Overview | |
---|---|
Service type | Express |
Current operator(s) | North Eastern Railway zone |
Route | |
Termini | Shaktinagar Terminal (SKTN) Tanakpur (TPU) |
Stops | 39 |
Distance travelled | 860 km (534 mi) |
Average journey time | 24h 50m |
Service frequency | Four days [lower-alpha 1] |
Train number(s) | 15075/15076 |
On-board services | |
Class(es) | AC 2 tier, AC 3 tier, Sleeper class, General Unreserved |
Seating arrangements | No |
Sleeping arrangements | Yes |
Catering facilities | On-board catering E-catering |
Observation facilities | ICF coach |
Entertainment facilities | No |
Baggage facilities | No |
Technical | |
Rolling stock | 2 |
Track gauge | 1,676 mm (5 ft 6 in) |
Operating speed | 36 km/h (22 mph), including halts |
Triveni Express is an Express train belonging to North Eastern Railway zone that runs between Shaktinagar Terminal and Tanakpur in India. It is currently being operated with 15075/15076 train numbers on four days in week basis.[1][2]
The name Triveni signifies the Triveni Sangam or the meeting pointing of three rivers of the Ganges, the Yamuna and the Saraswati at Prayag in Prayagraj which is a station on the train's route.
Service
The 24369/Triveni Express has an average speed of 36 km/h and covers 741 km in 20h 50m. The 24370/Triveni Express has an average speed of 37 km/h and covers 741 km in 19h 55m.
Route and halts
The important halts of the train are:
Coach composition
The train has standard ICF rakes with max speed of 110 kmph. The train consists of 15 coaches:
- 1 AC II Tier
- 1 AC III Tier
- 4 Sleeper Coaches
- 7 General
- 2 Seating cum Luggage Rake
Traction
Both trains are hauled by a Lucknow Loco Shed-based WDM-3A or WDP-4 diesel locomotive from Shaktinagar to Bareilly and vice versa.
Rake sharing
The train shares its rake with 14369/14370 Triveni Express
Direction reversal
The train reverses its direction 1 times:
See also
Notes
- ↑ Runs four days in a week for every direction. Departs @ 15:25 SKTN/Shaktinagar Platform# 1 SUNDAY, MONDAY, WEDNESDAY, FRIDAY Arrives @ 16:15 +1 night TPU/Tanakpur Platform# 1 MONDAY, TUESDAY, THURSDAY, SATURDAY
References
- ↑ "Pushpak Express delayed by 23 hours". The Times of India. 24 June 2015. Retrieved 27 September 2018.
- ↑ Triveni will now run two hours ago
External links