Railways in Adelaide | |
---|---|
Overview | |
Owner |
|
Locale | Adelaide, South Australia |
Transit type | Commuter rail |
Number of lines | 6 |
Number of stations | 89 |
Operation | |
Began operation | 1856 |
Operator(s) | Keolis Downer |
Character | At-grade with elevated and underground sections |
Train length | 2 (3000/3100) 3 (4000) |
Technical | |
Track gauge | 1,600 mm (5 ft 3 in) |
Electrification | 25 kV 50 Hz AC overhead (Seaford/Flinders & Gawler only)[1] |
The rail network in Adelaide, South Australia, consists of four lines (six including two short spurs) and 89 stations, totalling 132 km (82 mi).[2] It is operated by Keolis Downer under contract from the Government of South Australia, and is part of the citywide Adelaide Metro public transport system.
All lines around Adelaide were originally 1,600 mm (5 ft 3 in) broad gauge. The main interstate lines out of Adelaide towards Melbourne, Sydney, Perth and Darwin have been progressively converted to 1,435 mm (4 ft 8+1⁄2 in) standard gauge, but the suburban system and a few freight-only branch lines to the north remain broad gauge.
Operators
Rail services around Adelaide are provided by a mixture of private and government-owned organisations.
The Department for Infrastructure & Transport (DIT) owns the suburban passenger rail network, comprising six lines originating from Adelaide railway station on North Terrace in the CBD. Since January 2021, operation of the network has been contracted to Keolis Downer.
The Australian Rail Track Corporation (ARTC), an agency of the Federal Government, owns standard gauge interstate lines heading north and south, together with the dual gauge freight-only branch from Dry Creek to Port Adelaide and Pelican Point. The ARTC lines bypass the city to the west and do not enter the CBD. The ARTC network extends from Adelaide towards Melbourne, Sydney, Perth and Darwin and is used by substantial interstate freight traffic.
Freight trains are operated by a number of private operators, which have access agreements with rail network owners such as the ARTC. The largest of these is Pacific National, which handles the majority of interstate traffic and has the largest locomotive fleet. Other logistics companies also operate freight trains to and from interstate destinations and within South Australia.
One Rail Australia owns the remaining broad-gauge lines beyond the Adelaide suburban network. These are a handful of lines used mainly to move bulk grain and stone from the Barossa Valley and mid-north region of the state to the Port Adelaide area.
Journey Beyond is a private company operating long-distance interstate passenger trains on the ARTC's standard gauge lines, and run from the Adelaide Parklands Terminal, just west of the CBD. Journey Beyond's trains are the Indian Pacific to Sydney and Perth, The Ghan to Alice Springs and Darwin, The Overland to Melbourne and the seasonal Great Southern to Brisbane. There have been no intrastate regional passenger services in South Australia since 1990.
There are presently two heritage railways in South Australia run by volunteers, but none of these are in the Adelaide area. SteamRanger is based at Mount Barker and runs services through to Victor Harbor. The Pichi Richi Railway is considerably more distant from Adelaide, based at Quorn, and runs services through to Port Augusta.
History
Early days
In 1856, the first steam train ran between Adelaide and Port Adelaide, stopping at Bowden, Woodville and Alberton.[3] Soon after, a 40 km (25 mi) line was built from the Gawler to Adelaide to cater for the agricultural and mining industries.
The South Line, through the Adelaide Hills, opened to Aldgate, then Nairne in 1883, and extended to Bordertown in 1886. The first through train between Adelaide and Melbourne – The Intercolonial Express – ran on 19 January 1887, and was the first intercapital rail journey in Australia without changing trains at a break-of-gauge station.
Most of the lines around Adelaide were built before 1900.
The Webb Era
Despite the earlier geographic expansion, by 1920 the infrastructure and rolling stock of South Australian Railways (SAR) had become run down, inadequate and outdated. Many of the operating practices, such as train control and signalling, were backward by the standards of the time.
However the 1920s saw substantial and expensive improvements in most facets of the SAR's operations under the leadership of Railways Commissioner William Webb. Webb was an American who had substantial operational experience with US railroads, and served as Commissioner between 1922 and 1930.
