Basin Bridge Gas Turbine Power Station
CountryIndia
LocationBasin Bridge, Chennai 600 012, Tamil Nadu
Coordinates13°05′55″N 80°16′10″E / 13.09861°N 80.26944°E / 13.09861; 80.26944
StatusOperational
Commission dateFebruary–March 1996
Construction cost 490.23 crores[1]
Owner(s)TNEB
Operator(s)TNEB
Thermal power station
Primary fuelNaphtha
Secondary fuelNatural gas
Power generation
Units operational4 × 30 MW
Nameplate capacity120 MW

Basin Bridge Gas Turbine Power Station is a state-owned gas fuel-based power plant located in Basin Bridge, Chennai. It has a capacity of 120 MW and is operated by the Tamil Nadu State Electricity Board.

History

The plant was constructed as a 120-MW gas turbine power plant with four units, each with a capacity of 30 MW, the plant with all the four units was commissioned in February–March 1996. The power station was built at a cost of about 400 crores. The first two units were supplied by Overseas Economic Co-operative Fund, Japan, while the third and fourth units were from BHEL.[1][2]

The plant is run and maintained by the Tamil Nadu Electricity Board (TNEB) and is normally used during peak hours (06:00 to 09:00 hours and 18:00 to 21:00 hours).[2]

Operations

The units can be operated by various fuels, such as naphtha and natural gas (dual-fuel system), and the starting fuel used is high-speed diesel (HSD). However, due to non-availability of natural gas/LNG in Chennai, the units are operated on naphtha fuel. From 20 January 2010, the units are run also as synchronous condenser to supply reactive power to the grid for better voltage profile and system stability. The plant is operated in open cycle mode.[1] The cost of generation of power at the plant was 9.72 per unit.[3]

Capacity

Unit NumberInstalled Capacity (MW)MakeDate of CommissioningFuelCombined/Open cycleStatus
130Sumitomo & ABB12 February 1996NaphthaOpen cycleRunning[4]
230Sumitomo & ABB25 February 1996NaphthaOpen cycleRunning[4]
330BHEL26 March 1996NaphthaOpen cycleRunning[4]
430BHEL31 March 1996NaphthaOpen cycleRunning[4]

Incidents

On 6 March 2000, a fire broke out at around 21:00 hours at Unit IV of the power station, which was put out by more than 20 fire tenders and Metrowater tankers. Initially, smoke emanated from the reduction gear compartment used to reduce the speed of the machine. At the time of the event, three of the four units were functioning, generating 90 MW of power. All the units were switched off as a precautionary measure until the fire was put out. There was neither any causality nor any loss of power generation.[2]

See also

References

  1. 1 2 3 "Basin Bridge Gas Turbine Power Station". TANGEDCO.gov.in. Archived from the original on 30 March 2014. Retrieved 30 March 2014.
  2. 1 2 3 Ramakrishnan, T. (7 March 2000). "'Fire' at Basin Bridge power plant". The Hindu. Chennai. Archived from the original on 25 March 2014. Retrieved 25 March 2014.
  3. "Basin Bridge Gas Turbine Power Station". tantransco.gov.in. Archived from the original on 7 April 2014. Retrieved 6 April 2014.
  4. 1 2 3 4 "Section 10: Gas Turbines" (PDF). Performance Review of Thermal Power Stations 2006-07. cea.nic.in. 2007. Archived from the original (pdf) on 23 February 2015. Retrieved 6 April 2014.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.