Kannur International Airport | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Summary | |||||||||||
Airport type | Public | ||||||||||
Owner/Operator | Kannur International Airport Limited (KIAL) | ||||||||||
Serves | Kannur | ||||||||||
Location | Mattanur, Kannur district, Kerala, India | ||||||||||
Opened | 9 December 2018[1] | ||||||||||
Operating base for | |||||||||||
Elevation AMSL | 76 m / 249 ft | ||||||||||
Coordinates | 11°55′N 75°33′E / 11.92°N 75.55°E | ||||||||||
Website | www | ||||||||||
Map | |||||||||||
CNN CNN CNN CNN | |||||||||||
Runways | |||||||||||
| |||||||||||
Statistics (April 2022 - March 2023) | |||||||||||
| |||||||||||
Kannur International Airport (IATA: CNN, ICAO: VOKN) is an international airport serving the city of Kannur and the North Malabar region of Kerala, Kodagu district of Karnataka and Mahé district of Puducherry in India. It is located 28 km (17 mi) east of Kannur, and 24 km (15 mi) east of Thalassery, near the municipality of Mattannur in Thalassery taluka of Kannur district. It is owned and operated by Kannur International Airport Limited (KIAL), a public–private consortium. The airport opened for commercial operations on 9 December 2018.[5]
The airport served one million passengers in just nine months since commercial operations began.[6][7] Amidst the COVID-19 pandemic, the airport could maintain stable growth, and it achieved the milestone of two million passengers in the twenty-third month of operations in November 2020.[8]
The first aircraft to land was an Indian Air Force (IAF) aircraft that touched down at the airport on 29 February 2016.[9] The first trial passenger flight operation was conducted on 20 September 2018, using a Boeing 737-800 aircraft from Air India Express.[10][11] On the inaugural day, 9 December 2018, an Air India Express flight IX 715 (Boeing 737-800) took off to Abu Dhabi at 10:13 (IST), becoming the first commercial passenger aircraft to depart from Kannur International Airport.[12][5][13][14] The airport was inaugurated by then Minister of Civil Aviation, Suresh Prabhu and Chief Minister of Kerala, Pinarayi Vijayan.
History
Kannur had an airstrip used for commercial aviation as early as 1935 when TATA airlines operated weekly flights between Bombay and Trivandrum – stopping at Goa and Cannanore.[15] This airstrip was located within the Kannur Cantonment area at Fort Maidan.[16] The operator started service to Kerala on 29 October 1935 but service did not last long.[17]
The long-standing demand for a full-fledged airport was only conceptualized in 1997, when C. M. Ibrahim, the then Union Minister of Civil Aviation, backed the proposal for an airport in the district. The vast extent of land at Moorkhanparamba near Mattannur was identified for the project a few months later following a hectic search for land for developing the proposed airport. The then Chief Minister of Kerala V. S. Achuthanandan laid the foundation stone for the airport at the project site marking the formal commencement of construction activities on 17 December 2010 at a function attended by the then Civil Aviation Minister Praful Patel.[18] Though the State government accorded sanction for the Kannur International Airport project in January 1998 and appointed Kerala Industrial Infrastructure Development Corporation (KINFRA) as the nodal agency for its implementation, it had to wait for a decade until it was finally approved by the Central government in January 2008. During the period, a private agency appointed by Kerala Industrial Infrastructure Development Corporation (KINFRA) to study techno-economic feasibility report submitted its report.[19] The earlier site proposed at Madayipara was dropped owing to ecological concerns. Two vast plateaus near Mattannur were identified for the airport, namely Moorkhanparamb and Velliyamparamb, with about 1300 acres and 800 acres of land to be acquired from each respectively.[20][21][22][23]
After a prolonged wait, the airport received in-principle approval from the Ministry of Civil Aviation and Union cabinet in January 2008.[24] Land acquisition began in December 2008 after issuing notifications and fixing compensation.[25] The public company Kannur International Airport Limited (KIAL), under the Public-Private Partnership (PPP) model, was registered in October 2009.[26] The foundation stone for the airport was laid on 17 December 2010 by then-Chief Minister V. S. Achuthanandan.[27] On 26 November 2013, KIAL and Larsen & Toubro Ltd are scheduled to sign a contract on construction work at the airport. In January 2014, The Kerala State Government Minister for Excise and Ports announced the Kerala State Government and AAI plan to sign an MoU on the equity structure of Kannur International Airport Limited.[28]
