Line 12
Overview
StatusOperational
LocaleShenzhen, China
Termini
Stations33 (Phase 1)
Color on map     Lavender (#a192b2)
Service
TypeRapid transit
SystemShenzhen Metro
Operator(s)SZMC (Shenzhen Metro Group)
History
Opened28 November 2022 (2022-11-28)
Technical
Line length40.56 km (25.2 mi)[1] (Phase 1)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC (Overhead lines)
Operating speed80 km/h (50 mph)
Route map

Songgang
Shapu
Buchong
Shasan
Xihuan Road
Haoxiang
Dongbaohe Stabling Yard
Waterlands Resort East
Waterlands Resort South
Shenzhen World North
Shenzhen World
Fuhai West
Qiaotou West
Fuyong
Huaide
Fuwei
Airport East
Airport East Depot
Xingwei
Huangtian
Zhongwu South
Xixiang Taoyuan
Pingluan Hill
Baotian 1st Road
Bao'an Passenger Transport Temminal
Liutang
Shangchuan
Lingzhi
connection to Line 5
Xin'an Park
Tongle
Zhongshan Park
Nantou Ancient City
1 to Luohu Right arrow
Taoyuan
Nanshan
Nanguang
9 to Wenjin Right arrow
Nanyou
Sihai
Huaguoshan
Sea World
Taiziwan
Chiwan Stabling Yard
Zuopaotai East
Line 12 train

Line 12 of the Shenzhen Metro is one of the four new metro lines of Phase IV expansion in the Chinese city of Shenzhen.[2] Its construction began in 2017 and it opened on 28 November 2022.[3] The line uses six car type A trains and runs north to south on the east banks of the Pearl River Delta.[4]

Stations

Phase 1

Phase 1 of Line 12 starts at Zuopaotai East in Shekou, Nanshan District at the South west end of Shenzhen and ends at Waterlands Resort East in Shajing, Bao'an District in the northwest end of Shenzhen.[5] Phase 1 of the line is 40.56 km in length with 33 stations.[1]

Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Zuopaotai East 左炮台东 - 0 Nanshan
Taiziwan 太子湾
Sea World 海上世界 2
Huaguoshan 花果山
Sihai 四海  15 
Nanyou 南油 9
Nanguang 南光
Nanshan 南山 11
Taoyuan 桃园 1
Nantou Ancient City 南头古城  20 
Zhongshan Park 中山公园
Tongle South 同乐南
Xin'an Park 新安公园 Bao'an
Lingzhi 灵芝 5
Shangchuan 上川
Liutang 流塘  15 
Bao'an Passenger Transport Terminal 宝安客运站
Baotian 1st Road 宝田一路
Pingluan Hill 平峦山
Xixiang Taoyuan 西乡桃源
Zhongwu South 钟屋南
Huangtian 黄田
Xingwei 兴围
Airport East 机场东 1  20 
Fuwei 福围
Huaide 怀德
Fuyong 福永 11
Qiaotou West 桥头西
Fuhai West 福海西
Shenzhen World 国展 20
Shenzhen World North 国展北 20
Waterlands Resort South 海上田园南
Waterlands Resort East 海上田园东

Phase 2 (North extension)

The under construction Phase 2 to Songgang will add 6 stations north of Waterlands Resort East and extend the line to Line 6 and Line 11. The extension is 8.16 km in length, and will open in 2025.

Station name Connections Location
English Chinese
Haoxiang 蚝乡 Bao'an
Xihuan Road 西环路
Shasan 沙三
Buchong 步涌
Shapu 沙浦
Songgang 松岗 6 11

References

  1. 1 2 "深圳地铁12号线预计11月底开通运营". 2022-11-03. Archived from the original on 2022-11-05. 深圳地铁12号线线路全长约40.56公里,南起左炮台站,北至海上田园东站
  2. Zhang, Qian (9 February 2017). "Work on 4 New Metro Lines to Start This Year". Shenzhen Daily. Retrieved 9 February 2017.
  3. McGeary, Kevin (12 August 2013). "Metro Lines to Connect with Dong Guan and Hui Zhou". The Nanfang. Archived from the original on 2017-02-11. Retrieved 9 February 2017.
  4. "Shēnzhèn dìtiě 12, 13, 14, 16 děng 5 tiáo xiàn míngtiān kāigōng, 5 nián jiànchéng" 深圳地铁12、13、14、16等5条线明天开工,5年建成. news.sina.com.cn (in Chinese). 2018-01-09. Retrieved 2018-03-07.
  5. "Shenzhen metro official website". www.szmc.net. Retrieved 9 February 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.