November 2018.
- ↑ "Brigalow Solar Farm". Impact. Retrieved 18 January 2019.
- ↑ "Broadlea Solar Farm". AltEnergy. Retrieved 29 November 2018.
- 1 2 3 4 5 "PD On line". BRC. Retrieved 21 January 2019.
- ↑ "Projects". www.firstsolar.com. 15 June 2021. Retrieved 16 June 2021.
- ↑ "Bulli Creek Solar Farm". Solar Choice. 15 June 2021. Retrieved 16 June 2021.
- ↑ "Burdekin solar project approved". CleanGen. Retrieved 21 January 2019.
- ↑ "WDRC Press Release". WDRC. Retrieved 18 January 2019.
- ↑ "Cape York Solar Storage - Lyon Group". Lyon Group. Retrieved 30 November 2018.
- ↑ "Chewko Solar Energy Farm Fact Sheet" (PDF). Static1. August 2017. Archived from the original (PDF) on 23 January 2019. Retrieved 23 January 2019.
- 1 2 "Elliott Green Power". Retrieved 19 April 2021.
- ↑ "Solar Energy in Australia | March 2019 | Aneroid". anero.id. Retrieved 30 June 2019.
- ↑ "Childers Solar Farm". AltEnergy. Retrieved 30 November 2018.
- ↑ "Projects". www.firstsolar.com. Retrieved 30 November 2018.
- ↑ "Contractor and Employment Register". Clarke Creek Wind and Solar Farm. Retrieved 30 November 2018.
- ↑ "Isaac Regional Council". IRC. Retrieved 16 January 2019.
- 1 2 "Solar Energy in Australia | June 2019 | Aneroid". anero.id. Retrieved 30 June 2019.
- ↑ "Clermont Solar Farm". WIRSOL. 8 March 2018. Retrieved 30 November 2018.
- ↑ "Development Pipeline". infigenenergy.com. Retrieved 23 January 2019.
- ↑ "Collinsville North Solar Farm". AltEnergy. Retrieved 30 November 2018.
- ↑ "Comet Solar Farm". POWER PLANTS. Retrieved 30 November 2018.
- ↑ "Hadstone's 309 MWp "Comet" Solar Farm approved in Queensland". www.linkedin.com. Retrieved 30 November 2018.
- ↑ "Columboola Solar Farm". AltEnergy. Retrieved 30 November 2018.
- ↑ "Adani presentation" (PDF). wcci. Retrieved 23 January 2019.
- ↑ "RES Group". RES. Retrieved 21 January 2019.
- ↑ "Decision Notice" (PDF). WDRC. WDRC. Retrieved 17 January 2019.
- ↑ "Delga Solar Farm". AltEnergy. Retrieved 30 November 2018.
- ↑ "Desailly Renewable Energy Park" (PDF). MSC. Retrieved 23 January 2019.
- ↑ "Desailly Solar Queensland". DP Energy. Retrieved 23 January 2019.
- ↑ "Dingo Solar Farm". dingosolarfarm.com.au. Retrieved 30 November 2018.
- ↑ "New 11MW solar farm sets new benchmarks in Queensland". RenewEconomy. Retrieved 21 January 2019.
- ↑ "Dysart Solar Farm". Tilt Renewables. Retrieved 30 November 2018.
- ↑ "Dysart Solar Farm". AltEnergy. Retrieved 30 November 2018.
- ↑ "Notice about decision - Statement of reasons" (PDF). IRC. Isaac Regional Council. 20 December 2017. Retrieved 16 January 2019.
- 1 2 "Press Release WDRC". WDRC. Retrieved 30 November 2018.
- ↑ "Decision Notice" (PDF). WDRC. Retrieved 17 January 2019.
- ↑ "Gregory Solar Farm". AltEnergy. Retrieved 10 January 2019.
- ↑ "Gumlu solar farm proposal". North Queensland Register. Retrieved 23 January 2019.
- ↑ "SQ1 GREH – Gympie Regional Energy Hub – Lower Wonga". SolarQ. Retrieved 30 November 2018.
- ↑ "1.5 GW solar, 500 MWh battery project breaks ground in Queensland". pv magazine Australia. Retrieved 19 July 2019.
- ↑ "Sunshine Energy Projects". Sunshine Energy. Retrieved 18 January 2019.
- ↑ "Haughton solar farm". Pacific Blue. Retrieved 7 June 2023.
- ↑ "Haughton Solar Farm Project" (PDF). Retrieved 1 July 2019.
- 1 2 Parkinson, Giles (29 May 2019). "Two new solar farms connect to the grid in Queensland". RenewEconomy. Retrieved 30 June 2019.
- ↑ "Hughenden Sun Farm". POWER PLANTS. Retrieved 30 November 2018.
- ↑ "Technology". www.kcsf.com.au. Retrieved 30 November 2018.
