HVDC Itaipu
Location
CountryBrazil
Coordinates25°27′58″S 54°32′33″W / 25.46611°S 54.54250°W / -25.46611; -54.54250 (Foz do Iguaçu converter station)
23°40′02″S 47°06′19″W / 23.66722°S 47.10528°W / -23.66722; -47.10528 (Ibiuna converter station)
General directionEast-West
FromItaipu hydroelectric power plan, near Foz do Iguaçu
ToIbiúna, São Paulo
Ownership information
OwnerFurnas Centrais Elétricas S.A. Brazil
Construction information
Manufacturer of substationsABB Group
CommissionedOctober 1984, July 1987
Technical information
Typeoverhead transmission line
Type of currentHVDC
Total length780 km (480 mi)
Power rating6300 MW
AC voltage345 and 500 kV
DC voltage±600 kV
No. of poles2x2
No. of circuits2

The HVDC Itaipu is a High-voltage direct current overhead line transmission system in Brazil from the Itaipu hydroelectric power plant to the region of São Paulo. The project consists of two ±600 kV bipoles, each with a rated power of 3150 MW, which transmit power generated at 50 Hz from the Paraguay side of the Itaipu Dam (near Foz do Iguaçu in Paraná) to the Ibiúna converter station near São Roque, São Paulo. The system was put in service in several steps between 1984 and 1987, and remains among the most important HVDC installations in the world.[1]

When the first bipole was completed in 1985, it became the world's largest HVDC system by both power transmission capacity and voltage, titles which it would hold for 25 years until the completion, in 2010, of the ±800 kV, 6400 MW HVDC link from Xiangjiaba Dam to Shanghai in China. It also contained important innovations in real-time control systems, being one of the first HVDC schemes to use digital control equipment using microprocessors. Nevertheless it suffered reliability problems in its first few years of operation, with numerous converter transformer failures and one serious converter fire, although reliability is now reported to be much improved. [2]

Technical description

High Voltage Direct Current (HVDC) was chosen both because this technique allows long transmission lines with little loss compared to other systems (like AC), and also allows interchange of the Paraguayan 50 Hz input and the Brazilian 60 Hz input and user grid. Both lines operate at ±600 kV and are built as overhead lines with a length of 818 (North line) and 807 (South line) kilometers. Away from their terminal stations, the two lines are at least 10 km apart to reduce risks. Each one is designed for 3150 MW at ± 600 kV D.C. and 2625 A. The lines are 4 x 689 mm² (about 30 mm ∅) ACSR[3]

The incoming supply is 500 kV AC from the 50 Hz generators at the hydro dam (Foz do Iguaçu). The outgoing power is 345 and 500 kV, 60 Hz AC into the South/Southeastern grid (Ibiúna, São Paulo).

The converter equipment, supplied by ABB Group, uses thyristor valves arranged in two, twelve-pulse bridges per pole.

In parallel with the HVDC system, two 765 kV AC lines carry power from the 60 Hz generators on the Brazilian side of the dam to the São Paulo region. At 13 into the route, at Ivaiporã, there is a branch into 500 kV, 60 Hz AC, delivering into the Southern grid. By introducing, in 1989 and later, series capacitors in Ivaiporã (at 13 of the line) and Itaberá (at 23) the capacity grew from 4300 MW to 6300 MW.[4]

Reliability

In its first few years, the project suffered many failures of converter transformers, with six in the first year of commercial operation and twelve in the first four years. Modifications had to be made to all of the transformers on the system, and led to markedly improved performance, with no failures in years 4-10.[2]

On 29 May 1989, a complete quadrivalve in converter 5 of the Foz do Iguaçu converter station was destroyed by a fire which started as a result of a water leakage from a cooling pipe. The affected converter was out of action for 14 months. Similar incidents on the Rihand–Delhi project in 1990 and the Sylmar Converter Station of the Pacific DC Intertie scheme in 1993 led to CIGRÉ publishing guidelines on the design of thyristor valves in order to reduce fire risks.[5]

Electrodes

Each bipole can be operated also as monopole and is equipped with a grounding electrode. The electrode lines of both bipoles are installed on wooden poles and consist of 2 x 689 mm2 1272 MCM conductors.

The electrodes for Foz do Iguaçu Station are situated at Santa Terezinha de Itaipu at 25°29′58″S 54°24′03″W / 25.49944°S 54.40083°W / -25.49944; -54.40083 (Santa Terezinha de Itaipu Grounding Electrode) and at Alvorada do Iguaçu at 25°23′32″S 54°27′43″W / 25.39222°S 54.46194°W / -25.39222; -54.46194 (Alvorada do Iguaçu Grounding Electrode) and are connected to the converter station via lines of 15.5 km and 16 km length respectively.

The electrodes for San Roque Station are situated at Córrego Boa Vista at 23°35′51″S 47°37′37″W / 23.59750°S 47.62694°W / -23.59750; -47.62694 (Córrego Boa Vista Grounding Electrode West) and at 23°35′49″S 47°37′06″W / 23.59694°S 47.61833°W / -23.59694; -47.61833 (Córrego Boa Vista Grounding Electrode East) and are connected to the converter station via lines of 66 km and 67.2 km length respectively.

Waypoints

Site Station type Line Coordinates
Foz do IguaçuConverter Station25°27′58″S 54°32′33″W / 25.46611°S 54.54250°W / -25.46611; -54.54250 (Foz do Iguaçu Converter Station)
OrtigueiraPLC repeater stationnorthern line24°01′51″S 51°05′52″W / 24.03083°S 51.09778°W / -24.03083; -51.09778 (Ortigueira PLC Repeater Station (Northern line))
OrtigueiraPLC repeater stationsouthern line24°19′16″S 50°51′22″W / 24.32111°S 50.85611°W / -24.32111; -50.85611 (Ortigueira PLC Repeater Station (Southern line))
IbiúnaConverter Station23°40′02″S 47°06′19″W / 23.66722°S 47.10528°W / -23.66722; -47.10528 (Ibiuna Converter Station)

See also

References

  1. "The Itaipu HVDC transmission". Archived from the original on 16 February 2007. Retrieved 16 April 2010.
  2. 1 2 Praça, A., Arakari, H., Alves, S.R., Eriksson, K., Graham, J., Biledt, G., Itaipu HVDC Transmission System - 10 years operational experience, V SEPOPE, Recife, May 1996.
  3. "Itaipu HVDC description". Archived from the original on 15 November 2005. Retrieved 16 April 2010.
  4. "Itaipu HVDC scheme". Retrieved 16 April 2010.
  5. Fire aspects of HVDC thyristor valves and valve halls, CIGRÉ Technical Brochure No. 136, February 1999.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.