Obulavaripalle–Krishnapatnam branch line
Overview
StatusOperational
OwnerIndian Railways
LocaleAndhra Pradesh
Termini
Stations6
Service
SystemIndian Railways
Operator(s)Vijayawada division of South Coast Railway zone
History
Opened1 September 2019 (2019-09-01)
Technical
Line length112 km (70 mi)
Number of tracks1
CharacterAt-grade street running
Track gauge5 ft 6 in (1,676 mm) broad gauge

Obulavaripalle–Krishnapatnam branch line is a railway section project in South Central Railway zone, which connects Obulavaripalle of Kadapa district and Krishnapatnam of Nellore district in the Indian state of Andhra Pradesh.[1][2] Further, this section intersects Howrah–Chennai main line, Guntakal–Renigunta section and Nadikudi–Srikalahasti section.[3] This section has a total length of 33.85 km (21.03 mi) and is administered under Vijayawada railway division of South Coast Railway zone.[1][3] On 2 March 2014, VenkatachalamKrishnapatnam part of the section was commissioned.[1]

References

  1. 1 2 3 "Annual Report 2015-16" (PDF). Rail Vikas Nigam Limited. p. 33. Retrieved 30 April 2019.
  2. Ganguly, Sarthak (28 February 2019). "Plans afoot for passenger trains to chug on Krishnapatnam-Obulavaripalli rail line". The Times of India. Hyderabad. Retrieved 30 April 2019.
  3. 1 2 "SCR Railway Map 2018" (PDF). South Central Railway. Retrieved 23 April 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.