During his reign, track, bridges, railway workshops, rolling stock and especially steam locomotives were all modernised and upgraded along essentially American lines. Adelaide station was rebuilt with a handsome sandstone building as a showpiece of the city on North Terrace. The building still stands; the lower level remains as the railway station, but the upper levels have been converted into a casino.
In 1929, one of the original broad-gauge steam railways to the beach-side suburb of Glenelg was transferred to the Municipal Tramways Trust, electrified and converted to a tramway. The Glenelg tram line is still in operation.
SAR, STA and AN
From early colonial days up until 1978, the SAR had built and operated most of the railway system within the state.
The Commonwealth Railways (CR), owned by the Federal Government, also had a significant role in the northern part of SA, with lines from Port Augusta across the Nullarbor Plain to Kalgoorlie, and to Marree and Alice Springs. None of its lines came close to Adelaide.
During the early 1970s, the Whitlam Federal Government proposed a strategy to nationalise and standardise the various state rail systems around Australia. South Australia and Tasmania were the only states to participate in this initiative and negotiations were long and drawn out. The result was that in March 1978 the SAR became defunct and South Australia's railways were split between Commonwealth and State Government ownership.
A new Commonwealth Government organisation, Australian National Railways Commission (ANR), took over all the former SAR and CR track in South Australia outside the metropolitan area. Other rail facilities such as property and workshops were also transferred to ANR. ANR become Australian National (AN) as it refined its corporate identity.
The State Government retained ownership and control of tracks and trains in the Adelaide suburban area under the auspices of the State Transport Authority (STA). The STA had been created in 1974 to co-ordinate all public transport in South Australia.
In 1994, the STA was abolished and reformed as the government-owned corporate body TransAdelaide as a prelude to competitive tendering for operation of bus and rail services in metropolitan Adelaide. TransAdelaide subsequently lost all its bus services to private operators, but has retained the contracts to operate train and tram services.
In November 1997, AN was broken up and sold as part of a Federal Government privatisation agenda. Track, workshops, depots and passenger and freight operations were sold to various private organisations, which has led to today's operational structure described in an earlier section.
Electrification projects
Noarlunga and Tonsley Line electrification
In 2008, the South Australian government announced, in collaboration with the Federal government, a plan to upgrade and electrify the Noarlunga line (now Seaford line) and Tonsley line (now Flinders line); the Belair line was also partially electrified as far as Goodwood to allow for electric train movements. Work on electrification began in January 2013 with the Belair line completed in mid-July 2013,[4] and electric train services beginning in February 2014 on the recently-extended Seaford Line.[5]
Gawler Line electrification
Previously cancelled in 2013, electrification of the Gawler line was announced in 2018. Though Stage 1 electrification as far as Salisbury was initially planned,[6] a $220 million grant from the Federal Government also allowed for Stage 2 electrification on the remainder of the line to proceed.[7] Works commenced in November 2019, and after many delays electric train services began on 12 June 2022.[8]
Future projects
Port Dock railway line extension
In 2022, the Department for Infrastructure and Transport announced that train services would be reinstated to Port Dock on the Outer Harbor line with the construction of a new spur line and station to begin in late 2023.[9] Despite the project only delivering one additional station, which spurs off from the Outer Harbor line after Alberton station, the opening of Port Dock will bring Adelaide Metro's total number of lines up to seven, and will be the first new railway line constructed on the network since the opening of the to Flinders Link extension in 2020.
