Guiyang Metro | |
---|---|
Overview | |
Owner | Guiyang Urban Rail Transit Co., Ltd |
Area served | Baiyun District Guanshanhu District Yunyan District Nanming District Huaxi District |
Locale | Guiyang, Guizhou Province, China |
Transit type | Rapid transit |
Number of lines | 3 |
Number of stations | 82 |
Website | www |
Operation | |
Began operation | December 28, 2017[1] |
Operator(s) | Guiyang Urban Rail Transit Corporation |
Technical | |
System length | 118.73 km (73.78 mi)[2] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | Catenary third rail |
Average speed | 80 km/h (50 mph) |
The Guiyang Metro is a rapid transit system in the city of Guiyang, Guizhou province, China. It is operated and branded as Guiyang Urban Rail Transit (GYURT).
A short northern section of Line 1 opened on 28 December 2017,[1] with the full line entering operation on 1 December 2018.[3] Line 2 opened on 28 April 2021.[4] Line 3 opened on 16 December 2023.[2] Line S1 and Line T2 are also under construction.[5][6]
Fares
Fares are set by distance traveled, with RMB 6 being the maximum. Children under 1.3 meters ride free, with other children being half-price, though paper children's tickets need to be bought from the counters as they are not yet available from the ticket machines as of February 2019. Those over 70 years old travel free on public transport in Guiyang.
Lines in operation
Line | Terminals (District) |
Commencement | Newest Extension |
Length km |
Stations | |
---|---|---|---|---|---|---|
1 | Douguan (Guanshanhu) |
Xiaomeng Industrial Park (Huaxi) |
2017 | 2019 | 35.11[7][8] | 25 |
2 | North Baiyun Road (Baiyun) |
Zhongxing Road (Nanming) |
2021 | 40.6[4] | 32 | |
3 | Luowan (Wudang) |
Tongmuling (Huaxi) |
2023 | 43.03[2] | 29 |
Line 1
Line 1 was approved for construction on 6 May 2013, and approved for plan in 2006. The line goes through Guanshanhu, Yunyan, Nanming and Huaxi Districts. The line twice crosses Nanming River and connects the downtown area with a number of outlying districts. The line depots are Xiaohe Depot and Guanshanhu Depot. The railway electrification system are overhead line and third rail.[1] Line 1 runs northwest to south.
Line 2
Line 2 is 40.6 km with 32 stations,[9] including 30 underground stations and 2 elevated stations.[10] Line 2 runs north to southeast. It opened on April 28, 2021.[4]
Line 3
The first phase of Line 3 is 43.03 km in length and has 29 stations. Line 3 runs from northeast to south. It opened on 16 December 2023.[2]
Lines under construction
Line S1
The first phase of Line S1 is under construction. It will be 30.32 km in length,[11] including 22.64 km underground section and 7.68 km elevated section.[12] It is expected to open in 2024.[5]
Line T2
The first phase of Line T2 is under construction. It will be 10.92 km in length, with 13 stations.[13][14] It is expected to open in 2024.[5]
Future development
- Long-term plan
Lines 4, S2, S3, S4, and Line G1 which passes through the Gui'an New Area, are in the planning stage.[15]
See also
Notes
References
- 1 2 3 "贵阳地铁今日13时启程" (in Chinese). 黔讯网. 2017-12-28. Archived from the original on 2017-12-28. Retrieved 2017-12-28.
- 1 2 3 4 "贵阳轨道交通3号线正式开通运营". 中国新闻网. 16 December 2023.
- ↑ "贵阳,地铁来了!". news.gzdsw.com. Retrieved 2019-03-19.
- 1 2 3 "贵阳轨道交通2号线4月28日全线开通运营". Archived from the original on April 26, 2021.
轨道交通2号线开通初期运营后,贵阳市有2条地铁线路开通运营,全网线路长度增加到75.7公里,其中,1号线35.1公里,2号线40.6公里
- 1 2 3 "贵阳地铁3号线一期、S1线一期、T2线一期建成投用时间". 2023-01-09.
确保2023年3号线一期建成投用,2024年S1线一期、T2线一期建成投用
- ↑ "贵阳有轨电车T2线正式开工". 贵阳晚报.
- ↑ "贵阳市轨道交通1号线全线正式开通初期运营". 2018-12-01. Archived from the original on October 25, 2019.
- ↑ "贵阳轨道交通1号线全线开通运营 全长35.11公里设25座车站". 2018-12-01.
- ↑ "官宣!贵阳地铁2号线全线试运行,票价及站名公布(附换乘攻略)". Retrieved 2020-12-30.
- ↑ "贵阳地铁2号线试运行 部分市民代表参加试乘体验". 2020-12-29.
- ↑ "贵阳市轨道交通S1线正式开工!". 2019-11-07.
- ↑ "刚刚,贵阳轨道交通S1线正式开工!". 2019-11-07.
- ↑ "正公示!贵阳有轨电车T2线一期工程计划8月开工!13座车站公布→".
- ↑ "贵阳市有轨电车示范线(T2线一期工程) 首次环境影响评价信息公开". 贵阳轨道交通.
- ↑ "贵阳市城市轨道交通远景年线网规划图". 2016-07-11.