STS-91
Discovery lands at Kennedy, concluding the last mission in the Shuttle–Mir program
NamesSpace Transportation System-91
Mission typeShuttle-Mir
OperatorNASA
COSPAR ID1998-034A
SATCAT no.25356
Mission duration9 days, 19 hours, 54 minutes, 2 seconds
Spacecraft properties
SpacecraftSpace Shuttle Discovery
Landing mass117,861 kilograms (259,839 lb)
Payload mass16,537 kilograms (36,458 lb)
Crew
Crew size6 up
7 down
Members
Landing
Start of mission
Launch date2 June 1998, 22:06:24 (1998-06-02UTC22:06:24Z) UTC
Launch siteKennedy LC-39A
End of mission
Landing date12 June 1998, 18:00:18 (1998-06-12UTC18:00:19Z) UTC
Landing siteKennedy SLF Runway 15
Orbital parameters
Reference systemGeocentric
RegimeLow Earth
Perigee altitude350 kilometres (220 mi)
Apogee altitude373 kilometres (232 mi)
Inclination51.7 degrees
Period91.8 min
Docking with Mir
Docking portSO starboard
Docking date4 June 1998, 16:58 UTC
Undocking date8 June 1998, 16:01 UTC
Time docked3 days, 23 hours, 3 minutes

Left to right – Front: Gorie, Precourt; Back: Lawrence, Chang-Diaz, Kavandi, Ryumin, Thomas
 

STS-91 was the final Space Shuttle mission to the Mir space station. It was flown by Space Shuttle Discovery, and launched from Kennedy Space Center, Florida, on 2 June 1998.[1]

Crew

Position Launching Astronaut Landing Astronaut
Commander United States Charles J. Precourt
Fourth and last spaceflight
Pilot United States Dominic L. Pudwill Gorie
First spaceflight
Mission Specialist 1 Costa Rica/United States Franklin R. Chang-Diaz
Sixth spaceflight
Mission Specialist 2 United States Wendy B. Lawrence
Third spaceflight
Mission Specialist 3 United States Janet L. Kavandi
First spaceflight
Mission Specialist 4 Russia Valery Ryumin, RKA
Fourth and last spaceflight
Mission Specialist 5 None Australia / United States Andrew S. W. Thomas
EO-25
Second spaceflight

Mission highlights

STS-91 marked the final Shuttle/Mir Docking Mission, as well as the only such docking for Discovery. This Phase 1 Program was a precursor to the International Space Station maintaining a continuous American presence in space and developing the procedures and hardware required for an international partnership in space.

The mission was the first to use the super lightweight external tank (SLWT) which was the same size, at 154 feet (47 m) long and 27 feet (8.2 m) in diameter, as the external tank used on previous launches, but 7,500 pounds (3,400 kg) lighter. The tank was made of an aluminium lithium alloy and the tank's structural design had also been improved making it 30 percent stronger and 5 percent less dense. The walls of the redesigned hydrogen tank were machined in an orthogonal waffle-like pattern, providing more strength and stability than the previous design. These improvements would later provide additional payload capacity to the International Space Station.

Docking of Discovery to Mir, the first for that orbiter, occurred at 16:01 UTC, 4 June 1998 at an altitude of 208 miles. Hatches opened at 2:34 pm the same day. At hatch opening, Andy Thomas officially became a member of Discovery's crew, completing 130 days of living and working on Mir. The transfer wrapped up a total of 907 days spent by seven U.S. astronauts aboard the Russian space station as long-duration crew members. During the next four days, the Mir 25 and STS-91 crews transferred more than 500 kilograms (1,100 lb) of water, and almost 2,130 kilograms (4,700 lb) of cargo experiments and supplies were exchanged between the two spacecraft. During this time, long-term U.S. experiments aboard the Mir were moved into Discovery's middeck locker area and the SPACEHAB single module in the orbiter's payload bay, including the Space Acceleration Measurement System (SAMS) and the tissue engineering co-culture (COCULT) investigations, as well as two crystal growth experiments. The crews also conducted Risk Mitigation Experiments (RMEs) and Human Life Sciences (HLS) investigations. When the hatches closed for undocking at 9:07 am, 8 June, and the spacecraft separated at 12:01 pm that day, the final Shuttle-Mir docking mission was concluded and Phase 1 of the International Space Station (ISS) program came to an end.

Mir as seen from Discovery after undocking

STS-91 also carried a prototype of the Alpha Magnetic Spectrometer (AMS) into space. The AMS, designed to look for dark and missing matter in the universe, was powered up on Flight Day 1. Data originally planned to be sent to ground stations through Discovery's Ku-band communications system was recorded on board because of a problem with the Ku-band system that prevented it from sending high-rate communications, including television signals, to the ground. The system was able to receive uplink transmissions. On 3 June 1998 the crew was able to set up a bypass system that allowed AMS data to be downlinked via S-band/FM communications when the orbiter came within range of a ground station. Data that could not be recorded by ground stations was recorded on board throughout the mission.

The Ku-band system failure was determined to be located in a component that was not accessible to the crew. The failure prevented television transmission throughout the mission. Television broadcasts from Mir were prevented by a problem between a Russian ground station and the mission control center outside Moscow, limiting communications to audio only on NASA television.

Other experiments conducted by the Shuttle crew during the mission included a checkout of the orbiter's robot arm to evaluate new electronics and software and the Orbiter Space Vision System for use during assembly missions for the ISS. Also on board in the payload bay were eight Get Away Special experiments, while combustion, crystal growth and radiation monitoring experiments were conducted in Discovery's mid-deck crew cabin area.

See also

References

  1. Suriano, Robyn (3 June 1998). "Final Flight to Mir Begins". Florida Today. p. 1. Retrieved 7 June 2022.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.