Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amount of storage, in which case the storage reservoir is referred to as pondage. A plant without pondage is subject to seasonal river flows, so the plant will operate as an intermittent energy source. Conventional hydro uses reservoirs, which regulate water for flood control, dispatchable electrical power, and the provision of fresh water for agriculture.
Concept
Run-of-the-river, or ROR, hydroelectricity is considered ideal for streams or rivers that can sustain a minimum flow or those regulated by a lake or reservoir upstream.[1][2]
A small dam is usually built to create a headpond ensuring that there is enough water entering the penstock pipes that lead to the turbines, which are at a lower elevation.[3] Projects with pondage, as opposed to those without pondage, can store water for daily load demands.[1] In general, projects divert some or most of a river's flow (up to 95% of mean annual discharge)[4] through a pipe and/or tunnel leading to electricity-generating turbines, then return the water back to the river downstream.[3]
Run-of-the-river projects are dramatically different in design and appearance from conventional hydroelectric projects. Traditional hydroelectric dams store enormous quantities of water in reservoirs, sometimes flooding large tracts of land. In contrast, run-of-river projects do not have the disadvantages associated with reservoirs and so cause fewer environmental impacts.[5]
The use of the term "run-of-the-river" for power projects varies around the world. Some may consider a project run-of-the-river if power is produced with no water storage, but limited storage is considered run-of-the-river by others. Developers may mislabel a project run-of-the-river to soothe public perception about its environmental or social effects. The European Network of Transmission System Operators for Electricity distinguishes run-of-the-river and pondage hydropower plants, which can hold enough water to allow generation for up to 24 hours (reservoir capacity / generating capacity ≤ 24 hours), from reservoir hydropower plants, which hold far more than 24 hours of generation without pumps.[6] The Bureau of Indian Standards describes run-of-the-river hydroelectricity as:[7]
A power station utilizing the run of the river flows for generation of power with sufficient pondage for supplying water for meeting diurnal or weekly fluctuations of demand. In such stations, the normal course of the river is not materially altered.[7]
Many of the larger run-of-the-river projects have been designed to a scale and generating capacity rivaling some traditional hydroelectric dams.[8] For example, the Beauharnois Hydroelectric Generating Station in Quebec is rated at 1,853 MW.[9] Some run-of-the-river projects are downstream of other dams and reservoirs. The reservoir was not built by the project but takes advantage of the water supplied by it. An example would be the 1995 1,436 MW La Grande-1 generating station. Previous upstream dams and reservoirs were part of the 1980s James Bay Project.
There are also small and somewhat-mobile forms of a run-of-the-river power plants. One example is the so-called electricity buoy, a small floating hydroelectric power plant. Like most buoys, it is anchored to the ground, in this case in a river. The energy within the moving water propels a power generator and thereby creates electricity. Prototypes by commercial producers are generating power on the Middle Rhine river in Germany and on the Danube river in Austria.[10]
Advantages
When developed with care to footprint size and location, run-of-the-river hydro projects can create sustainable energy minimizing impacts to the surrounding environment and nearby communities.[3] Advantages include:
Cleaner power and fewer greenhouse gases
Like all hydro-electric power, run-of-the-river harnesses the natural potential energy of water by eliminating the need to burn coal or natural gas to generate the electricity needed by consumers and industry. Moreover, run-of-the-river hydroelectric plants do not have reservoirs, thus eliminating the methane and carbon dioxide emissions caused by the decomposition of organic matter in the reservoir of a conventional hydroelectric dam.[11] That is a particular advantage in tropical countries, where methane generation can be a problem.
Less flooding
Without a reservoir, flooding of the upper part of the river does not take place. As a result, people remain living at or near the river and existing habitats are not flooded. Any pre-existing pattern of flooding will continue unaltered, which presents a flood risk to the facility and downstream areas.
Disadvantages
"Unfirm" power
Run-of-the-river power is considered an "unfirm" source of power: a run-of-the-river project has little or no capacity for energy storage[12] and so cannot co-ordinate the output of electricity generation to match consumer demand. It thus generates much more power when seasonal river flows are high (spring freshet),[13] and depending on location, much less during drier summer months or frozen winter months.
The plant will probably have a lower head of water than from a dam, and will thus generate less power.
Availability of sites
The potential power at a site is a result of the head and flow of water. By damming a river, the head is available to generate power at the face of the dam. A dam may create a reservoir hundreds of kilometres long, but in run-of-the-river the head is usually delivered by a canal, pipe or tunnel constructed upstream of the power house. The cost of upstream construction makes a steep drop desirable, such as falls or rapids.
Environmental impacts
Small, well-sited run-of-the-river projects can be developed with minimal environmental impacts.[3] Larger projects have more environmental concerns. For fish-bearing rivers, a ladder may be required, and dissolved gases downstream may affect fish.
