Toba River | |
---|---|
Mouth of Toba River | |
Location | |
Country | Canada |
Province | British Columbia |
District | Range 1 Coast Land District |
Physical characteristics | |
Source | Toba Glacier |
• location | Coast Mountains |
Mouth | Toba Inlet |
• location | Sunshine Coast |
• coordinates | 50°29′17″N 124°21′57″W / 50.48806°N 124.36583°W[1] |
• elevation | 0 m (0 ft)[2] |
Basin size | 1,759 km2 (679 sq mi)[3] |
The Toba River is a river in the Canadian province of British Columbia. Also referred to as the East Toba river. Its drainage basin is 1,759 square kilometres (679 sq mi) in size.[3]
Course
The Toba River originates in the Coast Mountains and flows generally southwest from Toba Glacier to the head of Toba Inlet.[1]
Toba Montrose
In 2004 development of a 235 MW run of river energy project began on East Toba River. The $660 million project is funded and operated through a private loan from a partnership of lenders led by Manulife Financial Canada. Plutonic Power Corporation and GE Energy also referred to as the Toba Montrose General Partnership are the main stakeholders in the project . Construction is overseen by the Kiewit Corporation in partnership with the Sliammon and K'ómoks First Nation Territory Agreement.[4] On 7 March 2011, it was announced that Magma Energy and Plutonic Power will merge to create Alterra Power Corp.[5] The Toba Montrose Project was in operation in August 2010.[6]
Upper Toba Valley
See also
References
- 1 2 "Toba River". BC Geographical Names.
- ↑ Elevation derived from ASTER Global Digital Elevation Model, using GeoLocator, BCGNIS coordinates, and topographic maps.
- 1 2 Gazetteer of Canada. Vol. British Columbia. Canadian Board on Geographic Names. 1953. pp. xv.
- ↑
- ↑ "Join News Mar 07, 2011 Magma Energy Corp and Plutonic Power Corporation to Merge and Create Alterra Power Corp". CNW. Retrieved 28 March 2014.
- ↑ "Archived copy" (PDF). Archived from the original (PDF) on 2015-04-02. Retrieved 2013-07-19.
{{cite web}}
: CS1 maint: archived copy as title (link)