Line 10
 10 
Overview
StatusUnder Construction
OwnerSuzhou Rail Transit Co., Ltd
Termini
Stations21
Service
TypeRapid transit
SystemSuzhou Rail Transit
Operator(s)Suzhou Rail Transit Co., Ltd
Technical
Line length90.34 km
Track gauge1,435 mm (4 ft 8+12 in)

Line 10 of Suzhou Rail Transit (Chinese: 苏州轨道交通10号线) is a under construction north–south regional rapid transit line in Suzhou, Jiangsu, China. [1] The Northern section of Line 10 is 90.34 km in length with 21 stations, including 13 elevated stations and 8 underground stations.[2] The line was formerly known as Suzhou Rail Transit Line S5.

Later sections of the line under planning will continue south through the city center of Suzhou to Wujiang District, Suzhou creating a north-south express regional rapid transit line.[3]

The line is designed for trains to operate up to 160 km/h and have passing loop for Direct Express and Express services to operate.[4]

Stations

The line has a total of 21 stations spanning across Suzhou, Changshu & Zhangjiagang cities in Jiangsu.[5]

The following are the 3 types of services provided along the line:

  • L - Local services
  • R - Rapid express services
  • D - Direct express services
L R D Station name Connections Structure Location
English Chinese
Jingang 金港 Elevated Zhangjiagang
|| Houcheng 后塍
| Guotaizhonglu 国泰中路 Underground
Yangshe 杨舍
Huachanglu 华昌路
| Jiangchenglu 蒋乘路
|| Luyuan 鹿苑 Elevated
| Zhangjiagang Railway Station 张家港站 Underground
|| Haiyu 海虞 Elevated Changshu
| Changshu Railway Station 常熟站  SS  Changshu railway station CAU Underground
Changjianglu 长江路 Elevated
| Exhibition Center 会展中心
Huaxi 花溪  20 
Zhaoshangbeilu 招商北路 Underground
| Kunchenghu West 昆承湖西 Elevated
|| Xinzhuang 辛庄
| Gaotiebeicheng 高铁北城
Zhengzhuhulu 珍珠湖路 Xiangcheng District, Suzhou
| Taidonglu 太东路
International Exhibition Center 国际会展中心
Suzhou North Railway Station 高铁苏州北站  2   7   JH  Suzhou North railway station OHH Underground

History

Construction of the Northern section, known as the Suyuzhang section, started on January 2, 2023. It is expected to open in 2028.[2] The length of this section is 90.34 kilometers.[4]

It runs through Zhangjiagang North Railway Station, Zhangjiagang Coach Station, Zhangjiagang Railway Station, Tangqiao, Fenghuang, Shanghu, to urban Suzhou at Suzhou North Railway Station and connects the Suzhou city to county-level cities of Zhangjiagang and Changshu, which are under the administration of Suzhou.[6]

References

  1. 10号线(苏虞张段)先导段工程可行性研究报告正式获批 - 苏州轨道交通
  2. 1 2 刚刚!地铁10号线(苏虞张段)开工 - 新浪财经(转载自姑苏晚报) 2023年1月2日
  3. "苏州地铁10号线站点+线路图- 苏州本地宝". m.suzhou.bendibao.com (in Chinese (China)). Retrieved 2023-01-28.
  4. 1 2 扬子晚报 (2023-01-07). "轨道交通10号线(苏虞张段)开工建设,第一站为高铁苏州北站!". k.sina.cn. Retrieved 2023-01-28.
  5. "苏州轨道交通10号线线路图一览". 2023-01-04.
  6. "独家 | 提前解密《苏州市城市轨道交通线网规划(2035)》". www.sohu.com. Retrieved 2020-02-04.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.