Construction work at the airport was inaugurated by Defence Minister and senior Congress leader A. K. Antony on 2 February 2014. On 29 February 2016, The first trial flight was landed and Chief Minister Oommen Chandy Flag off for the inauguration of Runway.[29]
Kannur International Airport commenced operations on 9 December 2018.[30] The first commercial aircraft to operate out of the airport was Air India Express IX 715 (Boeing 737-800) to Abu Dhabi, which took off at 10:13 (IST) on the same day.[31][14] The flight was jointly flagged off by the Chief Minister of Kerala, Pinarayi Vijayan and Union Minister for Civil Aviation, Suresh Prabhu.[31]
Aircraft of several foreign airlines touched down for the first time at Kannur International Airport in June 2020 as part of the repatriation flights arranged owing to the COVID-19.[32][33] Widebody aircraft also landed for the first time in June.[34] Airbus A330-200 of Kuwait Airways, was the first foreign airline and also the first widebody aircraft that landed at Kannur.[35] The aircraft of Kuwait Airways,[35][36]Fly Dubai,[37]Jazeera Airways,[36]Salam Air,[38]Gulf Air,[39]Air Arabia,[40] Etihad Airways,[41]Saudia,[39] and Oman Air[42] operated to and from Kannur during June–August 2020 as repatriation/chartered flights. Though several international airlines have reportedly shown interest in operating from Kannur, they are unable to operate regularly scheduled flights from Kannur airport as the airport lacks ‘point of call’ status.[43][44][45][46][47]
Construction
By August 2010, acquisition of about 1200 acres of land was completed in two phases, and acquisition of another 780 acres was in progress for the third phase.[48][49]
In July 2011, the Oommen Chandy government decided to make Airports Authority of India a consultant tasked with preparing a revised techno-economic feasibility report and a new master plan and design.[50] As the Airports Authority of India failed to submit the report in time, the consultancy was canceled and Cochin International Airport (CIAL) was entrusted to prepare the detailed project report, but the floating of tenders for construction was further delayed as experts found several technical flaws in the design prepared by CIAL.[51][52]
Land acquired by the government under KINFRA was transferred to KIAL earlier in February 2012.[53] In August 2012, Mumbai based company STUP Consultants Pvt Ltd. was made consultant to review the revised report by CIAL and to assist KIAL in other aspects of the project, but the agreement was canceled within two weeks as it was found that the company had been blacklisted in other states.[54][55] Fresh bids were solicited and Hong Kong-based AECOM Asia was awarded the consultancy.[56][57] The project office was inaugurated at Mattannur in December 2012.[58]
EPC-I & EPC-II
It was decided to build the airport in two stages of engineering, procurement, and construction (EPC). The first stage, EPC-I included complete earthwork, runway, taxiway, apron, ground lighting and associated infrastructure such as perimeter and operational walls.
The second stage, EPC-II, involved the integrated terminal building, air traffic control tower, administrative and technical blocks, and facilities in the buildings such as aerobridges, escalators, elevators and counters.[59] Infrastructure and engineering conglomerate Larsen & Toubro (L&T) was awarded work for EPC-I on 27 November 2013, after inviting bids.[60] Airport work was flagged off by the then Defense Minister A.K. Antony at a public function in Mattannur on 2 February 2014.[61] L&T also won the tender for EPC-II works including the construction of the passenger terminal building (PTB) on 25 June 2014.[62] A huge amount of earthwork was carried out at the site including the cutting and filling of a total 2,340,000 cubic metres (3,060,000 cu yd) of land at a maximum rate of 70,000 cubic metres (92,000 cu yd) per day.[63] About 50% of the land works and foundation and piling work for constructing the PTB and air traffic control tower were completed by March 2015.[64] By August 2015, about 60% of the runway was completed. Steps were initiated to procure lifts, a baggage handling system, passenger boarding bridges, and the four Airfield Crash Fire Tenders.[65] About 70% of the work on the runway, apron and associated work, and 52% of the PTB and allied work was completed by December 2015.[66] Works for a 28,000 square metres (33,000 sq yd) fuel farm also began the same month.