Yarra Trams
IndustryTransportation company
PredecessorPublic Transport Corporation
Founded1 July 1998
Headquarters
Area served
Melbourne
Key people
Carla Purcell (CEO)
ParentTransdevTSL (1999–2004, 2004–2009), Keolis Downer (2009–present)
Websitewww.yarratrams.com.au

Yarra Trams is the trading name of the operator of the tram network in Melbourne, Australia, which is owned by VicTrack and leased to Yarra Trams by the Victorian Department of Transport and Planning. The current franchise is operated by Keolis Downer. As at May 2014, Yarra Trams operate 487 trams, across 26 tram routes and a free City Circle tourist tram, over 1,763 tram stops. With 250 km (155.3 mi) of double track, Melbourne's tram network is the largest in the world.

In 2015/16, 203.8 million journeys were taken on Melbourne's trams,[1] with trams traveling more than 24.8 million kilometres annually. Each week Yarra Trams operates 31,400 scheduled tram services, which results in trams operating for approximately 20 hours per day and a team of 24-hour operations staff completing network maintenance and cleaning.

History

Yarra Trams – TransdevTSL Logo
B2 2104 on Swanston Street in an early TransdevTSL livery

In October 1997, in preparation for privatisation, it was announced that the Public Transport Corporation's tram operations were split into two business units, Swanston Trams and Yarra Trams.[2][3] The split was effective on 1 July 1998.[4][5]

TransdevTSL

MetroLink Victoria Pty Ltd, a joint venture between Transfield Services (50%), Transdev (30%) and Egis (20%), successfully bid to take over the Yarra Trams services from 29 August 1999.[6][7][8][9] Transdev bought out Egis' share in 2000.[10] MetroLink Victoria became part of TransdevTSL in 2007.[11]

The joint venture inherited 23 W, 31 Z3, 28 A1, 42 A2, two B1 and 55 B2 class trams and took over the operation of 10 routes and four depots; Camberwell, East Preston, Kew and Southbank.[12][13] In March 2000 a new white with green and blue stripes and grey skirt livery was introduced.[14]

After National Express (who operated the other half of the network) handed back its M>Tram franchise having been unable to renegotiate financial terms, the State Government temporarily took it over.[15][16][17] In May 2003 the State Government announced it would establish a single company to operate both networks, and was negotiating with TransdevTSL to operate this entity. In February 2004 an agreement was reached, and the networks were reunited on 18 April 2004 under the Yarra Trams brand.[18][19]

Keolis Downer

When the franchise was next tendered, Transdev TSL and Keolis Downer were shortlisted to bid.[20] In June 2009, the franchise was awarded to Keolis Downer with the new franchise commencing on 30 November 2009.[21][22] The Yarra Trams brand was retained.[23] Keolis Downer introduced a new Yarra Trams logo along with a new livery featuring yellow doors.

In September 2017, it was announced that the franchise is to be extended until November 2024, but with tougher conditions.[24][25][26]

Operations

Fleet

As of January 2019, the fleet consists of over 450 W, Z3, A1, B2, C1, C2, D and E class trams, operated from eight depots.[27]

In October 2001, Yarra Trams took delivery of the first of 36 C class Alstom Citadis trams which have primarily operated on route 109 to complement the extension to Box Hill.[28][29][30] As part of the acquisition of M>Tram in 2004, Yarra Trams acquired 39 D class Siemens Combino trams and oversaw the delivery of another 20 still on order. They are leased from the Commonwealth Bank, rather than VicTrack.[31]

Heritage W-class trams run solely on the City Circle tourist service. Due to these trams being limited to 40 km/h (24.9 mph) as a result of a series of modifications due to braking problems, their use is restricted to ensure limited interference with modern trams.

In 2003, Yarra Trams trialled a seating layout which became known as "Apollo". The trial involved removing 30 seats from a B-class tram and replacing the removed seats with "bum racks" which are found in Citadis trams. This resulted in a higher capacity for standing passengers on crowded services during peak hours. A further ten trams received the seating layout during refurbishment.

