Eglinton East LRT
Overview
StatusProposed
LocaleToronto, Ontario
Termini
Stations27
Service
TypeLight rail
SystemToronto subway
Services2
Operator(s)Toronto Transit Commission
Technical
Line length18 kilometres (11 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map

Kennedy
(Line 2 to Sheppard East)
Kennedy GO
Stouffville line
Kennedy (EELRT terminal)
Midland
Falmouth
Danforth
McCowan
Eglinton GO
Lakeshore East line
Mason
Markham
Eglinton/Kingston
Guildwood Parkway
Guildwood GO
Lakeshore East line
Galloway
Lawrence
Kingston/Morningside
West Hill
Ellesmere (DSBRT)
UTSC
Pan Am Sports Centre
Morningside/Sheppard
MSF
Sheppard/Brenyon
Sheppard/Neilson
Neilson / Berner Trail
Malvern Town Centre
Washburn
Markham North
Shorting
McCowan/Sheppard
Line 2 to Kipling
Line 4 to Sheppard–Yonge (proposed)

The Eglinton East LRT (EELRT), also known as Line 7 Eglinton East[1]:24 and formerly known as the Scarborough Malvern LRT, is a proposed light rail line in Toronto, Ontario, Canada. The line would be entirely within the district of Scarborough.[2] It was originally part of Transit City, a plan to develop new light rail lines along several priority transit corridors in the city.

Unlike Line 5 Eglinton, which is a Metrolinx project, the EELRT is a City of Toronto project. As of 2022, the plan is that the EELRT be operated separately from Line 5 Eglinton; both would terminate at Kennedy station.[3] As of November 2023, the estimated cost of the EELRT was $4.65 billion, with construction expected to occur between 2027 and 2034.[4]

History

Transit City

The Scarborough Malvern LRT was part of Toronto mayor David Miller's Transit City proposal announced on 16 March 2007, to be operated by the Toronto Transit Commission. In 2008, the Scarborough Malvern LRT was included in Metrolinx's regional transportation plan The Big Move within that plan's 25-year horizon.[5] In 2009, the initial design for the Scarborough Malvern LRT was completed.[2]:11 The line was expected to cost approximately $1.26 billion, including vehicles, property, escalation and an apportioned cost of the maintenance and storage facilities. With construction originally scheduled to begin in 2014, the line was expected to open in 2019 as the last of the seven Transit City lines.

The Scarborough Malvern LRT was approved by Toronto City Council on 30 September 2009,[6] and the environmental assessment received a notice to proceed from the Government of Ontario on 15 December 2009.[7] After a change in municipal leadership, it was cancelled by Mayor Rob Ford on 1 December 2010, when he announced the cancellation of the entire Transit City initiative.[8][9] While LRT lines on Sheppard East, Finch West, and Eglinton were revived through a new agreement between the City of Toronto and Metrolinx, the Scarborough Malvern LRT was not included.[10]

Crosstown extension

In 2016, the city directed staff to resurrect and update the 2009 plan for the Scarborough Malvern LRT. The project was renamed the Eglinton East LRT. Until 2021, the city considered making the EELRT an eastward extension of Line 5 Eglinton.[2]:11,12

In 2016, to complement the Scarborough Subway Extension (SSE), the planned extension of Line 2 Bloor–Danforth to Scarborough Town Centre, the City of Toronto drafted a plan to extend Line 5 Eglinton farther east into Scarborough to terminate at the University of Toronto Scarborough campus.[11] On 20 January 2016, Toronto City Council approved revisions to the Scarborough subway plan that would include reviving much of the original plan for the Scarborough Malvern LRT as a 12-kilometre (7.5 mi) eastern extension of Line 5 Eglinton to University of Toronto Scarborough, rebranded as "Crosstown East",[12] and later renamed "Eglinton East" in 2017.[13] The extension would add 18 new stops east of Kennedy station and serve an estimated 43,400 additional riders per day (a ridership similar to that of the Line 4 Sheppard subway).[14] The extension was expected to serve "neighbourhood improvement areas" (often low-income areas) such as Eglinton East, Scarborough Junction, Morningside, Scarborough Village and West Hill.[15]