[67] The then Kerala Airports Minister K. Babu ruled out the popular demand to extend the runway to 4,000 metres (4,400 yd).[68] Meanwhile, the third phase of land acquisition involving about 785 acres on Velliyamparmb, which began in 2011, had been progressing at a very slow pace and only 612 acres were acquired in five years.[69] The late decision to acquire more land for a runway extension from 3,050 metres (3,340 yd) to 3,400 metres (3,700 yd) on the western side, in the finishing stages of the project, triggered protests from residents.[70] A trial landing was conducted on a completed 2,400 metres (2,600 yd) runway by a 14-seater code B aircraft on 29 February 2016. The air traffic control tower was not involved as it was still under construction. Technical assistance of the Aviation Control of the Calicut airport was sought for the landing. No runway calibration, or testing of flight parameters, was done during the landing. The trial landing was organized as a major event by the authorities and involved extensive public participation. The Oommen Chandy government faced fierce criticism for organizing such an event when the whole airport project was not complete. The opposition termed it an "election stunt" as Kerala was going to the polls in the coming months. Around ₹30 lakh (US$38,000) were spent on the event.[71][72][73][74][75]
By May 2016, the 3,050 metres (3,340 yd) runway was completed with work on the 150 metres (160 yd) grading side strip on both ends progressing. 68% of the PTB, 75% of the ATC tower and much of the work for the fuel farm was completed. Work on the ancillary buildings – fire rescue station, power house, the area for the India Meteorological Department (IMD), sewage treatment plant, service block, and the airfield ground lighting substation were progressing.[76] The newly elected Pinaryi government decided to begin land acquisition to extend the runway to 4,000 metres (4,400 yd) in August 2016.[77]
Phase I & Phase II
The Phase I expansion period is from 2016–17 to 2025–26. It includes a 4,000 metres (4,400 yd) runway extension, a full-length taxiway, commissioning of a fuel farm, an aviation academy etc. and developing city side facilities. Works for the Phase-I expansion are already progressing. A cargo terminal and cargo complex which was initially in Phase-II has been shifted to Phase I and is under construction. The Phase II expansion will happen from 2026–27 to 2045–46. It includes another runway and a dedicated domestic terminal at Veliamparamba, and a long flyover to link it with Moorkhanparamba.[69][78][79][80][81]
Management
Kannur International Airport is the second greenfield airport to be built on a public private partnership (PPP) platform in Kerala. The airport is managed by Kannur International Airport Ltd.(KIAL), a public company.[82] Venu V, IAS, is the current managing director of KIAL.[83] Chief minister of Kerala holds the post of chairman. The principle investor in KIAL, the Government of Kerala, owns 32.86% of the company's shares. Other shareholders are: 22.54% by State and Central Public Sector Undertakings, 9.39% by Airports Authority of India, 35.21% by others, including QIBs, Individuals, Companies, Cooperative, Banks/Societies, and other legal entities as approved by the Board of Directors from time to time.
Terminals
The airport has an integrated passenger terminal for both international and domestic travellers with a floor area of 97,000 m2 (1,040,000 sq ft) for arrival and departure separately. It is able to handle up to 2,000 passengers during peak hours with its unique swing facility. It features six aerobridges with 48 check-in counters, 32 emigration counters, 16 customs counters, four conveyor belts and access control inside the terminal. The passenger terminal will use the swing facility. The international gates are used for domestic operations when there are no international flights. The passenger terminal building has a double skin aluminium roofing system and efficient LED lighting adopting the green building concept.[84][62][85][78]
Cargo terminal
A cargo terminal complex having an 8-floor space of 32,000 m2 (340,000 sq ft) will also be constructed.[86][87]
Airlines and destinations
Airlines | Destinations |
---|---|
Air India Express | Abu Dhabi, Bahrain, Bangalore,[88] Doha, Dubai–International, Jeddah, Kuwait City, Mangalore, Muscat, Riyadh, Sharjah,[89] Thiruvananthapuram |
IndiGo | Bangalore, Chennai, Doha, Hyderabad, Kochi, Mumbai,[90] Thiruvananthapuram,[91] Tiruchirappalli[92] |
Statistics
Operational infrastructure
