Kakkad Hydro Electric Project
CountryIndia
PurposeHydroelectric
StatusCompleted
Construction began1999
Owner(s)Kerala State Electricity Board
Power Station
TypeHydro Power Plant
Installed capacity50 MW (2 x 25 MW)
Website
Kerala State Electricity Board

The Kakkad Hydroelectric Power Plant is located near Seethathode, in the Pathanamthitta district of the Indian state of Kerala. It is operated by the Kerala State Electricity Board.[1]

This hydropower plant has a design capacity of 50 MWe. It has 2 turbines, commissioned in 1998 and 1999.

Features

The project is in the second stage of development. The installed capacity is 50 MW (2 x 25MW). This scheme utilizes the tail race water from Sabarigiri power station and water from the Moozhiyar and Velluthode rivers. Two dams store water for the powerhouse. The main reservoir is on the Moozhiyar. The second reservoir is formed by the Veluthodu dam, across the Velluthode river. After generating power, water is released to the Kakkad River. Ullunkal and Karikkayam power stations use this water for power generation and then release it into the Maniyar reservoir for power generation at the Maniyar power station.

Kerala hydropower station
AttributeValue
State NameKerala
DistrictPathanamthitta
RiverMoozhiyar, Veluthodu /Pamba
Basin NameWest flowing rivers from Tadri to Kanyakumari
Hydro Elec RegionSouthern HE Region
Total Installed Capacity (MW)50
Type of ProjectHydroelectric Powerplant
Project StatusCompleted
Project Owner TypeGovernment
Owner NameKerala State Electricity Board
Inter Basin ProjectNo
Project SharingNone
Inter State Agreement- (Ratio like 50:50)
International SharingNone

References

  1. "Kakkad Hydroelectric Project JH01238 -". india-wris.nrsc.gov.in. Retrieved 20 March 2018.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.