In November 2017, the project was mostly unfunded, with the cost estimated at $1.6 to $1.7 billion, with an estimated completion date of 2023.[13][16] At a November 2017 public meeting, city staff presented the possibility of extending the Eglinton East LRT by six stops to Malvern Town Centre. The Malvern extension would be 4.2 to 4.7 kilometres (2.6 to 2.9 mi) long.[13] The extension to Malvern Town Centre would have seven stops: at Pan Am Drive, Sheppard/Morningside, Brenyon Way, Murison Boulevard, Sheppard/Neilson, Wickson Trail, and Malvern Town Centre.[17]

In April 2019, Ontario premier Doug Ford announced a plan for Toronto rapid transit that included the Eglinton West LRT (a westward extension of Line 5 Eglinton), the Scarborough Subway Extension of Line 2, the Yonge North Extension of Line 1 and the Ontario Line. The Eglinton East LRT was noticeably not included and was left off the accompanying map.[18]

By October 2020, the City of Toronto and the TTC were in the process of implementing bus-only lanes from Kennedy station to the University of Toronto Scarborough campus via Eglinton Avenue, Kingston Road and Morningside Avenue as part of the RapidTO bus rapid transit scheme, which approximates the route of the Eglinton East LRT. The lanes were anticipated to be fully installed and operational by that November. As well as "red carpet" bus lanes, bus stops were also consolidated to approximately the same configuration and frequency of proposed LRT stations, with certain lower-order curbside stops  such as those at Huntington Avenue, Brimley Road, Oswego/Barbados Roads and Torrance Avenue  being removed entirely.[19]

In December 2020, the City of Toronto announced changes to the Eglinton East LRT proposal. The tunnel portal at Kennedy station would be extended eastwards to Huntington Avenue due to changes in the Scarborough Subway Extension project, which involved modifying the depth of the tunnel as well as adding a third subway track for service improvements. A station at Midland Avenue was moved underground as a result. A new maintenance and storage facility north of the University of Toronto Scarborough was added to the plan as a result of the Sheppard East LRT cancellation. Originally, both the Eglinton East LRT and the Sheppard East LRT were to have shared a maintenance and storage facility at Conlins Road east of Sheppard and Morningside. The other aspects of the project remained the same, including a tunnel under Kingston Road and Morningside Avenue due to traffic congestion at the Kingston/Lawrence and Morningside area.[20]

In December 2020, the council directed staff to study the entire original route to Malvern Town Centre[1] and begin a high-level design.[2] Since the province had agreed to fully fund the Scarborough Subway Extension, Mayor John Tory requested in 2021 that the $1.2 billion the city had accumulated for that project be redirected to the Eglinton East line.[21]

Standalone line

By 2022, city planning staff had concluded a through-service connection at Kennedy station was not feasible as an EELRT tunnel would be only 2 metres (6 ft 7 in) above the SSE tunnel at Kennedy station, and the SSE tunnel structure would not be strong enough to safely support an EELRT tunnel above it.[1]:24 Thus, city staff proposed a "distinct-service concept" for the EELRT. Doing so would result in lower construction costs, a shorter construction period, fewer private property impacts and design flexibility. With this flexibility, the EELRT would not need to conform to Line 5's technology, operations, and maintenance requirements. The city could choose another type of light-rail vehicle and would use the Conlins Yard as the line's maintenance and storage facility. Previously considered tunnels between Kennedy station and Midland Avenue and under Kingston Road would be replaced by surface alignments.[3]:1,2,9 The line could also be extended farther to the under-construction terminus of the Line 2 Scarborough extension at Sheppard Avenue and McCowan Road.[1]

By May 2022, the estimated cost of the EELRT is $3.9 billion, with an expected opening in the early to mid-2030s.[3] A July 2022 TTC report and a May 2023 city presentation referred to the proposed EELRT as Line 7 and gave the line a mint green colour.[1]:24[2]:15

By the end of 2023, the high-level design was expected to be completed, along with a draft of the environmental project report (EPR) and the start of the transit project assessment process (TPAP). Public consultation began in May 2023.[2]

During the 2023 Toronto mayoral by-election, the topic of a future EELRT connecting to Pan Am Centre and the University of Toronto Scarborough, and later to Sheppard–McCowan, was frequently discussed by candidates.[22]