Kannur Airport has one runway, 07/25 which is 3,050 by 45 metres (10,007 by 148 feet).[93] Runway 07/25 orientation permits an obstacle-free approach. Runway 25's end will have Category I approach lighting and the 07 end will have simple approach lighting. The runway will be extended to 4,000 metres (13,000 ft) after the airport is commissioned. Land acquisition of about 260 acres is underway for this purpose. The runway will have a full-length parallel taxiway and its apron will allow 20 wide-bodied aircraft to park simultaneously.[94][79][95][96][78]
The airport's air navigation services and air traffic control will be handled by the Airports Authority of India (AAI). The ATC tower will be equipped with Doppler variable omni range and distance measuring equipment, air traffic system automation, instrument landing system, voice recorder, and a GPS clock system. It will have VHF communication facilities and equipment for obtaining radar signals from the Cochin International Airport. The tower is 30 metres (98 ft) high and has a floor area of 1,923 square metres (20,700 sq ft).[97][64][98]
Various weather monitoring, weather forecasting and alert systems are being installed at the airport by the India Meteorological Department (IMD). The Automated Weather Observing System (AWOS) for weather observations, is supplemented by climatological data, weather forecasting and aerodrome warning from IMD. The IMD will send minute-by-minute weather updates in the form of audio messages directly to pilots, instead of passing the information manually to the ATC and through them to the pilot. The information could include wind speed, gusts and direction, temperature and dew point, visibility, density, altitude, thunderstorm, lightning etc. ensuring smooth aircraft operation.[99]
The airport will have a 300 metres (330 yd)-long, 90 metres (98 yd)-wide runway end safety area (RESA) on both ends of the runway. This reduces the risk of casualties and damage to aircraft in the event of an undershoot, overshoot or excursion from the runway. The RESA is protected with a Reinforced Earth wall. The airport will have an isolation bay towards the 07 side. An isolation bay, with a diameter of 125 metres (137 yd) is a special parking space created for an aircraft facing an exigency like hijack or bomb threat.[100][101][102][78]
Various ground support equipment (GSE) will be available to service the aircraft between flights. These include dollies, chocks, aircraft service stairs, aircraft refuelers, transporters, catering vehicles, and belt loaders. Ground handling in the airport will be managed by Air India Air Transport Services Ltd. (AI-ATSL).
Aviation fuel farm
The airport has a 28,000 square metres (33,000 sq yd) fuel farm constructed and operated as a joint venture company floated by KIAL and Bharat Petroleum Corporation Ltd. (BPCL) — the BPCL-KIAL Fuel Farm Private Ltd. The Rs. 17-crore fuel farm has underground tanks for aviation fuel storage and will provide fuel for aircraft operating from the airport. BPCL has a Rs. 170-crore stake in KIAL.[103]
MRO
Kannur Airport will have an aircraft maintenance, repair and overhaul unit- MRO facility. A large maintenance terminal is dedicated for this. The facility is expected to cater to both narrow and wide-bodied aircraft. The MRO will undertake maintenance work on aircraft and their components, such as jet engines, landing gear, air frames and components and will involve line maintenance and hangars.[104][78]
Enclaves
The airport will have an Indian Navy air enclave on ten acres of land. The location is a priority for the Navy since the Ezhimala Naval Academy, the only naval academy in India, and the largest in Asia, is just 60 kilometres (37 mi) away from the airport. Ezhimala is also a strategic defense location. The original demands for transfer of the ten acres of airport land to the Navy included having a representative from Southern Naval Command on KIAL's board of directors, to set up the enclave. This was dropped by the Navy. The land was transferred to the Navy on a long-term lease against token rent for establishing the enclave.[105][106][107]
The Indian Air Force will have a presence at the airport with a separate enclave set up on ten acres of land. Defense officials had approved the enclave in view of the airport's strategic location. Kannur Cantonment, the only Army Cantonment in Kerala is 30 kilometres (19 mi) away from the airport. The land provided on a long-term lease, against a token rent, is located beside the operational apron of the airport. Work on the enclave's hangars and administrative buildings is underway.[106]
