Kathmandu–Terai Expressway, also known as Fast Track, is an under construction road connecting Kathmandu and Nijgadh in southern Terai region of Nepal.[1] The road is 72.5 kilometres (45.0 mi) long, of which, 55.5 kilometres (34.5 mi) is normal roads, 10.59 kilometres (6.58 mi) is bridges and 6.41 kilometres (3.98 mi) is tunnels. The expressway is being constructed by Nepal Army, originally scheduled to be completed by September 2021.[2] The new set target date for completion is 2024.[3] As of July 2021, 16.1% of the work has been completed.
The consulting service for the construction is provided by Yooshin Engineering, a Korean firm.[4] The most complicated section, including the tunnels and several bridges will be constructed by Chinese companies China State Construction Engineering and Poly Changda Engineering.[5]
Controversies
In 2020, the Nepal Army had selected six international firms to provide consultation service for the project, however the process was stopped after a probe found that the selection criteria were leaked.[6]
See also
- National Highway System (Nepal)
- Nijgadh International Airport, which will be connected to Kathmandu by the expressway
References
- ↑ Khatiwada, Sachet; Aryal, Rajan. "Effective Implementation of the 'Kathmandu–Terai Fast Track' Road Project": 8.
{{cite journal}}
: Cite journal requires|journal=
(help) - ↑ Lamsal, Himal. "Kathmandu-Tarai fast track achieves 11 pc physical progress in three years". My Republica. Archived from the original on 13 April 2021. Retrieved 13 April 2021.
- ↑ Magazine, New Spolight. "Kathmandu–Terai/Madehsh Expressway Fast Progress". SpotlightNepal. Archived from the original on 13 April 2021. Retrieved 13 April 2021.
- ↑ "Public Procurement Review Committee to look into alleged irregularity in selection of consultant for Nijgadh expressway". Archived from the original on 13 April 2021. Retrieved 13 April 2021.
- ↑ "Chinese companies to construct "most complicated" section of Nepal's road project". Macau Business. 15 May 2021. Archived from the original on 16 May 2021. Retrieved 1 June 2021.
- ↑ "Government halves budget for Kathmandu-Tarai expressway". Archived from the original on 13 April 2021. Retrieved 13 April 2021.