Oak Grove Power Plant
CountryUnited States
LocationRobertson County, near Franklin, Texas
Coordinates31°10′53″N 96°29′17″W / 31.18139°N 96.48806°W / 31.18139; -96.48806
StatusOperational
Commission dateUnit 1: 2010 (917 MW)
Unit 2: 2011 (879 MW)
Owner(s)Luminant
Thermal power station
Primary fuelCoal (Lignite)
Cooling sourceTwin Oaks Reservoir
Power generation
Nameplate capacity1,796 MW

Oak Grove Power Plant is a 1.79-gigawatt (1,796 MW),[1] coal power plant located north of Franklin, Texas in Robertson County, Texas. The plant is operated by Luminant, a subsidiary of Vistra Energy. It began operations in 2010.

History

Plans for Oak Grove began in the 1970s as Texas Power & Light (a forerunner of Luminant) and Alcoa made an agreement to jointly operate a power plant named Twin Oak Steam Electric Station in Robertson County. The plan was to construct two, 750 MW units to burn lignite and be ready for commercial generation by 1981. The electricity generated would run to Alcoa's aluminium smelting facility in Palestine, Texas.[2] Twin Oaks Reservoir was developed by impounding Duck Creek in 1982 to act as a cooling source for the plant.[3] In 1983, Alcoa attempted to sell its stake in Twin Oak to Halliburton who was seeking electricity to offer to the owners of the troubled South Texas Nuclear Generating Station.[4] Ultimately, Alcoa sold its stake back to Texas Utilities in 1984. As electricity demand in Texas stagnated, construction on Twin Oak continued to be deferred until the air permit was withdrawn in 1994.[5]

The plant was renamed from Twin Oak to Oak Grove when construction restarted in 2007 by Luminant.[5][6] Construction resumed in order to meet future electricity demand and following the Texas Commission on Environmental Quality (TCEQ) granting Luminant a new air permit for Oak Grove.[7] The plant was reconfigured and redesigned to meet current emissions requirements. This included the addition of selective catalytic reduction (SCR) systems to reduce nitrogen oxide (NOx) emissions and activated carbon which prevents mercury from being released.[6] After Fluor completed the necessary construction work, Unit 1 came online in December 2009 and Unit 2 came online in June 2010.[8][9] Oak Grove utilizes lignite extracted from the nearby Kosse Mine.[5]

See also

References

  1. "Form EIA-860 detailed data with previous form data (EIA-860A/860B)". EIA.gov. September 13, 2018. Retrieved April 22, 2019.
  2. "TP&L plans generating station". McKinney Daily Courier Gazette. January 30, 1975. p. 21. Retrieved February 17, 2018 via https://newspaperarchive.com/. {{cite web}}: External link in |via= (help)
  3. "Twin Oaks Reservoir". Texas State Historical Association. Retrieved February 19, 2018.
  4. "Halliburton Deal For Power Plant". The New York Times. March 24, 1983. Retrieved February 17, 2018.
  5. 1 2 3 Peltier, Robert (August 1, 2010). "Luminant's Oak Grove Power Plant Earns POWER's Highest Honor". Power. Retrieved February 19, 2018.
  6. 1 2 Wheeler, Brian (September 1, 2010). "Oak Grove: That '70s Plant". Power Engineering. Retrieved February 19, 2018.
  7. Allen, Margaret (June 14, 2007). "TXU's Oak Grove plant gets state's OK". Dallas Business Journal. Retrieved February 19, 2018.
  8. "Luminant Puts Oak Grove Coal Plant Unit Online in Texas". Power. December 30, 2009. Retrieved February 19, 2018.
  9. "Luminant Tex Oak Grove 2 coal unit enters service". Reuters. June 3, 2010. Retrieved February 19, 2018.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.