An enclave will be set up by Indian Coast Guard (ICG) at the Kannur airport to augment air surveillance along the coast. India's first Coast Guard Academy is located at Azhikkal, 36 kilometres (22 mi) from the airport. Considering this, the strategic location and the proximity to the coast of the airport the ICG had sought 20 acres of airport land. The KIAL board authorized the airport's managing director to provide 10 acres on a long-term lease against token rent to establish the enclave.[106][108][109]
Aviation academy
An aviation academy will be set up in the airport by the Rajiv Gandhi Aviation Academy and Technology on two acres of land allotted for it. The institute will offer students courses in aeronautics and provide flight training.[110]
HAL helicopter manufacturing base
Hindustan Aeronautics Limited (HAL) had sought airport land from KIAL to have a manufacturing base for helicopters. 80 acres of land had been allotted by the board to HAL in 2014. The HAL complex will include helicopter manufacturing for exporting, helicopter maintenance and repair, and a helicopter pilot training centre.[104]
Law and Order
The airport comes under the jurisdiction of Mattanur Airport Police station under Kannur City Police established on 12 August 2018. The jurisdictional area coming inside the airport compound wall in Morkanparamaba in Keezhallur Panchayat and area of Kallerikkara ward of Mattanur Municipality coming inside the Airport compound wall. The whole area of the station is owned by KIAL. The magisterial jurisdiction of the station is Judicial First Class Magistrate Court, Mattanur.[111]
Connectivity
Pre-paid taxi service is available at the airport round the clock. KSRTC provides service to various destinations in Kannur, Kasaragod, Kozhikode and Malappuram districts from the airport. The nearest town is at Mattannur situated 5 km (3.1 mi) away from the airport which has bus connectivity to various parts of Kannur district, Kodagu district and Mysore. Autorickshaw service is available at the airport to Mattannur. The closest railway stations are at Thalassery (25 km [16 mi]) and Kannur (27 km [17 mi]) from the airport. Till date, there is no Uber or Ola Cabs service facility from the airport.
Future developments
The proposed Kannur-Mysore National Highway under Bharatmala project, passes through Airport provides easy access to the important cities and towns in Kerala and Karnataka states.[112][113]
Kerala government has given node for developing Mattanur-Kootupuzha road, Thalassery-Anjarakandy-Mattanur road, Kuttiady-Panoor-Mattanur road, Mananthavady-Mattanur road, Kannur-Airport roads for better connectivity.[114][115]
See also
References
- ↑ "'Come..let's fly from Kannur': Kerala's fourth international airport to open on Dec 9". 8 October 2018.
- ↑ "Annexure III – Passenger Data" (PDF). aai.aero. Retrieved 24 April 2023.
- ↑ "Annexure II – Aircraft Movement Data" (PDF). aai.aero. Retrieved 24 April 2023.
- ↑ "Annexure IV – Freight Movement Data" (PDF). aai.aero. Retrieved 24 April 2023.
- 1 2 "Kannur airport inauguration". OnManorama. Retrieved 9 December 2018.
- ↑ "Kannur airport has served one million passengers in nine months". The News Minute. 11 September 2019.
- ↑ "Kannur airport records 10 lakh passengers with 15-yr-old Singapore girl | Kozhikode News - Times of India". The Times of India.
- ↑ "Two million Passengers at Kannur International Airport | kannurairport". kannurairport.aero.
- ↑ "Kerala gets its 4th international airport at Kannur: 10-point cheat-sheet". www.timesnownews.com.
- ↑ "Watch: First trial passenger flight lands at new Kannur International Airport". The News Minute. 20 September 2018.
- ↑ Nazeer, Mohamed (20 September 2018). "Trial landing at Kannur airport" – via www.thehindu.com.
- ↑ "Kannur International Airport inauguration LIVE: First flight flagged off, operations commenced". The Indian Express. 9 December 2018. Retrieved 9 December 2018.
- ↑ "First flight from Kannur airport flagged off". Mathrubhumi. Retrieved 9 December 2018.
- 1 2 "IX715 - Air India Express IX 715 Flight Tracker". FlightStats. Retrieved 9 December 2018.
- ↑ Sudhakaran, P. "Kannur flew, way before its first airport - Times of India". Timesofindia.indiatimes.com. Archived from the original on 18 May 2017. Retrieved 24 December 2017.
- ↑ "Kannur saw flight landings even before Independence". The Indian Express. 10 December 2018. Retrieved 24 November 2020.
- ↑ "Kerala celebrates 75th anniversary of civil aviation". The Hindu. PTI. 29 October 2010. ISSN 0971-751X. Retrieved 24 November 2020.
{{cite news}}
: CS1 maint: others (link) - ↑ "VS lays foundation stone for Kannur international airport". 17 December 2010 – via www.thehindu.com.