Ninety E-class are being delivered by Bombardier Transportation, Dandenong.[32]

As of 8 February 2023, 100 Flexity 2 trams manufactured by Bombardier Transportation have been ordered and were manufactured in 2022. They will be 3 carriage long trams.

Ticketing

Yarra Trams run under the Public Transport Victoria banner, as do other operators of public transport franchises in metropolitan Melbourne, and use the myki ticketing system. Metcard tickets have not been accepted on trams since December 2012, and coin-only Metcard ticket machines and validators have been removed. Seats were installed in place of the ticket machines.

The entire tram network has now changed over to the myki smartcard fare collection system, with passengers needing to buy and top up a valid myki before boarding, or risk a fine of up to $238. Myki cards can be purchased from all staffed railway stations and retail outlets displaying a myki logo, including at all 7-Eleven convenience stores. They cannot be purchased or topped up on board a tram.

All tram routes operate entirely within zone 1. However, routes 75, 86 and 109 enter the zone 1/2 overlap at the very end of their outer-suburban routes. If a passenger begins and ends their journey completely within the zone 1/2 overlap, they can touch off to receive a slightly lower fare. If any part of the journey is within Zone 1, there is no need for the passenger to touch off as the fare is automatically calculated. Touching off on a zone 1 journey is both redundant and may cause delay or inconvenience to other passengers and the tram networks 'on time' performance. If passengers only travel in the free tram zone, there is no need to touch on their myki.

Network expansion

New platform stop under construction

Since privatisation, the tram network has grown in size as a result of a number of extensions. The accessibility of the network has also been improved, with 360 platform stops built as of January 2014.[33]

In March 2000 services were extended to the new Melbourne Docklands precinct. Since then, a line connecting La Trobe and Flinders Streets via Docklands has been constructed as well as a further extension along Docklands Drive to NewQuay, which opened in January 2005. route 109 was extended 2.2 km (1.4 mi) from Mont Albert to Box Hill in May 2003. The extension to Box Hill has provided a direct link between Box Hill and suburbs such as Balwyn, Kew and Richmond.

In July 2005, a 3 km (1.9 mi) extension of route 75 from Burwood East to Vermont South opened.

In April 2018, the state government announced a new extension of the tram network from Caulfield.[34] The 18 km (11.1 mi) extension would serve Chadstone, Monash University, Waverley Park and Rowville.[35] The state government allocated $3 million to plan the route, which would be carried out in two stages.[36]

Think Tram

Full-time tram lane

Yarra Trams is a partner in the Think Tram program with VicRoads, aimed at improving tram travel time and reliability. In conjunction with the Victorian government several initiatives are in place to enable trams to better meet punctuality targets. These include 'T-lights' which give trams priority at traffic signals, as well as part-time tram lanes and full-time tram lanes.

Part-time tram lanes are used often only during peak hours, with an example of this being on High Street along the route 6. Vehicles must not enter a part-time tram lane at any point during the nominated times except to avoid an obstruction, or perform a right turn; even then, vehicles must not proceed by law into the lane to do so unless they will not delay any approaching tram/s from either direction. The limit for staying in the lane to avoid an obstruction or turn right is 50 metres, at which point a vehicle must exit the lane entirely.

Full-time tram lanes often utilise raised curb dividers to physically prevent cars from straying onto tram tracks. Examples of these dividers can be seen on Spencer Street, Swanston Street in Carlton and Fitzroy Street in St Kilda. Vehicles must not enter a full-time tram lane at any time except to avoid an obstruction; even then, vehicles must not proceed by law into the lane to do so unless they will not delay any approaching tram/s from either direction. The limit for staying in the lane to avoid an obstruction is 50 metres, at which point a vehicle must exit the lane entirely. Some lanes only allow this to occur at certain points, or breaks, in the raised dividers. Crossing the raised dividers otherwise can cause severe damage to a vehicle.

