Uttara South উত্তরা দক্ষিণ | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Dhaka Metro Rail station | |||||||||||
General information | |||||||||||
Other names | Station 3 | ||||||||||
Location | Sector 17, Uttara, Dhaka Bangladesh | ||||||||||
Coordinates | 23°50′44″N 90°21′47″E / 23.84560°N 90.36314°E | ||||||||||
Owned by | Dhaka Mass Transit Company Limited | ||||||||||
Line(s) | MRT Line 6 | ||||||||||
Platforms | Side platform | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 3 | ||||||||||
Parking | No | ||||||||||
Bicycle facilities | No | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | 31 March 2023 | ||||||||||
Electrified | 1,500 V DC overhead catenary | ||||||||||
Services | |||||||||||
| |||||||||||
| |||||||||||
Location | |||||||||||
Uttara South (Bengali: উত্তরা দক্ষিণ, romanised: Uttora dokkhin) is an elevated metro station of the Dhaka Metro's MRT Line 6. This station is located in Uttara, a suburb of Dhaka. It is estimated that the station will be opened on the last week of March 2023.[2][3] It became operational from 31 March 2023.[4]
History
The Uttara South Metro Station was constructed under "Package CP-03". The notification of application for construction of raised bridges for stations and railways was published on 30 June 2015 and the last date for submission of applications was 9 September 2015. Italian-Thai Development Public Company Limited gets work contract for "Package CP-03". The agreement was sent on 29 March 2016 for NBR investigation and law and parliamentary investigation. The signing ceremony for the agreement package was held on 3 May 2017 at the Pan Pacific Sonargaon Hotel in Dhaka. Construction work started on 2 August 2017.[5][6]
Station
Station layout
G | Path level | Exit / Entry |
L1 | Between | Rent control, station agent, metro card vending machine, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 1 Southbound |
Towards → Agargaon next station is Pallabi | |
Platform 2 Northbound |
Towards ← Uttara North next station is Uttara Center | |
Side platform | Doors will open on the left | ||
L2 | ||
References
- ↑ "Line 6 route map" (PDF). Dhaka Mass Transit Company Limited. Retrieved 23 December 2022.
- ↑ "প্রধানমন্ত্রীকে নিয়ে মাত্র ১০ মিনিটে দিয়াবাড়ি থেকে আগারগাঁওয়ে মেট্রোরেল". Prothom Alo (in Bengali). 28 December 2022. Retrieved 28 December 2022.
- ↑ Tuhin Shubhra Adhikary (6 June 2021). "Uttara-Agargaon Metro Rail: Launch now aimed at Dec 2022". The Daily Star.
- ↑ "খুলে গেলো মেট্রোর সব দ্বার". Jamuna Television (in Bengali). 31 March 2023. Retrieved 31 March 2023.
- ↑ "CP-03, CP-04 (Viaduct & Stations, Uttara-Agargaon)". 17 March 2020. Archived from the original on 15 January 2022. Retrieved 8 February 2022.
- ↑ "Construction of Metro rail and station starts today". The Asian Age. 2 August 2017.