- ↑ "Kannur airport set to be a dream come true". 21 November 2010 – via www.thehindu.com.
- ↑ "Kannur airport set to be a dream come true". The Hindu. 21 November 2010. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
- ↑ "Kannur airport: land acquisition process on - KERALA". The Hindu. 22 August 2010. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
- ↑ "Land for airport: new rates sought - KERALA". The Hindu. 6 December 2011. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
- ↑ "airport land map". The Hindu. 26 November 2012. ISSN 0971-751X. Archived from the original on 7 January 2018. Retrieved 8 December 2017.
- ↑ KERALA. "Cabinet clearance for Kannur airport - KERALA". The Hindu. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
- ↑ KERALA. "Land acquisition for Kannur airport from December - KERALA". The Hindu. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
- ↑ KERALA. "Land for airport by January - KERALA". The Hindu. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
- ↑ "VS lays foundation stone for Kannur international airport". The Hindu. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
- ↑ "Kannur International Airport". centreforaviation.com.
- ↑ "1st Trial Flight Lands In North Kerala, Oommen Chandy Says 'It Will Boost Development'". NDTV.com.
- ↑ "Kannur International Airport inauguration LIVE: First flight flagged off, operations commenced". The Indian Express. Retrieved 9 December 2018.
- 1 2 "First flight from Kannur airport flagged off". Mathrubhumi English. Retrieved 9 December 2018.
- ↑ "- ET TravelWorld". ETTravelWorld.com.
- ↑ "Kannur Airport operates 300 international flights and brings back 50000 Pravasis during covid pandemic".
- ↑ "Kannur Airport's Role in Bringign Back Pravasis".
- 1 2 "കണ്ണൂര് വിമാനത്താവളത്തില് ആദ്യമായി വിദേശവിമാനം; ചരിത്രത്തിന്റെ ഭാഗമായി കണ്ണൂര് സ്വദേശിയും". Mathrubhumi.
- 1 2 Hareesh, P. C. "India-Kuwait temporary flight services to be operational from August 10". Mathrubhumi.
- ↑ "Fly Dubai flight carrying expats lands in Kannur". Mathrubhumi.
- ↑ "SalamAir's third charter flight by KMCC takes-off from Muscat to Kannur". 11 June 2020.
- 1 2 "Kannur Airport's Role in Bringing Back Pravasis" (PDF).
- ↑ "Clipping of deepikanewspaper - Deepika Kannur". epaper.deepika.com.
- ↑ "ഇത്തിഹാദിന്റെ ആദ്യ വിമാനത്തിന് കണ്ണൂരിൽ ഊഷ്മള വരവേൽപ്". ManoramaOnline (in Malayalam).
- ↑ Yousuf, Kabeer (30 August 2020). "Oman Air touches down at Kannur International Airport".
- ↑ Sajit, C. p (7 December 2019). "'Point of call' status still eludes KIAL" – via www.thehindu.com.
- ↑ Nair, Vinod (19 December 2018). "SalamAir will fly to 19 cities next year".
- ↑ "Airline companies queuing up for Kannur". Mathrubhumi.
- ↑ "Gulf airlines blocked from flying to India's Kannur Int'l Airport".
- ↑ "Kerala government pushes for foreign airlines at Kannur airport". 1 September 2019 – via www.thehindu.com.
- ↑ "Land acquisition process reviewed - KERALA". The Hindu. 17 August 2010. Retrieved 24 December 2017.
- ↑ "Kannur airport set to take wings - Today's Paper". The Hindu. 21 November 2010. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
- ↑ "Kannur airport's first stage by 2014 - KERALA". The Hindu. 15 July 2011. Retrieved 24 December 2017.
- ↑ "CIAL to prepare project report for Kannur airport". The Hindu. 12 December 2011. Retrieved 24 December 2017.
- ↑ "Kannur airport project to be delayed - NATIONAL". The Hindu. 26 June 2012. Archived from the original on 17 January 2014. Retrieved 24 December 2017.
- ↑ "Kannur airport: Pact today - KERALA - the Hindu". The Hindu. Archived from the original on 7 January 2018. Retrieved 7 January 2018.>
- ↑ "KIAL signs pact with STUP for consultancy services - KERALA". The Hindu. 22 August 2012. Retrieved 24 December 2017.
