| Taihe 太和  | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
|  Platform | |||||||||||
| Chinese name | |||||||||||
| Simplified Chinese | 太和站 | ||||||||||
| Traditional Chinese | 太和站 | ||||||||||
| 
 | |||||||||||
| General information | |||||||||||
| Location | Guangcong Highway (G105), Dali Road, Kequan Road, Baiyun District, Guangzhou, Guangdong China | ||||||||||
| Operated by | Guangzhou Metro Co. Ltd. | ||||||||||
| Line(s) | Line 14 | ||||||||||
| Platforms | 2 (1 island platform) | ||||||||||
| Tracks | 4 | ||||||||||
| Construction | |||||||||||
| Structure type | Underground | ||||||||||
| Accessible | Yes | ||||||||||
| Other information | |||||||||||
| Station code | 14 04 | ||||||||||
| History | |||||||||||
| Opened | 28 December 2018 | ||||||||||
| Services | |||||||||||
| 
 | |||||||||||
Taihe station (Chinese: 太和站), is a station of Line 14 of the Guangzhou Metro. It started operations on 28 December 2018.[1]
The station has an underground island platform. Platform 1 is for trains heading to Dongfeng, whilst platform 2 is for trains heading to Jiahewanggang, along with 2 bypass tracks next to the stopping tracks.
Exits
There are 4 exits, lettered A, C, D and E. Exit E is accessible. All exits are located on Guangcong No. 3 Road.
Gallery
 Concourse Concourse
 Concourse culture wall artwork Concourse culture wall artwork
 Exit A Exit A
 Exit C Exit C
 Exit D Exit D
 Exit E Exit E
References
- ↑ "Line 14 Service Time". Guangzhou Metro. Guangzhou Metro. Retrieved 31 December 2017.
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.