In November 2023, the project design was 10 percent complete, and the total revised cost of the project was $4.65 billion. At the time, the province (through Metrolinx) was considering extending Line 4 Sheppard east of Don Mills station with the potential of overlapping the EELRT route along Sheppard Avenue. Thus, in case of overlap, city planners proposed to adjust the EELRT alignment. There was also the possibility that the preferred site for the EELRT maintenance and storage facility at Sheppard Avenue and Conlins Road might not be available. Thus, city planners would look at other potential sites as a contingency.[4]

Route

The EELRT line would run for 18 kilometres (11 mi), with 27 new proposed stops between Kennedy station and two termini, one at Sheppard Avenue East and McCowan Road and the other at Malvern Town Centre.

The southern terminus of the line would be at Kennedy station at Kennedy Road and Eglinton Avenue, with connections to Line 2 Bloor–Danforth, Line 5 Eglinton, and the Stouffville GO Line. The EELRT platform would be located on the east side of the Stouffville line and on the south side of Eglinton Avenue within its own off-street, ground-level station building. There would be a pedestrian tunnel connecting the EELRT station to the Line 5 concourse. From Kennedy station, the line would enter a reserved centre median on Eglinton Avenue before crossing Midland Avenue.[2]:42,44

Running east on Eglinton Avenue East, the EELRT would pass Eglinton GO Station while continuing to Kingston Road. Just west of the Eglinton/Kingston stop, there would be a turnback and train storage track.[2]:46,49,51 Turning northeast on Kingston Road, the line would pass Guildwood GO Station. Between the Lawrence and Kingston/Morningside stops, there would be a storage track. The line would turn north on Morningside Avenue.[2]:53

Along Mornigside Avenue, the line would jog through the University of Toronto Scarborough campus (UTSC) after passing the Ellesmere stop and turning east on Ellesmere Road. The university is planning a new street on campus (dubbed New Military Trail) that would be located northeast of the existing Military Trail. The EELRT would follow this new street from Ellesmere Road back to Morningside Avenue. UTSC would have two LRT stops: the UTSC stop with the southbound platform on Ellesmere Road and the northbound platform on New Military Trail, and the Pan Am Sports Centre stop on the south side of its namesake. There are plans for a new bus terminal and connections to the planned Durham–Scarborough bus rapid transit.[2]:59

After leaving UTSC, the line would continue north until Sheppard Avenue, where the Scarborough Malvern LRT would have originally met the cancelled Sheppard East LRT. The EELRT would then continue west on Sheppard Avenue to Neilson Road, where it would split into two branches. The first branch would travel north along Neilson Road and terminate at Malvern Town Centre.[2]:15

The second branch would proceed further west from Neilson Road along the alignment of the cancelled Sheppard East LRT to McCowan Road. There, the future terminus of Line 2 Bloor–Danforth (dubbed McCowan/Sheppard station) would be constructed. The EELRT would terminate on Sheppard Avenue on the east side of McCowan Road. There would be an underground pedestrian path to the station's planned bus terminal as well as to Line 2. A project map indicates that two tail tracks for the EELRT would extend to the west side of McCowan Road. As a later project, Line 4 Sheppard could be extended from Don Mills station to Line 2's new eastern terminus (also along the alignment of the cancelled Sheppard East LRT).[2]:71

The EELRT tracks would be located in centre-of-street reserved lanes. There would be four road lanes separate from the LRT lanes along Eglinton Avenue East, Kingston Road, Morningside Avenue (north of Ellesmere Road) and Sheppard Avenue. There would be two road lanes along Morningside Avenue (south of Ellesmere Road) and along Neilson Road.[2]:29,34,37

Operations

The EELRT would use trains 50 metres (160 ft) long or less and use its own distinct vehicles (i.e. different from those used on Line 5 Eglinton) in order to better adapt to the line's conditions: no running in tunnels, shorter trains and platforms, and a better ability to climb grades to avoid expensive road infrastructure changes.[3]:8,9

Trains would operate every four to five minutes during peak periods.[2]:17

There would also be a short non-revenue branch on Sheppard Avenue from Morningside Avenue east to Conlins Road to provide access to a proposed maintenance and storage facility.[3]:6,7

Proposed stops

University of Toronto Scarborough is one of the stops along the Eglinton East LRT.
Guildwood GO Station is one of the stops along the Eglinton East LRT.
Kennedy station serves as the terminus of the Eglinton East LRT and provides a direct connection to Line 2, Line 5, and the Stouffville line, as well as the former Line 3 Scarborough.

