Württemberg B/B2 | |||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||
|
The Württemberg Class B and Class B2 engines were steam locomotives with the Royal Württemberg State Railways (Königlich Württembergische Staats-Eisenbahnen) first built in 1868 by the Maschinenfabrik Esslingen ('Esslingen engineering works') in Esslingen in the former Kingdom of Württemberg in southern Germany.
The engines had a Crampton boiler, an inside Allan valve gear and, for the first time in Württemberg, a Prüsmann chimney. They were equipped with 2 T 6.5 tenders.
See also
References
- Lohr, Hermann; Thielmann, Georg (1988). Lokomotiven württembergischer Eisenbahnen (EFA 2.6) (in German). Düsseldorf: Alba. pp. 63–67, 158. ISBN 3-87094-117-0.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.