Xidu 西渡 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | Xizha Highway and Huhang Highway Fengxian District, Shanghai China | ||||||||||
Coordinates | 30°59′28″N 121°25′41″E / 30.991050°N 121.427932°E | ||||||||||
Operated by | Shanghai No. 1 Metro Operation Co. Ltd. | ||||||||||
Line(s) | Line 5 | ||||||||||
Platforms | 2 (2 side platforms) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | 30 December 2018 | ||||||||||
Services | |||||||||||
|
Xidu (Chinese: 西渡; pinyin: Xīdù; lit. 'ferry pier in the west') is a station on Line 5 of the Shanghai Metro. Located at Xizha Highway and Huhang Highway in the city's Fengxian District, the station is located on the main branch of Line 5 and opened as part of the southern extension of Line 5 on 30 December 2018.[1] It is an elevated station.[2][3]
The station is located between Jiangchuan Road and Xiaotang. North of this station, Line 5 trains travel on the lower deck of the Minpu Second Bridge over the Huangpu River into Minhang District.
References
- ↑ Shanghai Shentong Metro Group Co., Ltd. (2018-12-28). 5号线南延伸和13号线二、三期12月30日起试运营. Shanghai Shentong Metro Group Co., Ltd. (in Chinese). Retrieved 2018-12-29.
- ↑ 上海地铁5号线南延伸段新进展!列车热滑实验今天顺利完成. Sina (in Chinese). 2017-11-10. Retrieved 2018-01-14.
- ↑ 轨交5号线南延伸段预计2018年通车. Sohu (in Chinese). 2017-07-25. Retrieved 2018-01-14.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.