Amaravati Seed Capital Road
BRTS Lane of Seed Access road, Amaravati during a Sunset.jpg
Route information
Length21 km (13 mi)
Major junctions
West endDondapadu
East endKanakadurga Varadhi junction (National Highway 16)
Location
CountryIndia
Highway system

Amaravati Seed Capital Road or ASC Road is an ongoing arterial flyover road project and a part of Amaravati Seed Access Road Network to connect the city of Vijayawada with Amaravati.[1][2] It is built by the Andhra Pradesh Capital Region Development Authority (APCRDA) with an estimated cost of 2.3 billion (US$29 million) and has a total length of 21 km (13 mi).[3][4]

Phase–I

The proposed phase–I of the road will be constructed for a length of 18.3 km (11.4 mi) between Dondapadu–near Kondaveetivagu by the end of 2018.[5]

References

  1. "Eight-lane road to connect Vijayawada, Amaravati". The Hans India. Retrieved 17 January 2017.
  2. Staff Reporter. "Seed capital access roads in tendering stage". The Hindu. Retrieved 3 May 2017.
  3. "High-speed road to Amaravati". Deccan Chronicle. 26 June 2016. Retrieved 29 June 2016.
  4. "AP government clips wings of CRDA". The Times of India. 14 April 2016. Retrieved 29 June 2016.
  5. "CM allots first lot of plots in Amaravati". The Hindu. 26 June 2016. Retrieved 29 June 2016.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.