Beware the Rhino

A D2 promoting the 'Beware the Rhino' campaign in 2012

In May 2011, Yarra Trams launched their 'Beware The Rhino' safety campaign, aiming to increase awareness of tram traffic. It analogises a stampede of rhinoceroses as being as dangerous as a tram, highlighting the dangers that people put themselves in when they move into the path of a tram.[37] The campaign has won creativity awards,[38] and was refocused in 2013.[39]

Legislation and governance

Transport Integration Act

The prime transport-related statute in Victoria is the Transport Integration Act 2010, which establishes the Department of Transport as the integration agency for Victoria's transport system. The Act also establishes and sets the charters of the state agencies charged with providing public transport rail services, namely the Public Transport Development Authority. The PTDA is empowered by the Transport Integration Act to contract transport operators to provide rail and bus services and has used those powers to contract Yarra Trams to provide tram services in Melbourne.[40]

In addition, the Transport Integration Act establishes VicTrack which owns the public rail network and associated infrastructure. Another important statute is the Rail Management Act 1996[41] which confers powers on rail operators and provides for an access scheme for the state's rail network. The Transport (Compliance and Miscellaneous Act) 1983 is also a relevant statute relating to public transport and contains a number of offences relating to safety, ticketing and amenity.

Rail Safety Act

The safety of rail transport operations in Melbourne is regulated by the Rail Safety Act 2006 which applies to all commercial passenger operations.[42] The Act establishes a framework containing safety duties for all rail industry participants and requires operators who manage infrastructure and rolling stock to obtain accreditation prior to commencing operations. Accredited operators are also required to have a safety management system to guide their operations. Sanctions applying to the safety scheme established under the Rail Safety Act are contained in the Transport (Compliance and Miscellaneous) Act 1983.[43] The safety regulator for the rail system in Melbourne including trams is the Director, Transport Safety (trading as Transport Safety Victoria) whose office is established under the Transport Integration Act 2010.

