Perleberg Solar Park
CountryGermany
LocationPerleberg
Coordinates53°04′21″N 11°49′30″E / 53.07250°N 11.82500°E / 53.07250; 11.82500
StatusOperational
Construction beganApril 2012
Commission dateJune 30, 2012
Owner(s)Gehrlicher Solar
Solar farm
TypeFlat-panel PV
Site area64 ha (160 acres)
Power generation
Units operational144,144
Nameplate capacity35 MWp
Annual net output33 GWh

The Perleberg Solar Park is a photovoltaic power station, with an installed capacity of 35 megawatts (MW). It uses 144,144 solar panels manufactured by Chinese company Yingli. The panels are mounted at a fixed angle on posts that are driven into the ground, at a former military airport.[1][2][3][4]