- ↑ "Kennedy Energy Park". kennedyenergypark.com.au. Retrieved 30 November 2018.
- ↑ "Northern Star". northernstar.com.au. Retrieved 18 January 2019.
- ↑ "Koberinga Solar Farm". koberingasolarfarm.com.au. Retrieved 30 November 2018.
- ↑ "Lakeland Solar Farm". POWER PLANTS. Retrieved 30 November 2018.
- ↑ Parkinson, Giles (12 March 2019). "Lilyvale is latest large scale solar farm to begin production in Queensland". RenewEconomy. Retrieved 30 June 2019.
- ↑ "Home - Lilyvale Solar Farm". Lilyvale Solar Farm. Retrieved 30 November 2018.
- ↑ "longreach solar farm". longreach solar farm. Retrieved 21 January 2019.
- ↑ "EPBC Referral List". epbc. Retrieved 23 January 2019.
- ↑ "TCC DA" (PDF). TCC. Retrieved 23 January 2019.
- ↑ "Mareeba Secures permit". cleangen.com.au. Retrieved 21 January 2019.
- ↑ "Mica Creek Solar Farm". apa.com.au. Retrieved 28 June 2023.
- ↑ "Middlemont Sun Farm". overlandsunfarming.com.au. Retrieved 21 January 2019.
- ↑ "MMiddlemount solar farm". gem.wiki. Retrieved 28 June 2023.
- ↑ "Mirani Solar Farm". miranisolarfarm.com.au. Retrieved 30 November 2018.
- ↑ "Moura Solar Farm". mourasolarfarm.com.au. Retrieved 21 January 2019.
- ↑ "Munna Creek Solar Farm". POWER PLANTS. Retrieved 30 November 2018.
- ↑ "Normanton Solar Farm". normantonsolarfarm. Retrieved 21 January 2019.
- ↑ "Council Meeting Minutes". WDRC. Retrieved 26 March 2019.
- ↑ Parkinson, Giles (15 March 2019). "Oakey solar farm begins production, second new plant in a week in Queensland". RenewEconomy. Retrieved 30 June 2019.
- ↑ "OAKEY". oakeysolarfarm.com.au. Retrieved 30 November 2018.
- ↑ "Daily Mercury". dailymercury.com.au. Retrieved 23 January 2019.
- ↑ "Raglan Solar Farm". AltEnergy. Retrieved 30 November 2018.
- ↑ "Rodds Bay Solar Farm". WIRSOL. 8 March 2018. Retrieved 19 July 2019.
- ↑ "Rodds Bay Solar Farm". www.roddsbaysolarfarm.com. Retrieved 21 January 2019.
- ↑ "Project Summary". Rolleston Solar Farm. Retrieved 30 November 2018.
- ↑ "Rollingstone Solar Farm". rollingstonesolarfarm.com.au. Retrieved 30 November 2018.
- ↑ "Adani Australia". www.adaniaustralia.com. Retrieved 30 November 2018.
- ↑ "Solar Energy in Australia | December 2018 | Aneroid". anero.id. Retrieved 30 June 2019.
- ↑ Parkinson, Giles (5 February 2019). "Elliott Green Power opens Susan River solar farm, two more being built". RenewEconomy. Retrieved 30 June 2019.
- ↑ "Susan River Solar Farm". POWER PLANTS. Retrieved 30 November 2018.
- ↑ "Solar Farm overview". scrc. Retrieved 23 January 2019.
- ↑ "Tieri Solar Farm". reneweconomy.com.au. Retrieved 23 January 2019.
- ↑ "Wandoan Solar Project". WDRC decision notice. Retrieved 10 January 2019.
- ↑ "Warhook Solar Project" (PDF). WDRC decision notice. Retrieved 10 January 2019.
- ↑ "Warhook Solar Farm". ENGIE Australia and New Zealand. Retrieved 19 July 2019.
- ↑ Vorrath, Sophie (18 April 2019). "Work begins on Warwick solar farm – UQ's ticket to 100% renewables". RenewEconomy. Retrieved 1 July 2019.
- ↑ "Warwick Solar Farm". UQ. Retrieved 18 January 2019.
- ↑ "Warwick Solar Farm". terrainsolar. Retrieved 24 August 2021.
- ↑ webk. "Western Downs Green Power hub". Retrieved 19 July 2019.
- ↑ "Western Downs Green Power Hub". AltEnergy. Retrieved 30 November 2018.
- ↑ "Western Downs Green Power hub". westerndownsgreenpowerhub.com.au. Retrieved 30 November 2018.
- ↑ "Western Downs Solar Farm". Tilt Renewables. Retrieved 30 November 2018.
- ↑ "Home". Woolooga Energy Park. Retrieved 30 November 2018.
- ↑ "Home". Yarranlea. Retrieved 18 January 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.