References

  1. "Network statistics". Public Transport Victoria. Archived from the original on 30 September 2017. Retrieved 23 March 2017.
  2. "City in Brief" Railway Gazette International December 1997 page 835
  3. "Melbourne on the brink of change" Trolley Wire issue 273 May 1998 page 3
  4. "Report of the Auditor-General – Victorian Government's finances 1998–99" (PDF). Auditor-General of Victoria. 1999. p. 114. Archived (PDF) from the original on 25 March 2023. Retrieved 25 March 2023.
  5. "Victoria's public transport – Assessing the results of privatisation" (PDF). Institute of Public Affairs. April 2007. p. 8. Archived (PDF) from the original on 25 March 2023. Retrieved 25 March 2023.
  6. "First Melbourne franchise" Railway Gazette International July 1999
  7. "NEG conquers Oz" Rail issue 363 11 August 1999 page 11
  8. "Trams in Melbourne". Yarra Trams. Archived from the original on 27 September 2016. Retrieved 25 June 2013.
  9. Transfield Services (19 February 2004). "Transfield Services/Transdev Partnership With the State Government of Victoria to Operate the Entire Melbourne Tram Network" (PDF) (Press release). Australian Securities Exchange. Archived (PDF) from the original on 10 October 2022. Retrieved 25 June 2013.
  10. Melbourne Yarra Trams Archived 2 February 2017 at the Wayback Machine Egis Australia
  11. "Sustainability drives TransdevTSL". Transfield Services. 2008. Archived from the original on 22 February 2014. Retrieved 4 June 2013.
  12. "Prelude to Privatisation – New Rail & Tram Capital Works for Melbourne" Railway Digest January 1999 page 13
  13. "Yarra Trams" Trolley Wire issue 279 November 1999 page 25
  14. "Melbourne – Yarra Trams" Trolley Wire issue 281 May 2000 page 30
  15. National Express walks out of Australian rail service Archived 12 January 2018 at the Wayback Machine The Daily Telegraph (London) 17 December 2002
  16. Receivers take over train, tram group Archived 26 October 2012 at the Wayback Machine The Age 24 December 2002
  17. Nat Express pull back Down Under Archived 12 April 2018 at the Wayback Machine The Daily Telegraph (London) 3 September 2004
  18. "Yarra Trams takes over" Railway Gazette International May 2004 page 254
  19. "Yarra Trams takes over in Melbourne" Trolley Wire issue 297 May 2004 pages 21/22
  20. "Two from three shortlisted" Railway Gazette International September 2008 page 566
  21. "Melbourne operators selected" Railway Gazette International August 2009 page 12
  22. Cooper, Mex (25 June 2009). "New train, tram operators for Melbourne". The Age. Archived from the original on 26 June 2009. Retrieved 25 June 2013.
  23. Gardiner, Ashley (2 September 2009). "New operators promise a smoother ride in time for summer". Herald Sun. Retrieved 25 June 2013.
  24. Full steam ahead: Government offers Metro and Yarra Tram seven more years Archived 7 February 2018 at the Wayback Machine The Age 29 September 2016
  25. Keolis Downer retains contract to operate world's largest tram network Archived 12 September 2017 at the Wayback Machine Metro Report International 12 September 2017
  26. "Tough new conditions, fines for Metro Trains and Yarra Trams". 12 September 2017. Archived from the original on 7 November 2017. Retrieved 4 November 2017.
  27. "Facts & figures". Yarra Trams. Archived from the original on 29 May 2014. Retrieved 25 June 2013.
  28. Alstom to supply new trams and maintenance for Melbourne Archived 16 March 2017 at the Wayback Machine Alstom 6 October 2000
  29. "Yarra Trams Orders Alstom's Citadis Cars" Railway Digest December 2000 page 15
  30. Low floor trams have arrived Archived 29 October 2013 at the Wayback Machine Yarra Trams 17 August 2001
  31. Rattlers one day, combino the next Archived 14 November 2013 at the Wayback Machine The Age 24 November 2002
  32. Carey, Adam; Butt, Craig (19 June 2013). "Tram squeeze eases but some still suffer". The Age. Archived from the original on 22 June 2013. Retrieved 25 June 2013.
  33. "Accessible trams". Public Transport Victoria. Archived from the original on 16 January 2014. Retrieved 16 January 2014.
  34. "New Tram To Connect City's South-East". Premier of Victoria. 10 April 2018. Archived from the original on 4 April 2019. Retrieved 4 January 2019.
  35. "Government plans new tram route for Melbourne's south-east". ABC News. 10 April 2018. Archived from the original on 23 September 2018. Retrieved 4 January 2019.
  36. "Government plans new tram route for Melbourne's south-east". ABC News. 10 April 2018. Archived from the original on 23 September 2018. Retrieved 4 January 2019.
  37. "Positive results following Beware The Rhino campaign". Yarra Trams. Archived from the original on 7 December 2015. Retrieved 25 June 2013.
  38. "Rhino is named Australia's best". Yarra Trams. Archived from the original on 19 July 2013. Retrieved 25 June 2013.
  39. "Drivers beware – The rhino returns with a new safety message". Yarra Trams. Archived from the original on 1 June 2013. Retrieved 25 June 2013.
  40. Transport Integration Act 2010], section 68(2)(b).
  41. "Rail Management Act 1996" (PDF). Archived (PDF) from the original on 19 March 2011. Retrieved 16 December 2010.
  42. "Rail Safety Act 2006" (PDF). Parliament of Victoria. Archived (PDF) from the original on 6 July 2011. Retrieved 16 January 2014.
  43. "Transport (Compliance and Miscellaneous) Act 1983" (PDF). Parliament of Victoria. pp. 267–455 (part 7). Archived (PDF) from the original on 17 March 2011. Retrieved 16 January 2014.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.