Map of European Transmission System Operators Organizations (Regional Groups) Continental Europe, Nordic, Baltic, Great Britain and Ireland/Northern Ireland (former UCTE, UKTSOA, NORDEL, ATSOI, IPS/UPS).
Map of synchronous grids

The Nordic regional group (formerly NORDEL) of ENTSO-E is a synchronous electrical grid composed of the electricity grids of Norway, Sweden, Finland and the eastern part of electricity sector in Denmark (Zealand with islands and Bornholm). The grid is not synchronized with the Synchronous grid of Continental Europe, but has a number of non-synchronous DC connections with that as well as other synchronous grids. Gotland is not synchronized with the Swedish mainland either, as it is connected by HVDC.[1][2]

The Nordic system is connected to other synchronous areas by these links:[2]

References

  1. 1 2 3 4 5 6 7 8 9 "Nordic power system and interconnections with other systems". 19 May 2017. Retrieved 2023-02-25.
  2. 1 2 "Transmissionsnätskarta". svk.se. Svenska kraftnät. Retrieved 8 September 2021.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.