There would be 27 stops spaced 400 metres (1,300 ft) to 1 kilometre (0.62 mi) apart for an average of 670 metres (2,200 ft).[2]:32 All LRT platforms are 50 metres (160 ft) long. Unless otherwise noted below, all centre platforms are 15.5 metres (51 ft) wide, and all side platforms are 3 metres (9.8 ft) wide. With far-side platforms, an LRT train must cross a signalized intersection to reach the platform. Parallel platforms are two side platforms that face each other.[23]:4–6

The proposed stops from north to south would be:[23]:3–6

Proposed stops
Stop nameDescription
Along Neilson Road
Malvern Town Centre Parallel platforms located next to Malvern Town Centre north of Tapscott Road
Neilson–Berner Far-side platforms located at Berner Trail and Wickson Trail
Along Sheppard Avenue East
Sheppard–McCowan
  • Centre platform (10 m [33 ft] wide) located east of McCowan Road
  • Connection to planned underground station for Line 2 Bloor–Danforth and later Line 4 Sheppard
  • Access to the underground station via elevators and staircases from the LRT platform on the surface
Shorting Far-side platforms at Shorting Road and Havenview Road
Markham North Far-side platforms at Markham Road
Washburn Far-side platforms at Washburn Way and Lapsley Road
Sheppard–Neilson Far-side platform on each of the north, east and west legs of the junction to Malvern Town Centre
Sheppard–Brenyon Far-side platforms at Brenyon Way and Breckon Gate
Morningside–Sheppard Centre platform on Sheppard Avenue west of Morningside Avenue
Along or near Morningside Avenue
Pan Am Sports Centre Far-side platforms on New Military Trail at Pan Am Drive
UTSC
Ellesmere
  • Centre platform, south of Ellesmere Avenue on Morningside Avenue
  • Connection to proposed DSBRT[2]:7
West Hill Far-side platforms, near West Hill Collegiate Institute
Along Kingston Road
Kingston–Morningside
  • Centre platform located west of Morningside Avenue
  • Centre storage track west of the platform
Kingston–Lawrence
  • Centre platform, west of Lawrence Avenue East
  • Storage track east of the platform
Galloway Far-side platforms located at Galloway Road
Guildwood GO far-side platforms located adjacent to Guildwood GO Station with connection to Lakeshore East GO train line
Guildwood Parkway Far-side platforms
Eglinton–Kingston
  • Centre platform located on Kingston Road at Eglinton Avenue
  • Storage track west of the platform
Along Eglinton Avenue East
Markham Far-side platforms located at Markham Road
Mason Far-side platforms located at Mason Road
Eglinton GO
McCowan Far-side platforms located at McCowan Road
Danforth Parallel platforms located west of Danforth Road
Falmouth
  • Centre platform located east of Falmouth Avenue with a storage track on the west side of Falmouth Avenue
  • Storage track located west of Falmouth Avenue
Midland
  • Centre platform located east of Midland Avenue
  • Storage track east of platform
Kennedy Station