- ↑ "Kannur airport: consultancy pact with STUP cancelled - NATIONAL". The Hindu. 7 September 2012. Retrieved 24 December 2017.
- ↑ "KIAL to invite fresh bids - KERALA". The Hindu. 13 September 2012. Archived from the original on 13 December 2017. Retrieved 24 December 2017.
- ↑ "Work on Kannur airport to begin soon - KERALA". The Hindu. 17 November 2012. Retrieved 24 December 2017.
- ↑ "Kannur airport in 3 years: Chandy - KERALA". The Hindu. 8 December 2012. Archived from the original on 31 August 2014. Retrieved 24 December 2017.
- ↑ "Kannur airport: work on EPC II in full swing - NATIONAL". The Hindu. 19 August 2013. Archived from the original on 30 August 2014. Retrieved 24 December 2017.
- ↑ "KIAL, L&T ink Rs. 694-crore pact - KERALA". The Hindu. 27 November 2013. Archived from the original on 30 August 2014. Retrieved 24 December 2017.
- ↑ "Antony flags off Kannur airport works". The Hindu. Archived from the original on 20 February 2014. Retrieved 24 December 2017.
- 1 2 "Tender approved for Kannur airport - KERALA". The Hindu. 26 June 2014. Retrieved 24 December 2017.
- ↑ "Kannur airport runway work on course". The Hindu. 16 June 2014. Archived from the original on 13 December 2017. Retrieved 24 December 2017.
- 1 2 "Hectic pace to Kannur airport work - KERALA". The Hindu. 26 March 2015. Retrieved 24 December 2017.
- ↑ "Kannur airport in take-off mode - NATIONAL". The Hindu. Retrieved 24 December 2017.
- ↑ "First test flight to Kannur airport deferred - KERALA". The Hindu. Retrieved 24 December 2017.
- ↑ "Fuel farm work begins at Kannur airport site". The Hindu. Retrieved 24 December 2017.
- ↑ "Minister rules out Kannur airport runway extension". The Hindu. Retrieved 24 December 2017.
- 1 2 "First flight to Kannur on 29 Feb". The Hindu. 17 February 2016. Archived from the original on 13 December 2017. Retrieved 24 December 2017.
- ↑ "All-party meet on KIAL land survey - KERALA". The Hindu. Retrieved 24 December 2017.
- ↑ "Kannur trial landing a success". The Hindu. 1 March 2016. Retrieved 24 December 2017.
- ↑ "First flight to land in Kannur today - KERALA". The Hindu. 29 February 2016. Retrieved 24 December 2017.
- ↑ "Political turmoil over Kannur airport project". The Hindu. 12 October 2015. Retrieved 24 December 2017.
- ↑ "Archived copy" (PDF). Archived from the original (PDF) on 1 July 2017. Retrieved 24 December 2017.
{{cite web}}
: CS1 maint: archived copy as title (link) - ↑ "Archived copy" (PDF). Archived from the original (PDF) on 6 June 2017. Retrieved 24 December 2017.
{{cite web}}
: CS1 maint: archived copy as title (link) - ↑ "3,050-m runway ready in Kannur". The Hindu. 1 May 2016. Retrieved 24 December 2017.
- ↑ "Land acquisition for runway work soon: CM - KERALA". The Hindu. 8 August 2016. Retrieved 24 December 2017.
- 1 2 3 4 5 "Archived copy". Archived from the original on 3 April 2016. Retrieved 9 June 2016.
{{cite web}}
: CS1 maint: archived copy as title (link) - 1 2 "With mega runway, Kannur airport in top four - NATIONAL". The Hindu. Retrieved 24 December 2017.
- ↑ "Kannur airport: Runway ready, final touch-up in progress | politics | Kannur Airport". English.keralakaumudi.com. 10 April 2017. Retrieved 24 December 2017.
- ↑ "Airport consultant reviewing report". The Hindu. 26 November 2012. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
- ↑ "Airport Project". Kannurairport.in. Archived from the original on 8 June 2017. Retrieved 24 December 2017.
- ↑ "Home-Kannur Airport". Archived from the original on 2 August 2018. Retrieved 25 May 2014.
- ↑ "Kannur airport to have 'swing' facility". The Hindu. Archived from the original on 8 July 2014. Retrieved 24 December 2017.
