Green Line
Overview
StatusUnder construction
LocaleSurat, Gujarat, India
Termini
  • Bhesan
  • Saroli
Stations18
Service
TypeRapid transit
SystemSurat Metro
Operator(s)Gujarat Metro Rail Corporation Limited
Rolling stockTitagarh Rail Systems[1]
Technical
Line length18.74 km (11.64 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed
  • 80 km/h (50 mph) (Top)
  • 32 km/h (20 mph) (average)
Route map

Bhesan
Botanical Garden
Ugat Varigruh
Palanpur Road
LP Savani School
Performing Art Centre
Adajan Gam
Jagdishchandra Bose Aquarium
Badri Narayan Temple
Athwa Chopati
Majura Gate Subway interchange Red Line (Under construction)
Udhna Darwaja
Kamela Darwaja
Anjana Farm
Model Town
Magob
Bharat Cancer Hospital
Saroli

Line 2 of Surat Metro also known as The Green Line (Line 2) is an under-construction metro rail line of the Surat Metro, a rapid transit system in Surat, in the state of Gujarat, India.

This line consists of 20 metro stations from Bhesan to Saroli with a total distance of 18.74 km. It is expected to be operational by December 2027.[2][3]

List of stations

Following is a list of stations on this route:

Green Line
# Station Name Opening Connections Layout
EnglishGujarati
1BhesanભેસાણUnder constructionNoneElevated
2Botanical Gardenબોટનિકલ ગાર્ડનUnder constructionNoneElevated
3Ugat Varigruhઉગત વરિગૃહUnder constructionNoneElevated
4Palanpur Roadપાલનપુર રોડUnder constructionNoneElevated
5LP Savani Schoolએલ.પી.સવાણી સ્કૂલUnder constructionNoneElevated
6Performing Art Centreપર્ફોર્મિંગ આર્ટ સેન્ટરUnder constructionNoneElevated
7Adajan Gamઅડાજણ ગામUnder constructionNoneElevated
8Jagdishchandra Bose Aquariumજગદીશચંદ્ર બોસ એક્વેરિયમUnder constructionNoneElevated
9Badri Narayan Templeબદરી નારાયણ મંદિરUnder constructionNoneElevated
10Athwa Chopatiઅઠવા ચોપાટીUnder constructionNoneElevated
11Majura Gateમજુરા ગેટUnder constructionRed Line (Under construction)Elevated
12Udhna Darwajaઉધના દરવાજાUnder constructionNoneElevated
13Kamela Darwajaકમેલા દરવાજાUnder constructionNoneElevated
14Anjana Farmઅંજના ફાર્મUnder constructionNoneElevated
15Model Townમોડલ ટાઉનUnder constructionNoneElevated
16MagobમગોબUnder constructionNoneElevated
17Bharat Cancer Hospitalભારત કેન્સર હોસ્પિટલUnder constructionNoneElevated
18SaroliસારોલીUnder constructionNoneElevated

See also

References

  1. PTI (27 June 2023). "Titagarh Rail Systems bags Rs 857 cr order for Surat Metro Rail". ThePrint. Retrieved 27 June 2023.
  2. "Surat Metro phase I to start operations in December 2027 – Check route, distance and stations here". www.financialexpress.com. 13 July 2023. Retrieved 5 September 2023.
  3. "Surat Metro: Phase I to Start Operations in Dec 2027, Check Route, Distance, Stations and More". www.news18.com. 12 July 2023. Retrieved 5 September 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.