In British Columbia, the mountainous terrain and wealth of big rivers have made it a global testing ground for 10–50 MW run-of-river technology. As of March 2010, there were 628 applications pending for new water licences solely for power generation, representing more than 750 potential points of river diversion.[14]
Vulnerable to climate change
Run-of-the-river projects strongly depend on the consistent flow of water, as they lack reservoirs and depend on the natural flow of rivers. Consequently, these projects are more vulnerable to climate change compared to storage-based projects. Short-term climate anomalies such as the El Niño Southern Oscillation (ENSO) can significantly disrupt the flow and can have a profound impact on the operation of these projects. Thus, incorporating climate change considerations into the initial design and location selection of run-of-the-river projects can help mitigate the vulnerability of these projects to climate-related disruptions.
Concerns
- Diverting large amounts of river water reduces river flows, affecting water velocity and depth, reducing habitat quality for fish and aquatic organisms; reduced flows can lead to excessively warm water for salmon and other fish in summer.[3]
- In undeveloped areas, new access roads and transmission lines can cause habitat fragmentation, allowing the introduction of invasive species.[3]
- The lack of reservoir storage may result in intermittent operation, reducing the project's viability.
Major examples
- Jirau Dam, Rondônia, Brazil 3,750 megawatts (5,030,000 hp)
- Santo Antônio Dam, Rondônia, Brazil 3,580 megawatts (4,800,000 hp)
- Chief Joseph Dam, Washington, United States 2,620 megawatts (3,510,000 hp)
- John Day Dam, Oregon/Washington, United States 2,160 megawatts (2,900,000 hp)
- Beauharnois Hydroelectric Power Station, Quebec, Canada, 1,903 megawatts (2,552,000 hp)[15]
- The Dalles Dam, Oregon/Washington, United States 1,878 megawatts (2,518,000 hp)
- Teles Pires Dam, Brazil 1,820 megawatts (2,440,000 hp)
- Inga Dams, Democratic Republic of the Congo 1,775 megawatts (2,380,000 hp)
- Satluj Jal Vidyut Nigam Ltd, Satluj River, Shimla, India, 1,500 megawatts (2,000,000 hp)[16]
- Ghazi-Barotha Hydropower Project, Khyber Pakhtunkhwa, Pakistan 1,450 megawatts (1,940,000 hp)
- Gezhouba Dam, Yichang, Hubei, China 2,715 megawatts (3,641,000 hp)[17]
See also
Notes
- 1 2 Dwivedi, A.K. Raja, Amit Prakash Srivastava, Manish (2006). Power Plant Engineering. New Delhi: New Age International. p. 354. ISBN 81-224-1831-7.
{{cite book}}
: CS1 maint: multiple names: authors list (link) - ↑ Raghunath, H.M. (2009). Hydrology : principles, analysis, and design (Rev. 2nd ed.). New Delhi: New Age International. p. 288. ISBN 978-81-224-1825-5.
- 1 2 3 4 5 6 Douglas T, Broomhall P, Orr C. (2007). Run-of-the-River Hydropower in BC: A Citizen's Guide to Understanding Approvals, Impacts and Sustainability of Independent Power Projects
- ↑ Knight Piesold Consulting. Plutonic Hydro Inc. Bute Inlet Project. Summary of Project Intake and Turbine Parameters. Knight Piesold Consulting.
- ↑ Hydromax Energy Limited. Hydromax Energy Limited website
- ↑ "Hydro modelling description (PDF)" (PDF). www.entsoe.eu. Retrieved 10 August 2020.
- 1 2 Partha J. Das, Neeraj Vagholikar. "Damming Northeast India" (PDF). Kalpavriksh, Aaranyak and ActionAid India. pp. 4–5. Retrieved 11 July 2011.
- ↑ Plutonic Power (2008). Revised Project Description for Bute Inlet Hydroelectric Project Requirements. P1. Plutonic Power.
- ↑ "Hydroelectric generating stations - Hydro-Québec Production". www.hydroquebec.com.
- ↑ ORF News. Strom aus Bojen serienreif. German. Retrieved 30 November 2019.
- ↑ "Reservoir Emissions". International Rivers. Retrieved 8 February 2017.
- ↑ Douglas, T. (2007). "Green" Hydro Power: Understanding Impacts, Approvals, and Sustainability of Run-of River Independent Power Projects in British Columbia. Watershed Watch.
- ↑ Wilderness Committee. Wilderness Committee Comments on the Draft Terms of Reference, Bute Inlet Hydroelectric Private Power Project. Letter to Kathy Eichenberger, Project Assistant Director. P1. Wilderness Committee.
- ↑ IPPwatch.com website. IPPwatch.com Archived 2011-01-13 at the Wayback Machine.
- ↑ Hydro-Québec Production (2012), Hydroelectric Generating Stations (as of December 31, 2010), Hydro-Québec, retrieved 2011-05-17
- ↑ "Nathpa - Jhakri Hydroelectric Project, Himachal Pradesh, India" (PDF). Geological Survey of India. Archived from the original (PDF) on 2 October 2011. Retrieved 7 August 2011.
- ↑ Gezhouba, China, Power Technology, Nov 2021, retrieved 2022-09-12
References
- Freedman, B., 2007, Environmental Science: a Canadian Perspective; 4th edition, Pearson Education Canada, Toronto, pp 226,394.