Orenstein & Koppel CSÉT Shunting Locomotives
Thurles No. 1 at Downpatrick in 2014
Type and origin
Power typeSteam
BuilderOrenstein & Koppel
Build dateFirst 6, 1934; Latter 3, 1935
Total produced9
Specifications
Configuration:
  Whyte0-4-0T+WT
Gauge5 ft 3 in (1,600 mm)
Career
OperatorsComlucht Siúcre Éireann Teoranta
Numbers1, 2 & 3 (One locomotive of each number per factory)
NicknamesSugarpuffs, O&K's
Withdrawn1950s-1960s
PreservedThurles No.1, Mallow No. 3
DispositionTwo preserved, remainder scrapped

The O&K CSÉT Shunting Locomotives were a class of nine small Irish steam locomotives built in Berlin, Germany, by Orenstein & Koppel for shunting wagons of sugar beet at the three Irish Sugar Company (Comlucht Siúcre Éireann) factories in Mallow, Thurles and Tuam. (There was another factory at Carlow, but it used vertical-boilered Belgian locomotives.)[1] They were delivered in two batches, with the first six arriving in 1934 and the last three in 1935.[2] The 1934 batch was paid for by barter, using cattle as payment.[3] Each factory received three locomotives, and numbered them independently, leading to each factory having a No. 1, a No. 2 and a No. 3. Each factory applied their own design of number onto the tanks, and in some cases, bufferbeams, of their respective locomotives.

History

There was no official class designation, but in preservation they have gained the nicknames Sugarpuffs, due to their small size and careers in the sugar industry, and O&Ks, which is the acronym of their manufacturer. Withdrawals and scrapping of most of the locomotives took place during the 1960s, with only Thurles No. 1 and Mallow No. 3 surviving. The latter locomotive was the last steam locomotive to be in service in the Republic of Ireland for the famous sugar beet campaign, as CIÉ's dieselisation programme was complete by this point, 1963.

The locomotives were easy to recognise in Ireland thanks to their diminutive size and European characteristics - which included a sandbox on top of the boiler, and a funnel-shaped chimney which allowed for the potential fitting of a spark arrestor for wood-burning. Unusually, they also have a well tank in addition to two side tanks.[4]

Table of locomotives
Running NumberWorks NumberOriginal FactoryBuiltFate
112473MallowOrenstein & Koppel, Berlin, 1934Scrapped
212474MallowOrenstein & Koppel, Berlin, 1934Scrapped
312662MallowOrenstein & Koppel, Berlin, 1935Preserved
112475ThurlesOrenstein & Koppel, Berlin, 1934Preserved
212476ThurlesOrenstein & Koppel, Berlin, 1934Scrapped
312663ThurlesOrenstein & Koppel, Berlin, 1935Scrapped
112478TuamOrenstein & Koppel, Berlin, 1934Scrapped
212477TuamOrenstein & Koppel, Berlin, 1934Scrapped
312664TuamOrenstein & Koppel, Berlin, 1935Scrapped

In Preservation

Preserved O&Ks 1 and 3 stored at Ballynahinch Junction in 1983.

Two locomotives are preserved, No. 1 of Thurles, and No. 3 of Mallow, both at the Downpatrick and County Down Railway. After being displaced by Ruston Hornsby diesels,[5] Nos. 1 and 3, as well as Thurles No. 2, were purchased for preservation in England and moved to Dalkey, Dublin in 1974. They remained there until 1977, when CIÉ required the siding they occupied. CIÉ offered a disused bus garage at the former MGWR Broadstone station to the locomotives as a replacement home, but this necessitated transport by lorry through Dublin. To cover the costs of this, No. 2 was sold to a scrap merchant, where she languished for several years as her new owners, reluctant to cut her up, tried to find a buyer. Despite their best efforts, no buyer was found and she was scrapped in 1978. That same year, Nos. 1 & 3 were moved by road from Broadstone to the former site of Ballynahinch Junction railway station, and it was here that their owner finally realised that the gauge in Ireland was substantially wider than that of Great Britain, thus rendering the locomotives useless to him.[6]

They remained in the open at Ballynahinch Junction until 1987 when they were bought by and transported to the Downpatrick and County Down Railway. No. 3 was sent to Whitehead for overhaul in 1997, and upon return to Downpatrick, gave 12 years of service between 2000 and 2012. No. 1 was similarly sent to Whitehead in 2007, returning in 2012 and taking over from No. 3. She is still in service, operating all DCDR passenger trains, with the exception of the occasional diesel special. No. 3's boiler was sent to Whitehead for overhaul in January 2016,[7] returning in early 2017, and on Thursday 24 August the locomotive was reassembled so that testing could start. No. 3 was steamed in her frames for the first time post-overhaul on 19 May 2018, and passed her final boiler inspection on 12 November 2018,[8] releasing her into traffic. Following a final general running test on 24 November 2018, No. 3 was fit for passenger traffic, hauling her first revenue-earning train since overhaul on the night of 22 December 2018.

References

  1. "CSET No. 1". Downpatrick & County Down Railway. Retrieved 16 August 2022.
  2. "CSET No. 3". Downpatrick & County Down Railway. Retrieved 16 August 2022.
  3. "CSET No. 1". Downpatrick & County Down Railway. Retrieved 16 August 2022.
  4. "The Railway Preservation Society of Ireland". www.steamtrainsireland.com. Archived from the original on 4 March 2016. Retrieved 2 May 2016.
  5. "No.1 "Carlow"". www.steamtrainsireland.com. Retrieved 16 August 2022.
  6. Cochrane, Gerry (2009). Back In Steam. Newtownards: Colourpoint. pp. 45–47. ISBN 978-1-906578-29-9. OCLC 520651212.
  7. "Downpatrick & County Down Railway - Home - No. 3's restoration is under way!". www.downrail.co.uk. Retrieved 2 May 2016.
  8. O&K NO. 3 passes her boiler inspection | Monday 12th November 2018 - "It's going to be a good day", they said, albeit with fingers well and truly crossed. O&K No. 3 passed her final boiler... | By Downpatrick and County Down Railway | Facebook, retrieved 16 August 2022
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.