- ↑ "Archived copy" (PDF). Archived from the original (PDF) on 6 June 2017. Retrieved 23 November 2017.
{{cite web}}
: CS1 maint: archived copy as title (link) - ↑ "Kannur airport gearing up for September launch - KERALA". The Hindu. 8 February 2017. Retrieved 24 December 2017.
- ↑ "Kannur airport by Sept next". The Hindu. Archived from the original on 20 September 2017. Retrieved 24 December 2017.
- ↑ "Air India Express to commence Bangalore-Kannur service in Nov-2023". CAPA. Retrieved 11 October 2023.
- ↑ "Air India Express Schedule". Retrieved 31 March 2022.
- ↑ "IndiGo to resume Mumbai-Kannur service from Jul-2023". CAPA. Retrieved 15 June 2023.
- ↑ "IndiGo Schedule". Retrieved 31 March 2022.
- ↑ "IndiGo's Trichy-Kannur daily flight via Bengaluru from December". Times of India.
- ↑ "About Us". Kannurairport.in. Archived from the original on 8 June 2017. Retrieved 24 December 2017.
- ↑ "Kannur International Airport New Airport Profile | CAPA". Centreforaviation.com. Archived from the original on 22 December 2017. Retrieved 24 December 2017.
- ↑ "95 pc work completed in Kannur Airport, test flight in Feb | new airport in Kerala at Kannur". English.keralakaumudi.com. 17 December 2017. Retrieved 24 December 2017.
- ↑ "Kannur airport take-off to be delayed - KERALA". The Hindu. 3 July 2017. Retrieved 24 December 2017.
- ↑ "Agreements signed for airport - KERALA". The Hindu. 21 November 2014. Retrieved 24 December 2017.
- ↑ "Kannur airport nearing take-off stage". The Hindu. Retrieved 24 December 2017.
- ↑ "Weather alert system for Kannur airport - KERALA". The Hindu. 20 September 2014. Retrieved 24 December 2017.
- ↑ "Flights to take off from Kannur in 2016 - KERALA". The Hindu. 7 December 2013. Archived from the original on 30 August 2014. Retrieved 24 December 2017.
- ↑ "Photo gallery - Construction of Reinforced Earth Wall at Resa 07 side in progress as on 20.02.2017". Kannurairport.in. Archived from the original on 22 December 2017. Retrieved 24 December 2017.
- ↑ "Licensing procedure for Kannur airport begins - KERALA". The Hindu. 5 September 2014. Archived from the original on 6 September 2014. Retrieved 24 December 2017.
- ↑ "Fuel farm work begins at Kannur airport site - KERALA". The Hindu. Retrieved 24 December 2017.
- 1 2 "Kannur International Airport - Malabar, Ready for Take Off?". Thedollarbusiness.com. Archived from the original on 15 December 2017. Retrieved 24 December 2017.
- ↑ "Norms relaxed for Naval Air Enclave - KERALA". The Hindu. 23 November 2012. Archived from the original on 22 December 2017. Retrieved 24 December 2017.
- 1 2 3 "Defence enclaves for Kannur airport - KERALA". The Hindu. Archived from the original on 26 June 2014. Retrieved 24 December 2017.
- ↑ "Campus". INA. Archived from the original on 24 October 2017. Retrieved 24 December 2017.
- ↑ "Coast Guard Academy to be ready in over 3 years: Director General - KERALA". The Hindu. Archived from the original on 22 December 2017. Retrieved 24 December 2017.
- ↑ "First Coast Guard academy to come up at Azheekkal". The Hindu. 27 February 2011. Retrieved 24 December 2017.
- ↑ "KIAL firm on December date for trial landing - KERALA". The Hindu. 13 October 2015. Retrieved 24 December 2017.
- ↑ "About - Mattanur Airport PS". keralapolice.gov.in.
- ↑ "Kannur-Mysuru corridor to be made NH". The Hindu. Retrieved 26 July 2017.
- ↑ "11 roads to be added in second phase of Bharatmala project". Times of India. Retrieved 15 July 2021.
- ↑ "Govt speeds up work of roads connecting Kannur airport". Times of India.
- ↑ "Steps to develop airport road". The Hindu. Retrieved 10 October 2019.
External links
Media related to Kannur International Airport at Wikimedia Commons