Seaford line extension to Aldinga Beach
In 2019, Renewal SA delivered a Draft Structure Plan of a 94 hectare area of land in Aldinga which is set to include a new school and a railway station as an extension of the Seaford line.[10]
Underground city centre link
Infrastructure SA intends to complete electrification of the Gawler line, and analyse feasibility of an underground rail link in the CBD between the northern and southern railway lines.[11]
Lines
Line | Length | First service | Information | Electrified |
---|---|---|---|---|
Belair | 21.5 km (13.36 mi) | 1883 | Adelaide to Bridgewater opened 1883, Belair to Bridgewater closed 1987. The Adelaide to Melbourne main line via Belair and Bridgewater was converted to standard gauge in 1995, leaving one broad-gauge track from Goodwood to Belair. | Between Adelaide and Goodwood |
Gawler | 42.2 km (26.22 mi) | 1857 | Adelaide to Gawler opened 1857, Gawler to Gawler Central opened 1911. | |
Grange | 5.5 km (3.42 mi) | 1882 | Woodville to Grange opened 1882. Grange to Henley Beach 1894–1957, now demolished. Services share use of the Outer Harbor line until branching at Woodville. | — |
Outer Harbor | 10.2 km (6.34 mi) | 1856 | Adelaide to Port Dock opened 1856, Port Adelaide to Outer Harbor opened 1908. | — |
Seaford | 35.9 km (22.31 mi) | 1913 | Adelaide to Marino opened 1913, Marino to Hallett Cove opened 1915, Lonsdale to Christie Downs opened 1976, Christie Downs to Noarlunga Centre opened 1978, Noarlunga Centre to Seaford opened 2014. | |
Flinders | 4.5 km (2.80 mi) | 1966 | Woodlands Park to Tonsley opened 1966, Tonsley to Flinders opened 2020. Services share usage of the Seaford line until branching at Woodlands Park. |
Closed lines
Adelaide's passenger rail network decreased in size during the later half of the 20th century, with the closure of several lines and branches, including:
- Dry Creek–Port Adelaide line: opened 1868 (last passenger service in 1988; now freight only)
- Finsbury line: Woodville to Gillman Junction, 1940–1978
- Northfield line: Dry Creek to Northfield, 1857–1987
- Penfield line: Salisbury to Penfield 3, 1941–1991
- Semaphore line: Port Adelaide to Semaphore, 1878–1978
- Willunga line: Hallett Cove to Willunga, 1915–1969 (now the Coast to Vines Rail Trail)
Rolling stock
Class | Image | Type | Top speed (km/h) |
Builders | Built | Number | Lines Served | Notes |
---|---|---|---|---|---|---|---|---|
3000 | DMU | 130 | Comeng Clyde Engineering |
1988–1996 | 30 | Belair Outer Harbor Grange |
Interiors refurbished 2011 and 2021–22.
Mechanically refurbished 2018–19. | |
3100 | 40 | |||||||
4000 (A-City) |
EMU | 110 | Bombardier Alstom[lower-alpha 1] |
2013–2015, 2019–2023 | 34 | Gawler Seaford Flinders |
See also
References and notes
- ↑ "Adelaide A-City EMU" (PDF). 14 February 2013. Archived from the original (PDF) on 14 June 2018. Retrieved 14 June 2018.
- ↑ "Rail Network - Department for Infrastructure and Transport - South Australia". dpti.sa.gov.au. Archived from the original on 30 December 2020. Retrieved 30 December 2020.
- ↑ The Adelaide, City and Port Railway Callaghan, W.H. Australian Railway History, April/May, 2005 pp. 123-138, 143–149, 182–195
- ↑ Adams, Kara (1 July 2013). "Belair rail line to reopen, Transport Minister Chloe Fox announces". Herald Sun.
- ↑ Wills, Daniel (19 January 2014). "Transport and Infrastructure Minister Tom Koutsantonis turns on new electric Noarlunga train lines".
- ↑ Probert, Oliver (22 January 2018). "$615m Gawler electrification deal signed". Rail Express. Archived from the original on 7 July 2018. Retrieved 7 July 2018.
- ↑ Langenberg, Adam (13 July 2018). "$615m Gawler electrification deal signed". The Advertiser. Adelaide. Retrieved 16 July 2018.
- ↑ Metro, Adelaide (13 June 2022). "Gawler rail line reopens Sunday 12 June". Adelaide Metro. Archived from the original on 6 June 2022. Retrieved 13 June 2022.
- ↑ Blandis, Eva (25 June 2023). "Designs for $51m Port Dock Railway station revealed". The Advertiser.
- ↑ "Development of Aldinga train station inches closer". Victor Harbour Times. 29 May 2019. Archived from the original on 1 November 2019. Retrieved 1 November 2019.
- ↑ "Project Pipeline – Infrastructure SA". Archived from the original on 10 May 2019. Retrieved 10 May 2019.
- ↑ Bombardier Transportation was acquired by Alstom on 29 January 2021, during construction of the second batch of A-City trains. All of this batch were delivered by Alstom.