See also

References

  1. 1 2 3 4 5 "Transit Network Expansion Update" (PDF). Toronto Transit Commission. 14 July 2022. Archived (PDF) from the original on 9 July 2022.
  2. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 City of Toronto; Toronto Transit Commission (May 2023). Eglinton East Light Rail Transit (EELRT)–Functional (10%) Design Phase (PDF). Eglinton East LRT: Public Consultation. Phase One Virtual Public Meetings. Archived (PDF) from the original on 18 May 2023. Retrieved 18 May 2023.
  3. 1 2 3 4 5 "Advancing City Priority Transit Expansion Projects – Eglinton East LRT and Waterfront East LRT" (PDF). City of Toronto. 25 May 2022. Archived (PDF) from the original on 1 June 2022.
  4. 1 2 "Advancing Eglinton East Light Rail Transit" (PDF). City of Toronto. November 21, 2023. Archived (PDF) from the original on December 1, 2023.
  5. "The Big Move". Metrolinx. 2008. Archived from the original on 2 May 2015. Retrieved 22 April 2015.
  6. "Request for Approval of the Scarborough-Malvern LRT Environmental Assessment Study - City Council Decision". Archived from the original on 27 January 2016. Retrieved 31 December 2015.
  7. Minister's Notice to Proceed
  8. Carter, Tristan (25 February 2011). "Jane LRT goes off the rails". Town Crier. Streeter Publications. Archived from the original on 5 September 2017. Retrieved 31 December 2015.
  9. "Mayor Rob Ford: "Transit City is over"". Toronto Life. 1 December 2010. Archived from the original on 4 December 2010. Retrieved 17 March 2014. Rob Ford's first few hours as mayor sure have been busy. As the dailies are reporting, Ford met with TTC chief general manager Gary Webster at seven this morning to let him know that Transit City, and its attendant 'war on the car', were kaput. 'I just wanted to make it quite clear that he understood that Transit City's over and the war on the car is over, and all new subway expansion is going underground', Ford said, according to the Sun. 'And that's pretty well it.'
  10. Tess Kalinowski (28 November 2012). "TTC, Metrolinx finally sign off on LRTs". Toronto Star. Archived from the original on 30 November 2012. Retrieved 28 November 2012.
  11. Moore, Oliver; Gee, Marcus (20 January 2016). "Scarborough subway would shrink under plan to extend Eglinton Crosstown". The Globe and Mail. Archived from the original on 21 January 2016. Retrieved 30 November 2017.
  12. Jennifer Pagliaro, City Hall reporter & Tess Kalinowski, Real Estate Reporter (16 January 2016). "New Scarborough transit plan 'buys peace in the land'". Toronto Star. Archived from the original on 20 January 2016. Retrieved 20 January 2016.{{cite web}}: CS1 maint: multiple names: authors list (link)
  13. 1 2 3 Pagliaro, Jennifer (29 November 2017). "Mayor John Tory and Councillor Josh Matlow square off on Scarborough transit". Toronto Star. Archived from the original on 30 November 2017. Retrieved 30 November 2017.
  14. Keenan, Edward (2 June 2016). "Priority should be alternative transit routes into downtown: Keenan". Toronto Star. Archived from the original on 4 June 2016. Retrieved 5 June 2016.
  15. Pagliaro, Jennifer; Kalinowski, Tess (16 January 2016). "New Scarborough transit plan 'buys peace in the land'". Toronto Star. Archived from the original on 20 January 2016. Retrieved 20 January 2016.
  16. Moore, Oliver (13 July 2016). "Toronto City Council approves planning for raft of transit projects". The Globe and Mail. Archived from the original on 4 April 2017. Retrieved 14 July 2016.
  17. "Eglinton East Corridor Wish Mapping". Eglinton East LRT. Archived from the original on 26 January 2019. Retrieved 26 January 2019.{{cite web}}: CS1 maint: unfit URL (link)
  18. "Eglinton East LRT left out of Ontario's new transit plan". Centennial Community and Recreation Association. 24 March 2020. Archived from the original on 24 March 2020. Retrieved 19 August 2020.
  19. "Implementation of priority bus-only lanes to be accelerated across the city; Eglinton East identified as first priority". Toronto Transit Commission. 8 July 2020. Archived from the original on 19 August 2020. Retrieved 19 August 2020.
  20. "Attachment 1 Eglinton East Light Rail Transit and the Waterfront Transit Network" (PDF). Archived (PDF) from the original on 3 December 2020. Retrieved 3 December 2020.
  21. Pagliaro, Jennifer (11 February 2021). "Mayor's executive committee approves almost $14B in spending — but nothing for supportive housing proposal for Toronto's homeless". Toronto Star. Archived from the original on 15 February 2021. Retrieved 15 February 2021.
  22. FULL DEBATE: Toronto mayoral candidates face off, archived from the original on 1 June 2023, retrieved 1 June 2023
  23. 1 2 "Eglinton East Light Rail Transit (EELRT) Alignment and Stop Assessment" (PDF). City of Toronto. November 21, 2023. Archived (PDF) from the original on December 1, 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.