Kaptis Hydroelectric Power Station | |
---|---|
Location of Kaptis Hydroelectric Power Station in Kenya | |
Official name | Kaptis Power Station |
Country | Kenya |
Location | Kaptis, Kakamega County/Vihiga County |
Coordinates | 00°12′16″N 34°53′52″E / 0.20444°N 34.89778°E |
Purpose | Power |
Status | Proposed |
Construction began | 2020 Expected |
Opening date | 2022 Expected |
Dam and spillways | |
Type of dam | Run of river |
Impounds | Yala River |
Spillway type | N/A |
Commission date | 2022 Expected |
Turbines | 3 x 5 MW |
Installed capacity | 15 megawatts (20,000 hp) |
Annual generation | 86 GWh |
Kaptis Hydroelectric Power Station, also Kaptis Power Station, is a planned hydroelectric power plant in Kenya, with generation capacity of 15 megawatts (20,115 hp).[1]
Location
The power station straddles the border of Kakamega and Vihiga Counties in Western Kenya and is located about 20 kilometres (12 mi), by road, southeast of the town of Kakamega.[2]
Overview
Kaptis Power Station is an independent power project, under development by a consortium comprising (a) Tembo Power, based in Ebene, Mauritius (b) Metier Private Equity International, a company based in Sandhurst, Gauteng, South Africa and (c) WK Construction, a South African engineering and construction company, based in Johannesburg. The consortium that is developing the power station, also owns it, as outlined in the table below.[3]
Rank | Name of Owner | Percentage Ownership |
---|---|---|
1 | Metier Private Equity International of South Africa | 40.0[3] |
2 | WK Construction of South Africa | 20.0[3] |
3 | Tembo Power of Mauritius | 40.0[3] |
Total | 100.00 | |
Funding
The run-of-the-river hydroelectric power plant is budgeted to cost US$44 million. The owner/developers of the power station will raise US$14 million in equity financing. The remaining US$30 million will be borrowed as arranged by the selected financial arranger, the Emerging Africa Infrastructure Fund, a subsidiary of the Private Infrastructure Development Group.[4]
In April 2020, it was announced that the US$30 million loan would be provided jointly by the Finnish Fund for Industrial Cooperation Limited (Finnfund) and Ninety One SA (formerly Investec Asset Management), a subsidiary of the Emerging Africa Infrastructure Fund (EAIF).[1]
Construction
It is anticipated that the project will reach financial close and construction will begin in the fourth quarter of 2020. Commercial commissioning is expected in the second half of 2022. WK Construction is expected to be the preferred civil works contractor.[5]
See also
References
- 1 2 Jean Marie Takouleu (20 April 2020). "Kenya: EAIF and Finnfund finance 15 MW Kaptis Hydroelectric Project". Paris: Afrik21.africa. Retrieved 24 September 2020.
- ↑ Google (24 September 2020). "Road Distance Between Kakamega And Chavakali" (Map). Google Maps. Google. Retrieved 24 September 2020.
- 1 2 3 4 Kevin Davids (31 March 2020). "Metier Partners With Tembo Power On Kaptis Hydroelectric Project". Nairobi: Infrastructure Brief. Retrieved 24 September 2020.
- ↑ Terence Creamer (16 April 2020). "Debt funders appointed for 15 MW Kenya hydropower project". Johannesburg: Engineering News South Africa. Retrieved 24 September 2020.
- ↑ Nicolette Pombo-van Zyl (26 March 2020). "Kenya's Kaptis hydropower project to see financial close in 2020". Rondebosch, South Africa: ESI-Africa. Retrieved 24 September 2020.